IDOT contract 64L71 bid tabulation
Section 136CR. Let by Illinois DOT on January 16, 2026, Henry, District 02. 6 bids received; low bid $811,655 by Phoenix Corporation of the Quad Cities.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 60
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Phoenix Corporation of the Quad Cities | $811,655 | Low |
| 2 | Valley Construction Co. | $923,645 | +14% |
| 3 | Brandt Construction Co. | $1,033,246 | +27% |
| 4 | Fischer Excavating, Inc. | $1,099,098 | +35% |
| 5 | McCarthy Improvement Company | $1,118,037 | +38% |
| 6 | Miller Trucking & Excavating Company | $1,290,430 | +59% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Phoenix Corporation of the Quad Cities | 2. Valley Construction Co. | 3. Brandt Construction Co. | 4. Fischer Excavating, Inc. | 5. McCarthy Improvement Company | 6. Miller Trucking & Excavating Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Temporary end section (X0322938) | EACH | 3 | $1,650.00 | $2,500.00 | $3,800.00 | $2,100.00 | $2,000.00 | $2,940.00 |
| 2 | Connect exist culvert (X0327423) | EACH | 1 | $1,350.00 | $3,000.00 | $5,100.00 | $2,300.00 | $3,000.00 | $2,500.00 |
| 3 | Stone riprap CL A5 SP (X2810110) | SY | 147 | $197.50 | $225.00 | $260.00 | $150.00 | $180.00 | $140.00 |
| 4 | Temp pavt removal (X4400110) | SY | 708 | $15.00 | $15.00 | $30.00 | $18.00 | $25.00 | $15.00 |
| 5 | Drop box no.1 (X5420201) | EACH | 1 | $50,500 | $65,000 | $55,000 | $70,000 | $54,000 | $134,000 |
| 6 | Temporary manhole (X6028050) | EACH | 1 | $15,250 | $20,000 | $30,000 | $18,500 | $14,000 | $8,000.00 |
| 7 | Rem & rein sign panel (X7200075) | SF | 9 | $56.00 | $65.00 | $85.00 | $100.00 | $90.00 | $150.00 |
| 8 | Construction layout (Z0013798) | LS | 1 | $10,000 | $4,450.00 | $16,500 | $5,100.00 | $5,500.00 | $10,000 |
| 9 | Rock fill (Z0054500) | TON | 272 | $94.00 | $60.00 | $55.00 | $40.00 | $53.50 | $55.00 |
| 10 | Temp pavement (Z0062456) | SY | 708 | $92.00 | $75.00 | $105.00 | $135.00 | $146.00 | $137.00 |
| 11 | Tree remov 6-15 (20100110) | UNIT | 30 | $68.00 | $60.00 | $105.00 | $312.00 | $123.50 | $125.00 |
| 12 | Earth excavation (20200100) | CY | 267 | $35.00 | $40.00 | $20.00 | $80.00 | $155.00 | $100.00 |
| 13 | Channel excavation (20300100) | CY | 125 | $16.00 | $60.00 | $30.00 | $80.00 | $75.00 | $110.00 |
| 14 | Furnished excavation (20400800) | CY | 205 | $10.00 | $40.00 | $35.00 | $80.00 | $81.00 | $80.00 |
| 15 | Topsoil F & P 4 (21101615) | SY | 2,969 | $4.00 | $11.00 | $5.00 | $7.00 | $8.50 | $15.00 |
| 16 | Seeding CL 2A (25000210) | ACRE | 0.50 | $12,810 | $8,000.00 | $11,250 | $8,000.00 | $10,671 | $4,500.00 |
| 17 | Seeding CL 4 (25000310) | ACRE | 0.25 | $12,810 | $8,000.00 | $11,250 | $8,000.00 | $11,857 | $4,000.00 |
| 18 | Mowing (25000750) | ACRE | 0.50 | $4,000.00 | $4,000.00 | $9,000.00 | $4,000.00 | $1,897.00 | $5,000.00 |
| 19 | Erosion contr blanket (25100630) | SY | 2,075 | $2.50 | $1.75 | $4.50 | $1.75 | $1.60 | $3.00 |
| 20 | Turf reinf mat (25100900) | SY | 894 | $4.50 | $10.00 | $5.50 | $10.00 | $10.50 | $11.00 |
| 21 | Temp eros contr seed (28000250) | LB | 75 | $6.00 | $15.00 | $16.00 | $15.00 | $6.00 | $17.00 |
| 22 | Temp ditch checks (28000305) | LF | 440 | $14.00 | $11.00 | $12.00 | $11.00 | $4.50 | $6.00 |
| 23 | Perimeter eros bar (28000400) | LF | 277 | $5.00 | $13.00 | $15.00 | $13.00 | $6.50 | $9.00 |
| 24 | Inlet & pipe protect (28000500) | EACH | 1 | $250.00 | $200.00 | $225.00 | $200.00 | $550.00 | $500.00 |
| 25 | P bit matls tack CT (40600295) | LB | 19 | $1.00 | $3.25 | $1.00 | $10.00 | $1.50 | $2.00 |
| 26 | HMA SC IL-9.5 D N50 (40604060) | TON | 42 | $215.00 | $185.00 | $435.00 | $400.00 | $617.00 | $285.00 |
| 27 | CL D patch T4 10 (44201771) | SY | 373 | $150.00 | $135.00 | $190.00 | $270.00 | $167.00 | $135.00 |
| 28 | Aggregate SHLDS A 6 (48100500) | SY | 305 | $22.00 | $21.50 | $30.00 | $25.00 | $25.00 | $30.00 |
| 29 | Rem exist struct N1 (50100300) | EACH | 1 | $9,500.00 | $8,500.00 | $35,000 | $17,000 | $14,000 | $35,000 |
| 30 | Rem/disp uns matl-STR (50200450) | CY | 165 | $35.00 | $45.00 | $58.00 | $50.00 | $35.50 | $75.00 |
| 31 | Name plates (51500100) | EACH | 1 | $1,750.00 | $1,000.00 | $1,600.00 | $825.00 | $1,500.00 | $1,100.00 |
| 32 | Temp soil reten systm (52200020) | SF | 1,456 | $66.00 | $70.00 | $80.00 | $85.00 | $100.00 | $100.00 |
| 33 | P cul CL A 2 72 (542A1117) | LF | 61 | $512.00 | $725.00 | $865.00 | $1,000.00 | $700.00 | $1,390.00 |
| 34 | P cul CL A 1 15 temp (5421A015) | LF | 115 | $99.00 | $110.00 | $89.00 | $150.00 | $85.00 | $110.00 |
| 35 | Cip RC end sect 72 (54215472) | EACH | 1 | $86,500 | $75,000 | $90,000 | $90,000 | $90,500 | $155,000 |
| 36 | TRVRS pipe GRT con ES (54260315) | LF | 253 | $118.00 | $125.00 | $105.00 | $160.00 | $137.00 | $187.00 |
| 37 | Granular backfill STR (58600101) | CY | 540 | $90.00 | $140.00 | $100.00 | $85.00 | $69.00 | $70.00 |
| 38 | Conc HDWL for P drain (60100060) | EACH | 4 | $450.00 | $1,550.00 | $515.00 | $550.00 | $606.00 | $1,422.00 |
| 39 | Pipe underdr T 2 4 (60108204) | LF | 114 | $25.00 | $65.00 | $45.00 | $53.35 | $36.00 | $30.00 |
| 40 | Guardrail remov (63200310) | LF | 163 | $7.50 | $6.50 | $20.00 | $22.00 | $13.00 | $35.00 |
| 41 | Delineators (63500105) | EACH | 2 | $65.00 | $150.00 | $165.00 | $250.00 | $62.00 | $525.00 |
| 42 | Fur erect row markers (66600105) | EACH | 6 | $210.00 | $605.00 | $1,425.00 | $500.00 | $136.00 | $750.00 |
| 43 | Perm surv MKRS T2 (66700305) | EACH | 1 | $1,000.00 | $3,500.00 | $1,430.00 | $3,500.00 | $4,150.00 | $2,400.00 |
| 44 | Engr field office A (67000400) | CAL MO | 4 | $2,500.00 | $2,000.00 | $4,200.00 | $2,300.00 | $6,600.00 | $1,500.00 |
| 45 | Mobilization (67100100) | LS | 1 | $53,000 | $55,000 | $60,000 | $65,000 | $94,264 | $100,000 |
| 46 | Traf cont-prot 701321 (70100405) | EACH | 1 | $11,460 | $11,460 | $13,000 | $11,460 | $13,600 | $13,225 |
| 47 | Traf cont-prot 701201 (70100450) | LS | 1 | $100.00 | $100.00 | $112.00 | $100.00 | $119.00 | $115.00 |
| 48 | Traf cont-prot 701326 (70100500) | LS | 1 | $100.00 | $100.00 | $112.00 | $100.00 | $119.00 | $115.00 |
| 49 | TR cont surveillance (70103815) | CAL DAY | 10 | $400.00 | $750.00 | $600.00 | $1,800.00 | $2,150.00 | $390.00 |
| 50 | Temp BR traf signals (70106500) | EACH | 1 | $10,000 | $10,000 | $11,500 | $10,000 | $12,000 | $11,540 |
| 51 | Temp rumble strips (70106700) | EACH | 6 | $1,500.00 | $1,500.00 | $1,685.00 | $1,500.00 | $1,800.00 | $1,730.00 |
| 52 | SHRT TRM pavt MK rem (70300150) | SF | 784 | $1.20 | $1.85 | $1.35 | $1.20 | $1.50 | $1.25 |
| 53 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,352 | $1.50 | $1.50 | $1.70 | $1.50 | $1.80 | $1.70 |
| 54 | Temp conc barrier (70400100) | LF | 468 | $29.50 | $65.00 | $42.00 | $50.00 | $70.00 | $75.00 |
| 55 | Pin temp conc barrier (70400125) | EACH | 192 | $40.00 | $30.00 | $70.00 | $100.00 | $70.00 | $7.00 |
| 56 | Rel temp conc barrier (70400200) | LF | 393 | $10.00 | $45.00 | $16.00 | $35.00 | $20.00 | $50.00 |
| 57 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $3,000.00 | $3,000.00 | $3,375.00 | $3,000.00 | $4,000.00 | $3,500.00 |
| 58 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $600.00 | $600.00 | $675.00 | $600.00 | $712.00 | $690.00 |
| 59 | Paint PVT MK line 4 (78001110) | LF | 5,888 | $0.60 | $0.48 | $0.70 | $0.60 | $1.00 | $0.70 |
| 60 | PVT MKG rem WTR blast (78300202) | SF | 1,143 | $3.00 | $3.50 | $3.35 | $3.00 | $4.00 | $3.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.