IDOT contract 68J70 bid tabulation
Section (5,11)RS-4;114RS-6;(4-BR)BRR. Let by Illinois DOT on June 12, 2026, Woodford, District 04. 2 bids received; low bid $8,498,702 by Advanced Asphalt Company.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 157
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Advanced Asphalt Company | $8,498,702 | Low |
| 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $9,117,146 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Asphalt Company | 2. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|---|
| 1 | T-acer rub BR RM 3 (A2011230) | EACH | 1 | $800.00 | $825.00 |
| 2 | E-picea abies 8' (D2001788) | EACH | 6 | $750.00 | $695.00 |
| 3 | Constr sta layout (XZ013798) | LS | 1 | $10,000 | $7,102.34 |
| 4 | Video insp of SS (X0323160) | LF | 200 | $20.00 | $20.00 |
| 5 | Vane drains (X0323344) | LF | 26 | $550.00 | $750.00 |
| 6 | Outlet SPL (X0324058) | EACH | 6 | $2,400.00 | $4,100.00 |
| 7 | R R FL beacon A comp (X1400326) | EACH | 6 | $18,131 | $18,131 |
| 8 | Exc & GR EX SHLD SPL (X2020060) | UNIT | 15 | $1,450.00 | $6,743.33 |
| 9 | Grad & shap ditch SPL (X2020114) | LF | 5,385 | $20.00 | $11.18 |
| 10 | Stone riprap CL B4 SP (X2810228) | TON | 49 | $220.00 | $472.04 |
| 11 | Cir-FDR emuls asphalt (X4005500) | TON | 564 | $300.00 | $372.70 |
| 12 | Cip recycling 4.0 (X4060221) | SY | 86,415 | $4.50 | $4.65 |
| 13 | HMA surf rem SPL (X4400196) | SY | 2,602 | $20.00 | $21.44 |
| 14 | HMA surf rem var DP (X4401198) | SY | 119,996 | $1.25 | $1.62 |
| 15 | Drainage scuppers adj (X5230172) | EACH | 14 | $2,214.69 | $2,150.00 |
| 16 | Water valves adj SPL (X5619210) | EACH | 6 | $1,510.70 | $1,835.90 |
| 17 | Man adjust SPL (X6025600) | EACH | 1 | $3,881.57 | $2,063.01 |
| 18 | Remov FR & GR SPL (X6050500) | EACH | 3 | $678.52 | $850.00 |
| 19 | Gutters to BE cleaned (X6061463) | LF | 535 | $2.95 | $12.25 |
| 20 | SPBGR (short radius) (X6330725) | LF | 24 | $44.50 | $115.90 |
| 21 | Linear delin panels 4 (X6350204) | EACH | 85 | $75.00 | $112.00 |
| 22 | Det loop repl (X8860105) | LF | 1,848 | $40.70 | $40.70 |
| 23 | GDRL agg eros cont (Z0001002) | TON | 853 | $110.00 | $159.85 |
| 24 | Construction layout (Z0013798) | LS | 1 | $45,900 | $35,512 |
| 25 | Drainage STR cleaned (Z0018500) | EACH | 3 | $850.00 | $850.00 |
| 26 | RR prot liability ins (Z0048665) | LS | 1 | $12,000 | $11,266 |
| 27 | Trainees (Z0076600) | HR | 5,000 | $0.80 | $0.80 |
| 28 | Trainees TPG (Z0076604) | HR | 5,000 | $15.00 | $15.00 |
| 29 | Earth excavation (20200100) | CY | 615 | $70.00 | $93.48 |
| 30 | Furnished excavation (20400800) | CY | 20 | $80.00 | $130.00 |
| 31 | Trench backfill (20800150) | CY | 51 | $89.00 | $214.00 |
| 32 | Topsoil F & P 4 (21101615) | SY | 1,970 | $12.00 | $12.95 |
| 33 | Seeding CL 3 (25000300) | ACRE | 1 | $6,000.00 | $4,350.00 |
| 34 | Nitrogen fert nutr (25000400) | LB | 86 | $5.00 | $8.95 |
