IDOT contract 64R16 bid tabulation
Section (81-2,2HB-1,2-1,3)RS. Let by Illinois DOT on June 13, 2025, Rock Island, District 02. 3 bids received; low bid $11,584,709 by Advanced Asphalt Company.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 71
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Advanced Asphalt Company | $11,584,709 | Low |
| 2 | Valley Construction Co. | $12,596,548 | +9.0% |
| 3 | Langman Construction, Inc. | $14,605,756 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Advanced Asphalt Company | 2. Valley Construction Co. | 3. Langman Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | HMA surf rem-long JT (X4401196) | SY | 7,267 | $12.42 | $12.00 | $18.00 |
| 2 | Vert adj of guardrail (X6330900) | LF | 1,725 | $19.00 | $19.00 | $35.00 |
| 3 | Rem/rep SPBGR RL elem (X6331007) | LF | 325 | $34.00 | $34.00 | $40.00 |
| 4 | Delineators SPL (X6350110) | EACH | 24 | $85.00 | $85.00 | $140.00 |
| 5 | Delineator removal (X6350120) | EACH | 100 | $25.00 | $25.00 | $85.00 |
| 6 | Median closure (X7010112) | EACH | 1 | $9,384.00 | $9,384.00 | $9,384.00 |
| 7 | Grdrail refl TY C SPL (X7820007) | EACH | 123 | $55.00 | $55.00 | $75.00 |
| 8 | Barrier wall refl SPL (X7820008) | EACH | 20 | $25.00 | $25.00 | $85.00 |
| 9 | HMA removal SPL (Z0004542) | SY | 62 | $85.00 | $20.00 | $50.00 |
| 10 | Construction layout (Z0013798) | LS | 1 | $8,500.00 | $8,500.00 | $10,000 |
| 11 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 12 | P bit matls tack CT (40600295) | LB | 247,176 | $0.50 | $0.50 | $0.01 |
| 13 | Long joint sealant (40600370) | LF | 128,662 | $2.75 | $2.61 | $4.00 |
| 14 | Matl transfer device (40600405) | TON | 44,318 | $2.40 | $3.00 | $3.50 |
| 15 | Temporary ramp (40600990) | SY | 989 | $20.00 | $28.00 | $30.00 |
| 16 | P HMA BC IL-9.5FG N70 (40603218) | TON | 1,630 | $115.00 | $125.00 | $125.00 |
| 17 | P HMA BC IL-9.5FG N90 (40603219) | TON | 3,327 | $105.00 | $114.00 | $125.00 |
| 18 | HMA SC IL-9.5 C N70 (40604052) | TON | 15,818 | $83.00 | $100.00 | $110.00 |
| 19 | P HMA SC IL-9.5 D N70 (40604162) | TON | 1,469 | $115.00 | $120.00 | $125.00 |
| 20 | P HMA BC SMA 12.5 N80 (40605015) | TON | 16,058 | $150.00 | $155.00 | $162.00 |
| 21 | P SC SMA 12.5 E N80 (40605034) | TON | 22,244 | $150.00 | $145.00 | $167.00 |
| 22 | HMA surf rem 2 1/2 (44000159) | SY | 41,464 | $1.75 | $5.00 | $6.00 |
| 23 | HMA surf rem 3 (44000161) | SY | 61,250 | $2.20 | $5.00 | $6.50 |
| 24 | HMA surf rem 3 1/4 (44000162) | SY | 62,125 | $3.25 | $5.25 | $6.50 |
| 25 | HMA surf rem 5 (44000169) | SY | 4,800 | $4.30 | $7.00 | $12.00 |
| 26 | HMA surf rem 5 1/2 (44000171) | SY | 105,000 | $4.35 | $5.50 | $12.00 |
| 27 | Welded wire reinf (44200050) | SY | 1,920 | $5.00 | $5.00 | $14.00 |
| 28 | CL B patch T2 10 (44200970) | SY | 384 | $295.00 | $295.00 | $245.00 |
| 29 | CL B patch T3 10 (44200974) | SY | 720 | $255.00 | $255.00 | $235.00 |
| 30 | CL B patch T4 10 (44200976) | SY | 1,200 | $255.00 | $255.00 | $220.00 |
| 31 | Dowel bars 1 1/2 (44201299) | EACH | 2,160 | $30.00 | $30.00 | $20.00 |
| 32 | Saw cuts (44213200) | LF | 8,208 | $6.95 | $6.95 | $4.00 |
