IDOT contract 74D71 bid tabulation
Section D7. Let by Illinois DOT on September 18, 2026, Lawrence, District 07. 3 bids received; low bid $773,773 by C-Hill Civil Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 46
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C-Hill Civil Contractors, Inc. | $773,773 | Low |
| 2 | Sangamo Construction Company | $846,018 | +9.0% |
| 3 | Samron Midwest Contracting, Inc. | $858,422 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C-Hill Civil Contractors, Inc. | 2. Sangamo Construction Company | 3. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|---|
| 1 | BR deck grooving long (X5030250) | SY | 240 | $41.00 | $26.61 | $30.00 |
| 2 | TC-prot 701321 SPL (X7010202) | EACH | 1 | $28,726 | $31,140 | $30,000 |
| 3 | BR approach SHLD rem (Z0001495) | SY | 44 | $61.00 | $70.68 | $35.00 |
| 4 | Approach slab rem (Z0004552) | SY | 106 | $114.00 | $86.90 | $60.00 |
| 5 | Diamond grind BR sec (Z0029090) | SY | 292 | $64.00 | $40.10 | $35.00 |
| 6 | Earth exc wid (20200500) | CY | 70 | $99.00 | $186.12 | $200.00 |
| 7 | HMA BC wid 10 (35600716) | SY | 252 | $165.00 | $166.22 | $180.00 |
| 8 | Agg surf course TY B (40200800) | TON | 2 | $420.00 | $461.47 | $200.00 |
| 9 | Bit matls tack CT (40600290) | LB | 77 | $0.01 | $0.01 | $0.01 |
| 10 | HMA surf rem butt JT (40600982) | SY | 234 | $44.00 | $35.17 | $68.00 |
| 11 | Temporary ramp (40600990) | SY | 40 | $45.00 | $127.21 | $60.00 |
| 12 | HMA SC IL-9.5 C N70 (40604052) | TON | 23 | $1,020.00 | $1,029.35 | $1,120.00 |
| 13 | PVT con HMA BR app SL (42000070) | SY | 67 | $741.00 | $747.82 | $815.00 |
| 14 | Pavement rem (44000100) | SY | 54 | $88.00 | $168.72 | $72.00 |
| 15 | Agg wedge SHLD type B (48102100) | TON | 44 | $110.00 | $117.91 | $150.00 |
| 16 | Conc rem (50102400) | CY | 11.90 | $3,060.00 | $3,262.70 | $4,000.00 |
| 17 | Conc struct (50300225) | CY | 23.10 | $1,385.00 | $1,882.78 | $2,000.00 |
| 18 | Conc sup-STR (50300255) | CY | 13.30 | $5,200.00 | $4,501.53 | $5,000.00 |
| 19 | Protective coat (50300300) | SY | 344 | $6.00 | $3.73 | $2.30 |
| 20 | Conc supstr app slab (50301350) | CY | 66.40 | $715.00 | $758.96 | $834.00 |
| 21 | Reinf bars, epoxy CTD (50800205) | LB | 29,020 | $1.72 | $1.97 | $2.00 |
| 22 | Bar splicers (50800515) | EACH | 256 | $54.00 | $65.67 | $54.00 |
| 23 | Pref JT strip seal (52000110) | LF | 71 | $315.00 | $326.40 | $360.00 |
| 24 | Deck slab rep (FD-T1) (53016001) | SY | 10 | $1,750.00 | $2,230.36 | $2,300.00 |
| 25 | Deck slab rep (FD-T2) (53016002) | SY | 5 | $1,750.00 | $1,782.11 | $2,300.00 |
| 26 | BR deck scar 3/4 (53101002) | SY | 160 | $355.00 | $416.25 | $415.00 |
| 27 | BRD flyash/GGBF 2 1/2 (53101209) | SY | 160 | $350.00 | $302.31 | $230.00 |
| 28 | Rem RE-E T B term T6 (63302700) | EACH | 4 | $3,940.00 | $4,429.11 | $4,300.00 |
| 29 | Engr field office A (67000400) | CAL MO | 6 | $2,200.00 | $2,828.88 | $2,500.00 |
| 30 | Mobilization (67100100) | LS | 1 | $45,000 | $49,915 | $50,000 |
| 31 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 | $6,233.31 | $0.01 |
| 32 | Traf cont-prot 701326 (70100500) | LS | 1 | $0.01 | $13,240 | $0.01 |
| 33 | Temp BR traf signals (70106500) | EACH | 1 | $21,500 | $19,221 | $50,000 |
| 34 | Pavt MK blkout tape 5 (70107005) | LF | 800 | $3.75 | $5.44 | $2.20 |
| 35 | Changeable message SN (70107025) | CAL DAY | 28 | $163.00 | $188.49 | $150.00 |
| 36 | Short term pavt mking (70300100) | LF | 105 | $2.75 | $3.79 | $7.00 |
| 37 | SHRT TRM pavt MK rem (70300150) | SF | 368 | $4.00 | $3.38 | $3.00 |
| 38 | Temp PVT MK line 4 - paint (70300221) | LF | 884 | $0.01 | $1.00 | $0.01 |
| 39 | Temp conc barrier (70400100) | LF | 367 | $45.00 | $54.68 | $50.00 |
| 40 | Pin temp conc barrier (70400125) | EACH | 30 | $34.00 | $41.21 | $20.00 |
| 41 | Rel temp conc barrier (70400200) | LF | 292 | $10.50 | $9.90 | $5.50 |
| 42 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $4,000.00 | $8,293.46 | $6,000.00 |
| 43 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $760.00 | $1,639.02 | $800.00 |
| 44 | Paint PVT MK line 4 (78001110) | LF | 884 | $5.50 | $5.56 | $5.00 |
| 45 | Raised refl pavt MKR (78100100) | EACH | 2 | $2,760.00 | $2,781.80 | $2,000.00 |
| 46 | Raised ref PVT MK rem (78300200) | EACH | 2 | $24.00 | $13.48 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.