| 35 | Phosphorus fert nutr (25000500) | LB | 86 | $5.00 | $8.95 |
| 36 | Potassium fert nutr (25000600) | LB | 86 | $5.00 | $8.95 |
| 37 | Mowing (25000750) | ACRE | 64 | $125.00 | $100.00 |
| 38 | Erosion contr blanket (25100630) | SY | 4,392 | $3.00 | $3.75 |
| 39 | Temp ditch checks (28000305) | LF | 72 | $10.00 | $31.58 |
| 40 | Perimeter eros bar (28000400) | LF | 5,973 | $3.50 | $13.41 |
| 41 | Inlet & pipe protect (28000500) | EACH | 19 | $200.00 | $275.00 |
| 42 | Stone riprap CL B3 (28100225) | TON | 10 | $500.00 | $1,379.74 |
| 43 | Sub gran mat B 4 (31101200) | SY | 111 | $21.00 | $25.00 |
| 44 | Agg surf cse A (40200100) | TON | 86 | $75.00 | $54.25 |
| 45 | P bit matls tack CT (40600295) | LB | 226,240 | $0.80 | $1.13 |
| 46 | Matl transfer device (40600405) | TON | 25,822 | $3.00 | $2.12 |
| 47 | HMA surf rem butt JT (40600982) | SY | 8,821 | $17.00 | $29.16 |
| 48 | Temporary ramp (40600990) | SY | 1,888 | $28.00 | $9.45 |
| 49 | HMA BC IL-9.5 N50 (40602978) | TON | 12,348 | $120.00 | $127.55 |
| 50 | P HMA SC IL-9.5 D N50 (40604160) | TON | 13,650 | $132.00 | $139.94 |
| 51 | Incidental HMA surf (40800050) | TON | 1,214 | $205.00 | $354.00 |
| 52 | PCC driveway pavt 6 (42300200) | SY | 91 | $98.00 | $149.00 |
| 53 | PCC driveway pavt 7 (42300300) | SY | 526 | $100.00 | $125.00 |
| 54 | PC conc sidewalk 4 (42400100) | SF | 5,520 | $24.00 | $14.00 |
| 55 | Detectable warnings (42400800) | SF | 204 | $30.00 | $42.00 |
| 56 | Pavement rem (44000100) | SY | 146 | $20.00 | $10.72 |
| 57 | HMA surf rem 1 1/2 (44000155) | SY | 4,081 | $3.60 | $1.92 |
| 58 | HMA surf rem 2 (44000157) | SY | 667 | $9.00 | $5.86 |
| 59 | HMA surf rem 3 3/4 (44000164) | SY | 23,037 | $5.75 | $4.08 |
| 60 | Drive pavement rem (44000200) | SY | 581 | $20.00 | $41.00 |
| 61 | Comb curb gutter rem (44000500) | LF | 463 | $26.00 | $22.00 |
| 62 | Sidewalk rem (44000600) | SF | 1,640 | $8.00 | $5.00 |
| 63 | CL D patch T1 6 (44201713) | SY | 12 | $270.74 | $850.20 |
| 64 | CL D patch T2 6 (44201717) | SY | 29 | $270.54 | $469.94 |
| 65 | CL D patch T2 8 (44201741) | SY | 66 | $223.28 | $537.79 |
| 66 | CL D patch T4 8 (44201747) | SY | 32 | $281.04 | $610.44 |
| 67 | CL D patch T2 11 (44201777) | SY | 53 | $241.02 | $246.50 |
| 68 | CL D patch T2 14 (44201815) | SY | 468 | $268.51 | $278.63 |
| 69 | CL D patch T3 14 (44201819) | SY | 342 | $268.45 | $278.52 |
| 70 | CL D patch T4 14 (44201821) | SY | 726 | $268.46 | $278.67 |
| 71 | Aggregate SHLDS A (48100100) | TON | 98 | $62.00 | $54.25 |
| 72 | Agg wedge SHLD type B (48102100) | TON | 1,697 | $50.00 | $53.25 |
| 73 | HMA shoulders 6 1/2 (48203023) | SY | 349 | $66.00 | $261.70 |
| 74 | HMA shoulders 8 (48203029) | SY | 400 | $72.00 | $120.44 |
| 75 | Conc rem (50102400) | CY | 7.70 | $4,963.24 | $5,700.00 |
| 76 | Pipe culvert remov (50105220) | LF | 656 | $37.00 | $41.00 |
| 77 | Conc sup-STR (50300255) | CY | 8.40 | $4,898.29 | $6,100.00 |
