IDOT contract 66N78 bid tabulation
Section (J-1,D-1,24,22)RS-2. Let by Illinois DOT on January 16, 2026, Bureau, District 03. 1 bid received; low bid $4,503,804 by Advanced Asphalt Company.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 87
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Advanced Asphalt Company | $4,503,804 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Asphalt Company |
|---|---|---|---|---|
| 1 | Furnished excav SPL (X2040805) | CY | 5 | $500.00 |
| 2 | HMA surf rem var DP (X4401198) | SY | 3,472 | $12.50 |
| 3 | Box culvert removal (X5400005) | LF | 122 | $66.50 |
| 4 | Remov EX flar end sec (X5427602) | EACH | 4 | $380.00 |
| 5 | Fill exist culverts (X6050208) | CY | 23 | $670.00 |
| 6 | Rail element plates (X6300215) | EACH | 49 | $215.32 |
| 7 | Linear delin panels 4 (X6350204) | EACH | 274 | $41.45 |
| 8 | Linear delin panels 6 (X6350206) | EACH | 30 | $81.16 |
| 9 | Furn perm surv MKRS (X6670106) | EACH | 15 | $275.00 |
| 10 | Temp info signing (X7200061) | SF | 168 | $25.53 |
| 11 | Debris removal (Z0015500) | LS | 1 | $18,445 |
| 12 | RR prot liability ins (Z0048665) | LS | 1 | $11,225 |
| 13 | Earth excavation (20200100) | CY | 524 | $28.00 |
| 14 | Trench backfill (20800150) | CY | 218 | $39.00 |
| 15 | Grading & shap ditch (21400100) | LF | 1,820 | $12.50 |
| 16 | Seeding CL 2A (25000210) | ACRE | 0.24 | $19,753 |
| 17 | Nitrogen fert nutr (25000400) | LB | 23.30 | $12.00 |
| 18 | Phosphorus fert nutr (25000500) | LB | 23.30 | $12.00 |
| 19 | Potassium fert nutr (25000600) | LB | 23.30 | $12.00 |
| 20 | Erosion contr blanket (25100630) | SY | 1,214 | $10.00 |
| 21 | Stone riprap CL A4 (28100107) | SY | 43 | $245.00 |
| 22 | Filter fabric (28200200) | SY | 43 | $10.00 |
| 23 | Sub gran mat B (31101000) | TON | 31 | $46.00 |
| 24 | Agg surf course TY B (40200800) | TON | 98 | $92.00 |
| 25 | Bit matls tack CT (40600290) | LB | 77,742 | $0.88 |
| 26 | Long joint sealant (40600370) | LF | 29,725 | $2.60 |
| 27 | Mix CR JTS flangewys (40600400) | TON | 34 | $350.00 |
| 28 | Matl transfer device (40600405) | TON | 20,428 | $3.95 |
| 29 | HMA BC HM N50 (40600900) | TON | 8 | $350.00 |
| 30 | HMA BC HM N70 (40600901) | TON | 49 | $300.00 |
| 31 | Temporary ramp (40600990) | SY | 764 | $16.00 |
| 32 | HMA BC IL-19.0 N50 (40603080) | TON | 1,953 | $96.00 |
| 33 | HMA BC IL-19.0 N70 (40603085) | TON | 12,257 | $95.00 |
| 34 | HMA SC IL-9.5 C N50 (40604050) | TON | 1,302 | $113.50 |
| 35 | HMA SC IL-9.5 C N70 (40604052) | TON | 8,171 | $104.25 |
| 36 | Incidental HMA surf (40800050) | TON | 517 | $175.00 |
| 37 | HMA surf rem 3 1/2 (44000163) | SY | 15,500 | $4.60 |
| 38 | HMA surf rem 3 3/4 (44000164) | SY | 97,275 | $5.46 |
| 39 | CL D patch T2 4 (44201692) | SY | 48 | $170.00 |
| 40 | CL D patch T2 14 (44201815) | SY | 14 | $390.00 |
| 41 | CL D patch T3 14 (44201819) | SY | 18 | $380.00 |
| 42 | CL D patch T4 14 (44201821) | SY | 52 | $255.00 |
| 43 | Agg wedge SHLD type B (48102100) | TON | 2,262 | $34.50 |
| 44 | Pipe culvert remov (50105220) | LF | 233 | $95.00 |
| 45 | P cul CL A 1 36 (542A0241) | LF | 100 | $350.00 |
| 46 | P cul CL A 1 eqrs 18 (542A5473) | LF | 68 | $260.00 |
| 47 | P cul CL A 1 eqrs 24 (542A5479) | LF | 26 | $329.00 |
| 48 | P cul CL A 1 eqrs 30 (542A5485) | LF | 40 | $460.00 |
| 49 | P cul CL D 1 12 (542D0217) | LF | 123 | $180.00 |
| 50 | End sections 12 (54213447) | EACH | 2 | $1,975.00 |
| 51 | PRC flar end sec 36 (54213681) | EACH | 2 | $2,600.00 |
| 52 | PRC FL end S EQ RS 18 (54214503) | EACH | 4 | $1,625.00 |
| 53 | TRVRS pipe GRT con ES (54260315) | LF | 16.30 | $120.00 |
| 54 | Conc ES 542011 30 1:2 (54263230) | EACH | 2 | $7,450.00 |
| 55 | Conc ES 542011 24 1:3 (54263324) | EACH | 2 | $5,065.00 |
| 56 | Fill inlets (60500305) | EACH | 4 | $1,000.00 |
| 57 | Box cul to BE cleaned (60905305) | LF | 319 | $205.00 |
| 58 | Pipe culv cleaned 12 (60920012) | LF | 160 | $36.00 |
| 59 | Pipe culv cleaned 24 (60920024) | LF | 50 | $115.00 |
| 60 | Pipe culv cleaned 30 (60920030) | LF | 220 | $52.00 |
| 61 | Pipe culv cleaned 33 (60920033) | LF | 167 | $35.00 |
| 62 | Pipe culv cleaned 36 (60920036) | LF | 76 | $114.00 |
| 63 | Pipe culv cleaned 42 (60920042) | LF | 104 | $86.00 |
| 64 | Pipe culv cleaned 60 (60920060) | LF | 136 | $85.00 |
| 65 | Traf bar term T2 (63100045) | EACH | 1 | $1,691.00 |
| 66 | Traf bar term T6 (63100085) | EACH | 2 | $4,468.00 |
| 67 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,440.00 |
| 68 | Delineators (63500105) | EACH | 60 | $54.62 |
| 69 | Shoulder rum strip 8 (64200108) | LF | 3,606 | $1.70 |
| 70 | Engr field office A (67000400) | CAL MO | 3 | $2,300.00 |
| 71 | Mobilization (67100100) | LS | 1 | $256,700 |
| 72 | Traf cont-prot 701201 (70100450) | LS | 1 | $2,601.17 |
| 73 | Traf cont-prot 701306 (70100460) | LS | 1 | $22,308 |
| 74 | Short term pavt mking (70300100) | LF | 29,556 | $1.15 |
| 75 | SHRT TRM pavt MK rem (70300150) | SF | 10,956 | $2.75 |
| 76 | Pref PL PM TD STD LTR/sym (78004600) | SF | 368 | $30.77 |
| 77 | Pref PL PM TD STD L 8 (78004640) | LF | 1,766 | $6.93 |
| 78 | Pref PL PM TD STD L12 (78004660) | LF | 1,538 | $9.55 |
| 79 | Pref PL PM TD STD L24 (78004720) | LF | 208 | $23.78 |
| 80 | Mod ureth PM line 4 (78009004) | LF | 123,314 | $0.78 |
| 81 | Mod ureth PM line 6 (78009006) | LF | 9,278 | $1.15 |
| 82 | GRV RCSD PM LTR & sym (78011000) | SF | 368 | $6.00 |
| 83 | GRV RCSD PVT MRKG 9 (78011045) | LF | 1,766 | $2.13 |
| 84 | GRV RCSD PVT MRKG 25 (78011125) | LF | 208 | $9.00 |
| 85 | Raised refl pavt MKR (78100100) | EACH | 417 | $37.00 |
| 86 | Curb reflectors (78200020) | EACH | 104 | $12.00 |
| 87 | Raised ref PVT MK rem (78300200) | EACH | 417 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.