Valley Construction Co. submitted 65 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 18 of them (28%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $74,169,466
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 14 | 3 | 21% |
| 2022 | 6 | 1 | 17% |
| 2023 | 6 | 2 | 33% |
| 2024 | 12 | 4 | 33% |
| 2025 | 17 | 2 | 12% |
| 2026 | 10 | 6 | 60% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 02 | 57 | 15 | 26% |
| District 04 | 8 | 3 | 38% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Changeable message SN | 70107025 | CAL DAY | 25 | 22 (88%) | $50.00 | $55.00 |
| Bit matls tack CT | 40600290 | LB | 30 | 19 (63%) | $0.30 | $0.01 |
| Sign panel T1 | 72000100 | SF | 28 | 19 (68%) | $30.00 | $31.00 |
| Trainees TPG | Z0076604 | HR | 17 | 17 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 16 | 16 (100%) | $0.80 | $0.80 |
| SHRT TRM pavt MK rem | 70300150 | SF | 26 | 14 (54%) | $2.00 | $1.20 |
| Short term pavt mking | 70300100 | LF | 26 | 14 (54%) | $1.00 | $1.01 |
| GRV RCSD PVT MRKG 5 | 78011025 | LF | 22 | 14 (64%) | $0.41 | $0.65 |
| Long joint sealant | 40600370 | LF | 19 | 14 (74%) | $2.56 | $3.30 |
| Mod ureth PM line 4 | 78009004 | LF | 22 | 13 (59%) | $0.75 | $1.69 |
| Detectable warnings | 42400800 | SF | 26 | 12 (46%) | $42.00 | $37.00 |
| Teles STL sin support | 72800100 | LF | 21 | 12 (57%) | $22.00 | $19.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Brandt Construction Co. | 43 | 18 of 43 |
| Langman Construction, Inc. | 25 | 10 of 25 |
| McCarthy Improvement Company | 19 | 9 of 19 |
| Advanced Asphalt Company | 18 | 15 of 18 |
| Phoenix Corporation of the Quad Cities | 13 | 5 of 13 |
| Fischer Excavating, Inc. | 9 | 3 of 9 |
| Centennial Contractors of the Quad Cities, Inc. | 9 | 6 of 9 |
| Civil Constructors, Inc. d/b/a/ Helm Civil | 8 | 5 of 8 |
| Miller Trucking & Excavating Company | 7 | 4 of 7 |
| Gensini Excavating, Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 64V41 | District 02 | Section ((33,40-1)&(115))PP | 1 of 2 | $755,266 | Low, 5.0% under the second |
| 31 JUL 2026 | 85781 | District 02 | East Moline, section 22-00159-04-PV | 2 of 4 | $6,525,687 | +2.0% |
| 12 JUN 2026 | 64L94 | District 02 | Section 104R | 1 of 4 | $14,149,820 | Low, 3.0% under the second |
| 12 JUN 2026 | 64V40 | District 02 | Section ((81-2)R | 1 of 1 | $8,996,139 | Low |
| 24 APR 2026 | 68K33 | District 04 | Section 121RS-2 | 1 of 2 | $1,862,714 | Low, 14% under the second |
| 16 JAN 2026 | 64L71 | District 02 | Section 136CR | 2 of 6 | $923,645 | +14% |
| 16 JAN 2026 | 64U16 | District 02 | Section ((3,10 | 2 of 3 | $6,545,490 | +9.0% |
| 16 JAN 2026 | 64U18 | District 02 | Section (115,115EXT,128,135EXT)CIR&RS | 2 of 2 | $6,386,768 | +9.0% |
| 16 JAN 2026 | 85763 | District 02 | Moline, section 19-00274-00-BT | 1 of 7 | $975,442 | Low, 7.0% under the second |
| 16 JAN 2026 | 89823 | District 04 | Project Number: 3J5S-767 / /, section 20-00118-00-BR | 1 of 4 | $590,438 | Low, 18% under the second |
| 07 NOV 2025 | 64U80 | District 02 | 4 of 4 | $699,499 | +104% | |
| 07 NOV 2025 | 64U82 | District 02 | 4 of 4 | $1,019,319 | +92% | |
| 07 NOV 2025 | 85785 | District 02 | Moline, section 23-00291-00-BT | 6 of 6 | $5,998,617 | +18% |
| 19 SEP 2025 | 64P76 | District 02 | Section (102W,103)RS | 3 of 4 | $2,727,537 | +17% |
| 19 SEP 2025 | 85782 | District 02 | Moline, section 22-00288-00-SW | 2 of 6 | $460,337 | +3.0% |
| 13 JUN 2025 | 64R16 | District 02 | Section (81-2,2HB-1,2-1,3)RS | 2 of 3 | $12,596,548 | +9.0% |
| 25 APR 2025 | 64N76 | District 02 | Section (2,3)R | 2 of 4 | $2,943,583 | +9.0% |
| 25 APR 2025 | 64U32 | District 02 | Section (6,7)PP-RS | 2 of 2 | $1,850,793 | +28% |
| 25 APR 2025 | 85774 | District 02 | East Moline, section 22-00159-00-PV, | 1 of 4 | $12,185,222 | Low, 6.0% under the second |
| 25 APR 2025 | 85777 | District 02 | Project Number: 28Xt-733 / /, section 22-00260-00-RS | 2 of 3 | $1,742,703 | +21% |
| 25 APR 2025 | 89868 | District 04 | Aledo, section 23-00049-00-BT | 6 of 8 | $1,201,390 | +31% |
| 07 MAR 2025 | 64T82 | District 02 | Section (33&40)1RS | 2 of 4 | $267,541 | 0.0% |
| 07 MAR 2025 | 64U29 | District 02 | Section 138PP&RS | 2 of 2 | $3,287,624 | +10% |
| 07 MAR 2025 | 85765 | District 02 | Silvis, section 20-00052-00-BT | 5 of 8 | $1,428,453 | +24% |
| 17 JAN 2025 | 64N06 | District 02 | Section (18Z)RS-6 | 2 of 3 | $1,079,803 | +7.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.