IDOT contract 68C93 bid tabulation
Section 72[6RS;(6-1)RS-1]. Let by Illinois DOT on June 12, 2026, Peoria, District 04. 2 bids received; low bid $10,996,119 by Advanced Asphalt Company.
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 62
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Advanced Asphalt Company | $10,996,119 | Low |
| 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $11,150,809 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Asphalt Company | 2. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $15,000 | $6,388.85 |
| 2 | Recoverable delineatr (X2600002) | EACH | 233 | $65.00 | $155.00 |
| 3 | HMA surf rem SPL (X4400196) | SY | 7,411 | $16.50 | $33.99 |
| 4 | CL A patch T4 10 SPL (X4420559) | SY | 1,026.50 | $255.00 | $255.00 |
| 5 | Linear delin panels 4 (X6350204) | EACH | 156 | $40.00 | $40.00 |
| 6 | Conc bar wall R&R L1 (X6370101) | LS | 1 | $17,250 | $14,718 |
| 7 | Traf cont & prot SPL (X7010216) | LS | 1 | $77,000 | $104,869 |
| 8 | GDRL agg eros cont (Z0001002) | TON | 2,418 | $115.00 | $110.34 |
| 9 | Drainage STR removed (Z0018700) | EACH | 14 | $2,300.00 | $1,914.62 |
| 10 | Erosion cont curb rem (Z0020805) | LF | 7,168.70 | $10.00 | $5.01 |
| 11 | Trainees (Z0076600) | HR | 5,000 | $0.80 | $0.80 |
| 12 | Trainees TPG (Z0076604) | HR | 5,000 | $15.00 | $15.00 |
| 13 | Earth exc wid (20200500) | CY | 55.40 | $125.00 | $104.74 |
| 14 | Mowing (25000750) | ACRE | 40 | $120.00 | $120.00 |
| 15 | Sub gran mat A (31100100) | TON | 95.20 | $87.50 | $110.38 |
| 16 | HMA base cse 4 1/4 (35501301) | SY | 54,954 | $29.50 | $28.61 |
| 17 | HMA base cse 10 (35501324) | SY | 952.10 | $70.00 | $104.90 |
| 18 | P bit matls tack CT (40600295) | LB | 208,905 | $0.90 | $1.08 |
| 19 | Matl transfer device (40600405) | TON | 31,292 | $4.65 | $3.07 |
| 20 | HMA surf rem butt JT (40600982) | SY | 1,158.10 | $33.50 | $15.37 |
| 21 | PCC surf rem butt JT (40600985) | SY | 875 | $41.50 | $22.37 |
| 22 | Temporary ramp (40600990) | SY | 1,344.40 | $15.00 | $5.85 |
| 23 | P HMA BC IL-9.5 N70 (40603208) | TON | 8,927 | $130.00 | $138.35 |
| 24 | HMA SC IL-9.5FG D N50 (40604010) | TON | 6,594 | $120.00 | $160.22 |
| 25 | P SC SMA 12.5 E N80 (40605034) | TON | 10,202 | $155.00 | $183.33 |
| 26 | Incidental HMA surf (40800050) | TON | 142.40 | $250.00 | $285.00 |
| 27 | HMA surf rem 3/4 (44000152) | SY | 1,577 | $5.00 | $8.48 |
| 28 | HMA surf rem 3 3/4 (44000164) | SY | 3,518.30 | $6.10 | $7.88 |
| 29 | HMA surf rem 4 1/4 (44000166) | SY | 52,685 | $7.45 | $5.83 |
| 30 | Paved SHLD removal (44004250) | SY | 785.50 | $22.00 | $21.62 |
| 31 | CL A patch T2 10 (44200553) | SY | 88 | $300.00 | $300.00 |
| 32 | CL A patch T3 10 (44200557) | SY | 80 | $300.00 | $300.00 |
| 33 | CL A patch T4 10 (44200559) | SY | 3,096.90 | $250.00 | $250.00 |
| 34 | CL A patch T4 12 (44200583) | SY | 186.67 | $260.00 | $260.00 |
| 35 | Patch reinforcement (44213000) | SY | 4,478.10 | $95.00 | $95.00 |
| 36 | Saw cuts (44213200) | LF | 5,735.60 | $2.00 | $2.00 |
| 37 | Tie bars 3/4 (44213204) | EACH | 1,638 | $5.00 | $5.00 |
| 38 | Aggregate SHLDS B (48101200) | TON | 1,706 | $37.75 | $66.44 |
| 39 | HMA shoulders (48203100) | TON | 5,769 | $120.00 | $141.17 |
| 40 | Conc struct (50300225) | CY | 14 | $1,196.85 | $1,875.00 |
| 41 | Reinf bars, epoxy CTD (50800205) | LB | 1,110 | $4.72 | $6.50 |
| 42 | SPBGR TY A 6FT posts (63000001) | LF | 11,925 | $33.00 | $33.00 |
| 43 | SPGR att to culvert (63000030) | LF | 68.75 | $275.00 | $275.00 |
| 44 | Traf bar term T2 (63100045) | EACH | 13 | $2,200.00 | $2,200.00 |
| 45 | Traf bar term T6 (63100085) | EACH | 2 | $4,425.00 | $4,425.00 |
| 46 | TR bar TRM T1 SPL tan (63100167) | EACH | 13 | $3,700.00 | $3,700.00 |
| 47 | Guardrail remov (63200310) | LF | 12,360 | $6.25 | $6.25 |
| 48 | Shoulder rum strip 8 (64200108) | LF | 51,331 | $0.35 | $0.25 |
| 49 | Imp atten FRD nar TL3 (64300260) | EACH | 1 | $23,975 | $23,975 |
| 50 | Mobilization (67100100) | LS | 1 | $625,000 | $32,350 |
| 51 | Changeable message SN (70107025) | CAL DAY | 720 | $25.00 | $75.00 |
| 52 | Short term pavt mking (70300100) | LF | 5,415 | $2.00 | $2.37 |
| 53 | SHRT TRM pavt MK rem (70300150) | SF | 1,805 | $2.50 | $9.18 |
| 54 | Temp PVT MK line 6 - paint (70300241) | LF | 73,845 | $0.01 | $0.25 |
| 55 | Temp PVT MK line 8 - paint (70300251) | LF | 549.24 | $0.01 | $0.35 |
| 56 | Terminal marker - DA (72501000) | EACH | 28 | $42.00 | $42.00 |
| 57 | Pref PL PM TD STD L 6 (78004630) | LF | 73,845 | $5.80 | $4.55 |
| 58 | Pref PL PM TD STD L 8 (78004640) | LF | 549.24 | $12.50 | $19.00 |
| 59 | GRV RCSD PVT MRKG 7 (78011035) | LF | 73,845 | $0.60 | $0.45 |
| 60 | GRV RCSD PVT MRKG 9 (78011045) | LF | 549.24 | $1.00 | $0.65 |
| 61 | Raised refl pavt MKR (78100100) | EACH | 323 | $53.00 | $47.00 |
| 62 | Raised ref PVT MK rem (78300200) | EACH | 323 | $14.00 | $31.53 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.