| 78 | Protective coat (50300300) | SY | 26 | $29.28 | $47.00 |
| 79 | Reinf bars, epoxy CTD (50800205) | LB | 1,240 | $4.28 | $6.50 |
| 80 | Bar splicers (50800515) | EACH | 16 | $204.61 | $114.00 |
| 81 | Pref JT strip seal (52000110) | LF | 105 | $261.91 | $309.00 |
| 82 | P cul CL A 1 18 (542A0223) | LF | 55 | $130.00 | $131.00 |
| 83 | P cul CL A 1 24 (542A0229) | LF | 158 | $150.00 | $184.00 |
| 84 | P cul CL A 1 eqrs 18 (542A5473) | LF | 91 | $160.00 | $166.00 |
| 85 | P cul CL D 1 12 (542D0217) | LF | 92 | $110.00 | $130.00 |
| 86 | P cul CL D 1 18 (542D0223) | LF | 414 | $120.00 | $114.00 |
| 87 | P cul CL D 1 eqrs 18 (542D5473) | LF | 171 | $150.00 | $122.00 |
| 88 | PRC flar end sec 18 (54213663) | EACH | 2 | $1,800.00 | $2,500.00 |
| 89 | PRC flar end sec 24 (54213669) | EACH | 1 | $2,000.00 | $2,700.00 |
| 90 | PRC FL end S EQ RS 18 (54214503) | EACH | 2 | $2,000.00 | $2,600.00 |
| 91 | Metal FL end sec 12" (54262712) | EACH | 6 | $1,000.00 | $1,600.00 |
| 92 | Metal FL end sec 18" (54262718) | EACH | 20 | $1,125.00 | $1,700.00 |
| 93 | Metal FL ES EQ RS 18" (54262818) | EACH | 6 | $1,200.00 | $1,900.00 |
| 94 | Insert cul lin 72 (54390330) | LF | 20 | $2,000.00 | $3,200.00 |
| 95 | Man TA 5 dia T1F CL (60221100) | EACH | 1 | $8,000.00 | $11,000 |
| 96 | Inlets TA T8G (60236200) | EACH | 2 | $2,900.00 | $3,000.00 |
| 97 | Man reconst (60257900) | EACH | 1 | $3,700.00 | $8,000.00 |
| 98 | Inlets reconst (60262700) | EACH | 1 | $3,400.00 | $1,900.00 |
| 99 | Remov inlets (60500060) | EACH | 1 | $350.00 | $1,600.00 |
| 100 | Fill inlets (60500305) | EACH | 3 | $1,000.00 | $1,900.00 |
| 101 | Comb CC&G TB6.12 (60603800) | LF | 66 | $88.00 | $131.00 |
| 102 | Comb CC&G TB6.18 (60604400) | LF | 115 | $95.00 | $120.00 |
| 103 | Comb CC&G TY B-6.24 (60605000) | LF | 38 | $110.00 | $150.00 |
| 104 | Comb CC&G TM2.12 (60608300) | LF | 201 | $90.00 | $120.00 |
| 105 | Pipe culv cleaned 12 (60920012) | LF | 262 | $64.15 | $30.00 |
| 106 | Pipe culv cleaned 15 (60920015) | LF | 296 | $18.00 | $18.00 |
| 107 | Pipe culv cleaned 18 (60920018) | LF | 117 | $22.00 | $22.00 |
| 108 | SPBGR TY A 6FT posts (63000001) | LF | 5,288 | $35.95 | $34.65 |
| 109 | SPBGR TY A 9FT posts (63000003) | LF | 188 | $43.50 | $44.15 |
| 110 | LSG OV cul 12'6" span (63000350) | LF | 37.50 | $39.00 | $45.95 |
| 111 | Traf bar term T2 (63100045) | EACH | 1 | $3,200.00 | $2,145.00 |
| 112 | TR bar TRM T1 SPL tan (63100167) | EACH | 25 | $3,900.00 | $3,865.00 |
| 113 | Guardrail remov (63200310) | LF | 4,622 | $10.00 | $9.05 |
| 114 | Shoulder rum strip 8 (64200108) | LF | 83,709 | $0.26 | $0.38 |
| 115 | Sinusoidal rum STP 14 (64200214) | LF | 40,821 | $0.32 | $0.44 |
| 116 | Engr field office A (67000400) | CAL MO | 14 | $2,500.00 | $4,155.97 |
| 117 | Mobilization (67100100) | LS | 1 | $509,900 | $50,001 |
| 118 | Traf cont-prot 701321 (70100405) | EACH | 1 | $32,000 | $32,000 |
