IDOT contract 89868 bid tabulation

Aledo, section 23-00049-00-BT. Let by Illinois DOT on April 25, 2025, Mercer, District 04. 8 bids received; low bid $918,761 by Phoenix Corporation of the Quad Cities.

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
48
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Phoenix Corporation of the Quad Cities$918,761Low
2Brandt Construction Co.$990,955+8.0%
3McCarthy Improvement Company$1,065,432+16%
4Centennial Contractors of the Quad Cities, Inc.$1,104,564+20%
5Hood Construction Group Midwest$1,192,521+30%
6Valley Construction Co.$1,201,390+31%
7Laverdiere Construction, Inc.$1,256,076+37%
8Fischer Excavating, Inc.$1,440,690+57%
IDOT contract 89868: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Phoenix Corporation of the Quad Cities2. Brandt Construction Co.3. McCarthy Improvement Company4. Centennial Contractors of the Quad Cities, Inc.5. Hood Construction Group Midwest6. Valley Construction Co.
1Rock fill (special) (XZ054505)TON200$20.00$30.00$50.00$70.00$50.00$80.00
2WM qua cas pipe 20 (X1200311)LF63$130.00$345.00$184.00$167.31$160.00$350.00
3Seeding CL 1 SPL (X2500900)ACRE0.90$22,000$11,255$8,300.00$11,000$15,000$7,500.00
4Abandon EX culvert (X5509912)EACH1$850.00$980.00$600.00$1,447.16$1,000.00$1,775.00
5Storm sewer removal (X5510100)LF73$24.00$40.00$18.00$59.18$40.00$150.00
6Inlets TG-1 SPL (X6021065)EACH12$4,600.00$5,625.00$4,600.00$4,717.90$6,300.00$7,960.00
7Comb CC&G TM2.12 mod (X6060077)LF2,228$38.00$45.00$35.00$50.00$44.00$35.00
8Traf cont & prot SPL (X7010216)LS1$12,800$14,500$25,446$14,080$15,000$12,800
9Reloc sign panel&post (X7240505)EACH11$300.00$335.00$300.00$330.00$200.00$807.43
10Construction layout (Z0013798)LS1$12,000$15,000$15,000$14,850$15,000$9,000.00
11SS 1 wat MN 12 (Z0056648)LF69$112.00$98.00$110.00$104.28$120.00$185.00
12Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80$0.80
13Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00$15.00
14Earth excavation (20200100)CY643$32.00$25.00$50.00$34.00$25.00$55.00
15Furnished excavation (20400800)CY1,618$40.00$30.00$45.00$40.00$15.00$35.00
16Temp eros contr seed (28000250)LB93$6.75$11.00$20.00$11.00$3.00$20.43
17Perimeter eros bar (28000400)LF447$5.50$5.50$8.00$3.00$4.00$7.00
18Inlet & pipe protect (28000500)EACH30$275.00$225.00$175.00$150.00$100.00$180.00
19Agg base cse B (35101400)TON1,386$42.00$49.00$64.00$30.00$50.00$67.00
20Bit matls tack CT (40600290)LB445$2.00$5.00$1.00$0.33$10.00$0.80
21HMA SC IL-9.5FG D N50 (40604010)TON436$150.00$130.00$165.00$150.59$300.00$176.00
22PCC driveway pavt 6 (42300200)SY223$71.00$95.00$103.00$75.00$105.00$100.00
23PCC driveway pavt 8 (42300400)SY444$78.50$97.00$112.00$83.00$95.00$100.00
24PC conc sidewalk 5 (42400200)SF15,780$8.25$8.00$11.00$12.00$14.50$10.00
25Detectable warnings (42400800)SF371$43.00$55.00$36.00$50.00$45.00$33.00
26Pavement rem (44000100)SY1,538$19.25$17.00$21.00$18.00$20.00$16.00
27Drive pavement rem (44000200)SY658$12.75$20.00$17.00$18.00$12.00$11.00
28Comb curb gutter rem (44000500)LF39$19.00$25.00$30.00$15.00$20.00$19.50
29Sidewalk rem (44000600)SF214$7.00$5.00$3.00$2.50$3.00$3.50
30P cul CL C 1 12 (542C0217)LF20$97.00$85.00$80.00$102.63$95.00$72.00
31Metal FL end sec 12" (54262712)EACH1$450.00$760.00$215.00$808.72$300.00$1,100.00
32Storm sew CL A 1 12 (550A0050)LF1,537$64.00$62.00$62.00$82.06$95.00$98.00
33Adj water main 6 (56106300)LF76$207.00$250.00$180.00$327.14$150.00$200.00
34Water valves adjust (56109210)EACH1$900.00$1,050.00$200.00$1,024.43$250.00$1,750.00
35Fire hydnts to BE adj (56400300)EACH3$5,500.00$1,875.00$2,210.00$2,013.11$2,500.00$5,000.00
36Man TA 4 dia T1F OL (60218300)EACH1$4,700.00$4,225.00$3,200.00$5,005.44$5,000.00$6,500.00
37Man TA 4 dia T1F CL (60218400)EACH3$4,700.00$4,875.00$3,200.00$5,005.44$5,000.00$6,800.00
38Man TA 5 dia T1F CL (60221100)EACH1$5,300.00$5,295.00$3,600.00$6,148.23$6,000.00$7,400.00
39Inlets TA T1F OL (60234200)EACH13$2,000.00$2,600.00$2,400.00$4,102.89$3,000.00$3,750.00
40Man adjust (60255500)EACH1$1,125.00$850.00$1,200.00$1,604.31$750.00$1,450.00
41Remov inlets (60500060)EACH6$450.00$750.00$800.00$638.44$700.00$1,050.00
42Comb CC&G TY B-6.24 (60605000)LF39$55.50$95.00$78.00$55.00$70.00$70.00
43Mobilization (67100100)LS1$35,100$60,000$61,000$87,500$65,000$72,000
44Sign panel T1 (72000100)SF38$40.00$45.00$40.00$46.00$40.00$40.00
45Terminal marker - PM (72501100)EACH2$300.00$335.00$300.00$345.00$140.00$300.00
46Metal post TY A (72900100)LF170$25.00$30.00$25.00$28.75$32.00$25.00
47Epoxy PVT MK line 6 (78005130)LF724$8.00$20.00$23.00$2.20$18.00$17.92
48Epoxy PVT MK line 24 (78005180)LF91$56.50$80.00$23.00$14.30$72.00$72.00
IDOT contract 89868: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy