Sangamo Construction Company: IDOT bid record

Sangamo Construction Company submitted 205 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 61 of them (30%). When it was not low, its total sat a median +17% above the low bid.

Owner
Illinois DOT
Low bid volume
$143,818,281
Latest bid
18 SEP 2026
Data through
18 SEP 2026
205Bids
61Low bids
30Win rate, percent
+17%Median gap to the low bid when not low, 144 bids

By year

YearBidsLow bidsWin rate
2021381437%
202231826%
202332825%
2024471532%
202529621%
2026281036%
Sangamo Construction Company, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 06901719%
District 07843542%
District 0527933%
District 09400%
Sangamo Construction Company, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reinf bars, epoxy CTD50800205LB12654 (43%)$2.23$2.50
Trainees TPGZ0076604HR5252 (100%)$15.00$15.00
TraineesZ0076600HR5151 (100%)$0.80$0.80
Protective coat50300300SY12850 (39%)$3.49$3.00
Raised ref PVT MK rem78300200EACH5648 (86%)$12.48$15.00
Deck slab rep (FD-T2)Z0016002SY7139 (55%)$1,588.61$1,850.00
BR deck scar 3/4Z0012130SY4433 (75%)$61.31$70.53
Temp BR traf signals70106500EACH7132 (45%)$19,862$15,400
Name plates51500100EACH6532 (49%)$718.08$773.24
Geocomposite wall DR59100100SY5129 (57%)$29.52$30.00
Conc sup-STR50300255CY10628 (26%)$2,855.27$2,100.00
Short term pavt mking70300100LF6828 (41%)$2.12$1.01
Sangamo Construction Company, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Sangamo Construction Company, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202672406District 06Section (1ZB1)BDR-12 of 3$8,538,416+23%
18 SEP 202672E59District 06Section (54-10HB-2)BDR,BP,BRR,BJR2 of 4$1,573,388+6.0%
18 SEP 202672E83District 06Section (10B-1)BDR,BRR-1,I2 of 2$894,366+24%
18 SEP 202674650District 07Section (15-22VB)BR1 of 3$11,526,296Low, 3.0% under the second
18 SEP 202674D71District 07Section D72 of 3$846,018+9.0%
12 JUN 202670D62District 05Section (101)BR2 of 2$8,768,622+10%
12 JUN 202670H72District 05Section MBPM4 of 4$599,513+124%
12 JUN 202672512District 06Section (69-2B-2)BDR4 of 4$184,007+27%
12 JUN 202672E71District 06Section (54-3)I-42 of 2$261,085+61%
12 JUN 202672E76District 06Section (84-5-1HB,2HB)BRR2 of 2$186,4420.0%
12 JUN 202674705District 07Section (58-63HVB)BR2 of 3$18,955,053+1.0%
12 JUN 202674B79District 07Section D71 of 2$1,036,447Low, 12% under the second
24 APR 202672296District 06Section (111B-1)BDR4 of 4$850,912+17%
24 APR 202672669District 06Section (7B-1)BDR-1,BP,BRR,BJR1 of 1$1,677,084Low
27 FEB 202670H61District 05Section (240B)BR-12 of 2$515,950+25%
27 FEB 202670H62District 05Section (22)BR-1,(115)BR-11 of 1$926,892Low
27 FEB 202674368District 07Section (128BR-1)B-11 of 2$2,735,104Low, 21% under the second
27 FEB 202674653District 07Section (32Q-MFT)BR1 of 2$3,082,674Low, 41% under the second
27 FEB 202674C49District 07Section D71 of 2$1,826,162Low, 12% under the second
27 FEB 202693842District 06Mt. Pulaski, section 24-00013-00-SW2 of 4$289,482+4.0%
16 JAN 202670E65District 05Section (76-00221-00)BR-11 of 2$1,304,781Low, 37% under the second
16 JAN 202672715District 06Section 28VBR-BRR3 of 3$383,104+16%
16 JAN 202672732District 06Section 69-1BDR2 of 4$505,337+4.0%
16 JAN 202672978District 06Section (140B-1)BDR1 of 4$674,724Low, 9.0% under the second
16 JAN 202672979District 06Section (84-2HB-5)BDR,BRR2 of 3$504,449+27%
Sangamo Construction Company: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy