Otto Baum Company, Inc. submitted 129 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 37 of them (29%). When it was not low, its total sat a median +16% above the low bid.

Owner
Illinois DOT
Low bid volume
$52,859,606
Latest bid
18 SEP 2026
Data through
18 SEP 2026
129Bids
37Low bids
29Win rate, percent
+16%Median gap to the low bid when not low, 90 bids

By year

YearBidsLow bidsWin rate
202124417%
202226415%
2023281036%
202412325%
202519842%
202620840%
Otto Baum Company, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 04772229%
District 06421536%
District 05700%
District 07300%
Otto Baum Company, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR4141 (100%)$15.00$15.00
TraineesZ0076600HR3737 (100%)$0.80$0.80
Reinf bars, epoxy CTD50800205LB4719 (40%)$3.19$2.50
Engr field office A67000400CAL MO2619 (73%)$1,703.93$2,550.00
Temp eros contr seed28000250LB4715 (32%)$4.77$5.00
Pavement rem44000100SY4215 (36%)$21.55$20.30
Conc rem50102400CY3715 (41%)$3,378.94$2,400.00
Earth excavation20200100CY6714 (21%)$52.95$48.00
Temp BR traf signals70106500EACH2514 (56%)$19,338$15,400
Inlet & pipe protect28000500EACH3913 (33%)$207.33$200.00
Engr field office B67000500CAL MO2213 (59%)$1,798.30$2,500.00
Changeable message SN70107025CAL DAY7512 (16%)$107.35$55.00
Otto Baum Company, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Otto Baum Company, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202668H60District 04Section (35)N-21 of 4$649,800Low, 13% under the second
18 SEP 202672E59District 06Section (54-10HB-2)BDR,BP,BRR,BJR1 of 4$1,485,400Low, 6.0% under the second
18 SEP 202672E88District 06Section 10DR2 of 6$83,200+2.0%
12 JUN 202646918District 04Section M-W2 of 3$1,069,500+16%
12 JUN 202672512District 06Section (69-2B-2)BDR3 of 4$153,500+6.0%
12 JUN 202672E71District 06Section (54-3)I-41 of 2$162,400Low, 61% under the second
12 JUN 202672E73District 06Section (112B-1)BRR,I1 of 4$56,000Low, 41% under the second
12 JUN 202672J76District 06Section (11BR,10B-1,10B-5)BDR1 of 3$1,870,400Low, 3.0% under the second
24 APR 202668J16District 04Section (90-11HB6)BRR2 of 2$554,600+16%
24 APR 202672296District 06Section (111B-1)BDR3 of 4$818,100+12%
24 APR 202672511District 06Section (14B-2)BDR3 of 3$169,000+29%
24 APR 202689844District 04Project Number: Ykq5-440 / /, section 21-00112-00-BR3 of 3$3,143,400+30%
27 FEB 202668J46District 04Section 116N,TS-11 of 4$749,500Low, 1.0% under the second
27 FEB 202668J51District 04Section [(Z-D-SB)BR]BJR,BP2 of 2$1,070,700+22%
16 JAN 202668J43District 04Section [(104B-1)BR]BRR2 of 2$530,500+6.0%
16 JAN 202672913District 06Section (69VBR)I7 of 8$94,800+272%
16 JAN 202672978District 06Section (140B-1)BDR2 of 4$738,300+9.0%
16 JAN 202672F57District 06Section (1B-2)BJR,BDR,BRR1 of 6$361,800Low, 13% under the second
16 JAN 202689873District 04Project Number: Qf4C-244 / /, section 22-00112-00-BR1 of 4$898,500Low, 2.0% under the second
16 JAN 202693826District 06Lincoln, section 98-00081-00-PV3 of 3$10,436,400+21%
07 NOV 202568F45District 042 of 2$6,170,000+22%
07 NOV 202593846District 06Project Number: Hs17-651 / /, section 22-00103-02-BR3 of 5$498,000+5.0%
19 SEP 202572324District 06Section (86-9HB2)BDR,BRR2 of 3$597,700+10%
19 SEP 202572976District 06Section 4DR-13 of 5$123,000+2.0%
01 AUG 202568B70District 04Section (Y,72-6)TS1 of 3$1,750,000Low, 5.0% under the second
Otto Baum Company, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy