Valley Construction Co.: IDOT bid record

Valley Construction Co. submitted 65 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 18 of them (28%). When it was not low, its total sat a median +17% above the low bid.

Owner
Illinois DOT
Low bid volume
$74,169,466
Latest bid
31 JUL 2026
Data through
18 SEP 2026
65Bids
18Low bids
28Win rate, percent
+17%Median gap to the low bid when not low, 47 bids

By year

YearBidsLow bidsWin rate
202114321%
20226117%
20236233%
202412433%
202517212%
202610660%
Valley Construction Co., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 02571526%
District 048338%
Valley Construction Co., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Changeable message SN70107025CAL DAY2522 (88%)$50.00$55.00
Bit matls tack CT40600290LB3019 (63%)$0.30$0.01
Sign panel T172000100SF2819 (68%)$30.00$31.00
Trainees TPGZ0076604HR1717 (100%)$15.00$15.00
TraineesZ0076600HR1616 (100%)$0.80$0.80
SHRT TRM pavt MK rem70300150SF2614 (54%)$2.00$1.20
Short term pavt mking70300100LF2614 (54%)$1.00$1.01
GRV RCSD PVT MRKG 578011025LF2214 (64%)$0.41$0.65
Long joint sealant40600370LF1914 (74%)$2.56$3.30
Mod ureth PM line 478009004LF2213 (59%)$0.75$1.69
Detectable warnings42400800SF2612 (46%)$42.00$37.00
Teles STL sin support72800100LF2112 (57%)$22.00$19.50
Valley Construction Co., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202664V41District 02Section ((33,40-1)&(115))PP1 of 2$755,266Low, 5.0% under the second
31 JUL 202685781District 02East Moline, section 22-00159-04-PV2 of 4$6,525,687+2.0%
12 JUN 202664L94District 02Section 104R1 of 4$14,149,820Low, 3.0% under the second
12 JUN 202664V40District 02Section ((81-2)R1 of 1$8,996,139Low
24 APR 202668K33District 04Section 121RS-21 of 2$1,862,714Low, 14% under the second
16 JAN 202664L71District 02Section 136CR2 of 6$923,645+14%
16 JAN 202664U16District 02Section ((3,102 of 3$6,545,490+9.0%
16 JAN 202664U18District 02Section (115,115EXT,128,135EXT)CIR&RS2 of 2$6,386,768+9.0%
16 JAN 202685763District 02Moline, section 19-00274-00-BT1 of 7$975,442Low, 7.0% under the second
16 JAN 202689823District 04Project Number: 3J5S-767 / /, section 20-00118-00-BR1 of 4$590,438Low, 18% under the second
07 NOV 202564U80District 024 of 4$699,499+104%
07 NOV 202564U82District 024 of 4$1,019,319+92%
07 NOV 202585785District 02Moline, section 23-00291-00-BT6 of 6$5,998,617+18%
19 SEP 202564P76District 02Section (102W,103)RS3 of 4$2,727,537+17%
19 SEP 202585782District 02Moline, section 22-00288-00-SW2 of 6$460,337+3.0%
13 JUN 202564R16District 02Section (81-2,2HB-1,2-1,3)RS2 of 3$12,596,548+9.0%
25 APR 202564N76District 02Section (2,3)R2 of 4$2,943,583+9.0%
25 APR 202564U32District 02Section (6,7)PP-RS2 of 2$1,850,793+28%
25 APR 202585774District 02East Moline, section 22-00159-00-PV,1 of 4$12,185,222Low, 6.0% under the second
25 APR 202585777District 02Project Number: 28Xt-733 / /, section 22-00260-00-RS2 of 3$1,742,703+21%
25 APR 202589868District 04Aledo, section 23-00049-00-BT6 of 8$1,201,390+31%
07 MAR 202564T82District 02Section (33&40)1RS2 of 4$267,5410.0%
07 MAR 202564U29District 02Section 138PP&RS2 of 2$3,287,624+10%
07 MAR 202585765District 02Silvis, section 20-00052-00-BT5 of 8$1,428,453+24%
17 JAN 202564N06District 02Section (18Z)RS-62 of 3$1,079,803+7.0%
Valley Construction Co.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way