White Construction LLC: IDOT bid record

White Construction LLC submitted 135 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 17 NOV 2023, and was the low bidder on 29 of them (21%). When it was not low, its total sat a median +20% above the low bid.

Owner
Illinois DOT
Low bid volume
$64,827,663
Latest bid
17 NOV 2023
Data through
18 SEP 2026
135Bids
29Low bids
21Win rate, percent
+20%Median gap to the low bid when not low, 106 bids

By year

YearBidsLow bidsWin rate
2021531019%
2022451227%
202337719%
White Construction LLC, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 06481531%
District 072927%
District 0427311%
District 0527830%
District 03300%
District 0211100%
White Construction LLC, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Changeable message SN70107025CAL DAY8149 (60%)$80.00$55.00
Terminal marker - DA72501000EACH5741 (72%)$42.00$47.85
Bit matls tack CT40600290LB5236 (69%)$2.87$0.01
Trainees TPGZ0076604HR3636 (100%)$15.00$15.00
TraineesZ0076600HR3636 (100%)$0.80$0.80
Protective coat50300300SY7133 (46%)$3.00$3.00
TR bar TRM T1 SPL tan63100167EACH5032 (64%)$3,585.00$3,800.00
BR deck grooving50300260SY4730 (64%)$9.50$10.00
SPBGR TY A 6FT posts63000001LF4330 (70%)$33.80$35.70
Grdrail ref type A78200005EACH4229 (69%)$10.00$11.00
Traf bar term T663100085EACH3928 (72%)$4,140.00$4,400.00
Conc sup-STR50300255CY6626 (39%)$1,725.00$2,100.00
White Construction LLC, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

White Construction LLC, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
17 NOV 202372F59District 06Section 6CR-16 of 6$2,236,000+47%
17 NOV 202372K83District 06Section 139C4 of 4$1,324,000+39%
17 NOV 202374B29District 07Section D73 of 3$1,479,330+21%
17 NOV 202374B30District 07Section D73 of 3$2,750,614+41%
17 NOV 202374B33District 07Section D73 of 3$655,399+32%
17 NOV 202374B39District 07Section D73 of 3$765,225+20%
17 NOV 202389815District 04Project Number: Vk03-277 / /, section 19-00115-00-BR2 of 2$6,693,000+46%
22 SEP 202368886District 04Section (72-3HB-4)BR3 of 3$12,491,884+32%
04 AUG 202370860District 05Section (92-12HB-4)BR-11 of 3$10,240,000Low, 0.0% under the second
16 JUN 202368862District 04Section (Z-2C-15D)BR-12 of 2$3,830,000+3.0%
16 JUN 202370908District 05Section (10-31HB)BR3 of 3$4,850,000+27%
16 JUN 202370A87District 05Section (10-30)BR3 of 3$8,875,000+20%
16 JUN 202370D61District 05Section (74-68)BR1 of 2$8,349,591Low, 3.0% under the second
16 JUN 202372N44District 06Section (69-8VB)BRR1 of 3$161,000Low, 15% under the second
16 JUN 202372N45District 06Section (3-VB)BRR1 of 2$175,000Low, 10% under the second
16 JUN 202391617District 05Project Number: Rukh-033 / /, section 18-02155-00-BR3 of 3$569,773+27%
16 JUN 202391632District 05Project Number: Kukm-571 / /, section 22-03122-00-BR3 of 3$383,473+15%
16 JUN 202391633District 05Project Number: Pbqu-630 / /, section 22-03123-00-BR2 of 3$401,474+11%
16 JUN 202391634District 05Project Number: Bkli-479 / /, section 22-14120-00-BR2 of 3$348,870+1.0%
28 APR 202368E54District 04Section (12)CLV,SLP3 of 3$1,380,000+47%
28 APR 202372G06District 06Section 2B-21 of 2$2,211,000Low, 1.0% under the second
28 APR 202374842District 07Section (12-51B)BR-22 of 2$2,104,180+2.0%
28 APR 202395912District 07Project Number: A2Ha-541 / /, section 12-00251-00-BR2 of 3$31,955,085+6.0%
10 MAR 202368G40District 04Section [(Z-4B-15D)BR]BDR,SCR3 of 3$615,000+17%
10 MAR 202370541District 05Section 55-BR-12 of 2$2,482,332+11%
White Construction LLC: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy