Laverdiere Construction, Inc.: IDOT bid record

Laverdiere Construction, Inc. submitted 68 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 14 of them (21%). When it was not low, its total sat a median +23% above the low bid.

Owner
Illinois DOT
Low bid volume
$20,633,558
Latest bid
18 SEP 2026
Data through
18 SEP 2026
68Bids
14Low bids
21Win rate, percent
+23%Median gap to the low bid when not low, 54 bids

By year

YearBidsLow bidsWin rate
20211200%
20225240%
20235240%
202414429%
202521314%
202611327%
Laverdiere Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0433618%
District 0633824%
District 02200%
Laverdiere Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR2020 (100%)$15.00$15.00
TraineesZ0076600HR2020 (100%)$0.80$0.80
Filter fabric28200200SY2619 (73%)$3.00$4.65
Earth excavation20200100CY3513 (37%)$36.00$48.00
Name plates51500100EACH2313 (57%)$900.00$773.24
Perimeter eros bar28000400LF3611 (31%)$4.25$3.50
Reinf bars, epoxy CTD50800205LB2810 (36%)$3.00$2.50
Rem exist struct50100100EACH1810 (56%)$26,000$50,000
Driving piles51202305LF119 (82%)$0.01$0.10
Protective coat50300300SY168 (50%)$7.50$3.00
Geotech fab F/GR stab21001000SY138 (62%)$3.50$2.60
Conc sup-STR50300255CY197 (37%)$2,808.00$2,100.00
Laverdiere Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Laverdiere Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202672E88District 06Section 10DR6 of 6$113,102+39%
27 FEB 202668K58District 04Section [(12B)BR]BRR1 of 3$393,005Low, 22% under the second
27 FEB 202668K59District 04Section [(55-2)B,B-1]SLP2 of 2$139,000+8.0%
27 FEB 202693845District 06Project Number: Yehf-204 / /, section 24-08117-00-BR1 of 4$504,870Low, 5.0% under the second
27 FEB 202693852District 06Rushville, section 14-00019-00-FP1 of 3$1,249,952Low, 36% under the second
16 JAN 202672913District 06Section (69VBR)I5 of 8$48,790+92%
16 JAN 202672F57District 06Section (1B-2)BJR,BDR,BRR2 of 6$410,460+13%
16 JAN 202689781District 04Project Number: Rjcz-314 / /, section 17-00138-00-BR2 of 3$1,229,862+11%
16 JAN 202689823District 04Project Number: 3J5S-767 / /, section 20-00118-00-BR4 of 4$734,141+24%
16 JAN 202689834District 04Galesburg, section 19-01502-40-BT3 of 3$2,387,107+25%
16 JAN 202693849District 06Project Number: W05Y-243 / /, section 24-00017-07-BR2 of 2$1,191,215+14%
07 NOV 202572688District 062 of 4$136,368+40%
07 NOV 202585783District 02Kewanee, section 22-00111-00-SW7 of 8$751,240+40%
07 NOV 202593846District 06Project Number: Hs17-651 / /, section 22-00103-02-BR4 of 5$506,603+7.0%
01 AUG 202568J12District 04Section [106BC-1;108(C,VB,VC)NRS)]BRR1 of 2$2,803,521Low, 3.0% under the second
01 AUG 202568J13District 04Section (15VB,F)BRR4 of 5$719,510+45%
01 AUG 202568J14District 04Section D44 of 4$3,053,691+29%
01 AUG 202572949District 06Section 126B-2(BDR,BRR,BJR)2 of 2$453,093+9.0%
01 AUG 202593840District 06Project Number: 8Sir-346 / /, section 24-14119-00-BR2 of 3$563,644+5.0%
13 JUN 202568J44District 04Section (123B)I-22 of 2$218,106+130%
13 JUN 202572343District 06Section 123B-1(BDR,BRR,BJR)2 of 2$455,033+43%
13 JUN 202572344District 06Section (25B-1,112B-2)BDR,BRR2 of 2$606,915+21%
13 JUN 202572346District 06Section 1-7B(BDR,BRR)3 of 3$689,393+25%
13 JUN 202593836District 06Project Number: Vgsl-343 / /, section 22-00142-00-BR3 of 3$1,342,822+16%
25 APR 202589780District 04Monmouth, section 17-00081-01-RP2 of 3$3,542,871+24%
Laverdiere Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way