| 33 | Tie bars 3/4 (44213204) | EACH | 216 | $20.00 | $20.00 | $10.00 |
| 34 | Agg wedge SHLD type B (48102100) | TON | 4,255 | $28.00 | $27.00 | $40.00 |
| 35 | Delineators (63500105) | EACH | 198 | $75.00 | $75.00 | $120.00 |
| 36 | Shoulder rum strip 16 (64200116) | LF | 124,564 | $0.25 | $0.25 | $0.50 |
| 37 | Engr field office A (67000400) | CAL MO | 10 | $2,250.00 | $1,500.00 | $3,200.00 |
| 38 | Mobilization (67100100) | LS | 1 | $550,000 | $750,000 | $750,000 |
| 39 | Traf cont-prot 701421 (70100310) | LS | 1 | $67,000 | $100.00 | $100.00 |
| 40 | Traf cont-prot 701422 (70100320) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 41 | Traf cont-prot 701411 (70100420) | EACH | 8 | $1,000.00 | $1,000.00 | $1,000.00 |
| 42 | Traf cont-prot 701406 (70100700) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 43 | Traf cont-prot 701401 (70100800) | LS | 1 | $137,800 | $137,800 | $250,000 |
| 44 | Traf cont-prot 701456 (70100825) | LS | 1 | $100.00 | $100.00 | $100.00 |
| 45 | TR cont surveillance (70103815) | CAL DAY | 90 | $1.00 | $750.00 | $750.00 |
| 46 | Changeable message SN (70107025) | CAL DAY | 60 | $40.00 | $40.00 | $40.00 |
| 47 | Short term pavt mking (70300100) | LF | 10,943 | $1.15 | $1.00 | $1.00 |
| 48 | SHRT TRM pavt MK rem (70300150) | SF | 3,648 | $1.50 | $3.75 | $2.00 |
| 49 | Temp PVT MK line 4 - paint (70300221) | LF | 63,414 | $1.00 | $0.35 | $0.40 |
| 50 | Temp PVT MK line 6 - paint (70300241) | LF | 7,120 | $1.25 | $0.45 | $0.55 |
| 51 | Temp PVT MK line 8 - paint (70300251) | LF | 3,350 | $1.50 | $0.65 | $0.75 |
| 52 | Sign panel T1 (72000100) | SF | 172 | $35.00 | $35.00 | $35.00 |
| 53 | Sign panel T2 (72000200) | SF | 172 | $31.00 | $35.00 | $31.00 |
| 54 | Sign panel T3 (72000300) | SF | 32 | $50.00 | $50.00 | $50.00 |
| 55 | Remov sign panel T1 (72400310) | SF | 138 | $20.00 | $20.00 | $20.00 |
| 56 | Remov sign panel T2 (72400320) | SF | 200 | $20.00 | $20.00 | $20.00 |
| 57 | Remov sign panel T3 (72400330) | SF | 32 | $20.00 | $20.00 | $20.00 |
| 58 | Reloc sign panel T1 (72400710) | SF | 48 | $30.00 | $30.00 | $30.00 |
| 59 | Reloc sign panel T2 (72400720) | SF | 63 | $30.00 | $30.00 | $30.00 |
| 60 | Teles STL sin support (72800100) | LF | 25 | $30.00 | $30.00 | $30.00 |
| 61 | Wood sin support (73000100) | LF | 285 | $32.00 | $32.00 | $32.00 |
| 62 | Pref PL PM TD STD L 6 (78004630) | LF | 14,241 | $7.99 | $7.99 | $5.90 |
| 63 | Mod ureth PM line 4 (78009004) | LF | 124,564 | $0.73 | $0.73 | $0.65 |
| 64 | Mod ureth PM line 8 (78009008) | LF | 6,401 | $1.52 | $1.52 | $1.25 |
| 65 | Mod ureth PM line 12 (78009012) | LF | 2,033 | $2.27 | $2.27 | $2.00 |
| 66 | GRV RCSD PVT MRKG 5 (78011025) | LF | 124,564 | $0.32 | $0.32 | $0.50 |
| 67 | GRV RCSD PVT MRKG 7 (78011035) | LF | 14,241 | $0.49 | $0.49 | $0.75 |
| 68 | GRV RCSD PVT MRKG 9 (78011045) | LF | 6,401 | $0.65 | $0.65 | $0.75 |
| 69 | GRV RCSD PVT MRKG 13 (78011065) | LF | 2,033 | $0.97 | $0.97 | $1.50 |
| 70 | Raised refl pavt MKR (78100100) | EACH | 1,087 | $44.60 | $44.60 | $50.00 |
| 71 | Raised ref PVT MK rem (78300200) | EACH | 567 | $9.29 | $10.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way