| 119 | Traf cont-prot 701201 (70100450) | LS | 1 | $61,000 | $90,529 |
| 120 | Traf cont-prot 701306 (70100460) | LS | 1 | $100.00 | $27,000 |
| 121 | Traf cont-prot 701326 (70100500) | LS | 1 | $100.00 | $0.01 |
| 122 | Traf cont-prot 701336 (70100600) | LS | 1 | $15,100 | $15,000 |
| 123 | TR cont & prot 701501 (70102620) | LS | 1 | $15,100 | $15,000 |
| 124 | TR cont & prot 701701 (70102635) | LS | 1 | $100.00 | $0.01 |
| 125 | TR cont & prot 701801 (70102640) | LS | 1 | $650.00 | $2,285.01 |
| 126 | TR cont surveillance (70103815) | CAL DAY | 5 | $350.00 | $1,500.00 |
| 127 | Temp BR traf signals (70106500) | EACH | 1 | $40,500 | $15,000 |
| 128 | Temp rumble strips (70106700) | EACH | 1 | $1,750.00 | $1,750.00 |
| 129 | Changeable message SN (70107025) | CAL DAY | 56 | $150.00 | $150.00 |
| 130 | Short term pavt mking (70300100) | LF | 18,638 | $1.46 | $2.27 |
| 131 | SHRT TRM pavt MK rem (70300150) | SF | 1,920 | $2.19 | $5.51 |
| 132 | Temp PVT MK LTR & sym paint (70300211) | SF | 338 | $4.00 | $4.00 |
| 133 | Temp PVT MK line 4 - paint (70300221) | LF | 65,471 | $0.25 | $0.25 |
| 134 | Temp PVT MK line 6 - paint (70300241) | LF | 91,663 | $0.35 | $0.35 |
| 135 | Temp PVT MK line 8 - paint (70300251) | LF | 583 | $0.45 | $0.45 |
| 136 | Temp PVT MK line 12 - paint (70300261) | LF | 451 | $2.00 | $2.00 |
| 137 | Temp PVT MK line 24 - paint (70300281) | LF | 524 | $4.00 | $4.00 |
| 138 | Temp conc barrier (70400100) | LF | 850 | $25.67 | $43.25 |
| 139 | Rel temp conc barrier (70400200) | LF | 850 | $8.78 | $10.00 |
| 140 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $6,750.00 | $11,950 |
| 141 | Imp attn rel NRN TL3 (70600352) | EACH | 2 | $1,099.97 | $3,299.91 |
| 142 | Terminal marker - DA (72501000) | EACH | 25 | $50.00 | $50.00 |
| 143 | Mod ureth PM LTR-sym (78009000) | SF | 338 | $4.00 | $4.00 |
| 144 | Mod ureth PM line 4 (78009004) | LF | 65,471 | $0.55 | $0.55 |
| 145 | Mod ureth PM line 6 (78009006) | LF | 91,663 | $0.85 | $0.85 |
| 146 | Mod ureth PM line 8 (78009008) | LF | 583 | $1.25 | $1.25 |
| 147 | Mod ureth PM line 12 (78009012) | LF | 451 | $1.95 | $1.95 |
| 148 | Mod ureth PM line 24 (78009024) | LF | 524 | $4.00 | $4.00 |
| 149 | GRV RCSD PM LTR & sym (78011000) | SF | 409 | $6.00 | $6.00 |
| 150 | GRV RCSD PVT MRKG 5 (78011025) | LF | 65,471 | $0.45 | $0.45 |
| 151 | GRV RCSD PVT MRKG 7 (78011035) | LF | 91,663 | $0.65 | $0.65 |
| 152 | GRV RCSD PVT MRKG 9 (78011045) | LF | 583 | $1.00 | $1.00 |
| 153 | GRV RCSD PVT MRKG 13 (78011065) | LF | 451 | $3.25 | $3.25 |
| 154 | GRV RCSD PVT MRKG 25 (78011125) | LF | 524 | $6.00 | $6.00 |
| 155 | Raised refl pavt MKR (78100100) | EACH | 701 | $50.00 | $40.98 |
| 156 | Raised ref PVT MK rem (78300200) | EACH | 701 | $22.66 | $34.15 |
| 157 | Rem EX FB instal comp (89502400) | EACH | 2 | $1,655.41 | $1,655.41 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.