IDOT contract 93826 bid tabulation
Lincoln, section 98-00081-00-PV. Let by Illinois DOT on January 16, 2026, Logan, District 06. 3 bids received; low bid $8,590,597 by Kinney Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 152
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kinney Contractors, Inc. | $8,590,597 | Low |
| 2 | Illinois Valley Paving, a div of UCM, Inc. | $9,884,946 | +15% |
| 3 | Otto Baum Company, Inc. | $10,436,400 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kinney Contractors, Inc. | 2. Illinois Valley Paving, a div of UCM, Inc. | 3. Otto Baum Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Mailbx rem & reinstl (XX005569) | EACH | 5 | $1,000.00 | $503.56 | $423.25 |
| 2 | Conc C&G outlet SP (XX006529) | EACH | 2 | $2,115.00 | $1,513.07 | $1,326.34 |
| 3 | Man TA 9 dia SPL F&G (XX009607) | EACH | 1 | $26,000 | $27,300 | $38,632 |
| 4 | Steel post removal (X0323569) | EACH | 4 | $275.00 | $439.04 | $158.55 |
| 5 | Outlet SPL (X0324058) | EACH | 31 | $550.00 | $5,362.33 | $1,193.12 |
| 6 | Bollard removal (X0350810) | EACH | 4 | $275.00 | $878.07 | $158.55 |
| 7 | HMA surf rem var DP (X4401198) | SY | 10,415 | $7.50 | $6.38 | $5.59 |
| 8 | Drop box no.1 (X5420201) | EACH | 1 | $8,000.00 | $8,610.00 | $11,221 |
| 9 | Drop box no.2 (X5420202) | EACH | 1 | $12,500 | $12,810 | $15,321 |
| 10 | Drop box no.3 (X5420203) | EACH | 1 | $10,650 | $11,078 | $13,162 |
| 11 | Drop box no.4 (X5420204) | EACH | 1 | $17,500 | $18,113 | $24,476 |
| 12 | Man TA 8D SPL F&G (X6020296) | EACH | 2 | $17,750 | $19,110 | $31,603 |
| 13 | Inlets TG-1 SPL (X6021065) | EACH | 8 | $5,900.00 | $9,669.19 | $4,972.87 |
| 14 | Inlets TA W/SPL F&G (X6023508) | EACH | 8 | $2,285.00 | $2,730.00 | $3,057.35 |
| 15 | Traf cont & prot SPL (X7010216) | LS | 1 | $82,500 | $155,995 | $150,000 |
| 16 | GDRL agg eros cont (Z0001002) | TON | 44 | $100.00 | $265.46 | $94.42 |
| 17 | Construction layout (Z0013798) | LS | 1 | $32,500 | $95,647 | $51,707 |
| 18 | Detour signing (Z0016702) | LS | 1 | $12,000 | $52,659 | $53,018 |
| 19 | Fill exist culverts (Z0023500) | CY | 36 | $275.00 | $420.00 | $395.93 |
| 20 | RR prot liability ins (Z0048665) | LS | 1 | $5,000.00 | $8,183.44 | $11,159 |
| 21 | SS 1 wat MN 12 (Z0056648) | LF | 282 | $155.00 | $108.15 | $94.67 |
| 22 | SS 1 wat MN 15 (Z0056650) | LF | 495 | $160.00 | $117.60 | $89.24 |
| 23 | SS 1 wat MN 18 (Z0056652) | LF | 432 | $162.00 | $127.05 | $90.87 |
| 24 | Trainees (Z0076600) | HR | 2,500 | $0.80 | $0.80 | $0.80 |
| 25 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 | $15.00 | $15.00 |
| 26 | Tree remov 6-15 (20100110) | UNIT | 12 | $95.00 | $262.50 | $314.73 |
| 27 | Earth excavation (20200100) | CY | 34,660 | $21.00 | $17.22 | $28.03 |
| 28 | Rem & disp uns matl (20201200) | CY | 1,173 | $39.00 | $44.53 | $32.48 |
| 29 | Gran embank spec (21000300) | TON | 2,361 | $48.00 | $44.45 | $65.96 |
| 30 | Geotech fab F/GR stab (21001000) | SY | 3,455 | $3.00 | $2.99 | $3.54 |
| 31 | Topsoil F & P 4 (21101615) | SY | 46,011 | $5.75 | $4.75 | $6.94 |
| 32 | Grading & shap ditch (21400100) | LF | 391 | $20.00 | $19.59 | $17.49 |
| 33 | Seeding CL 1A (25000110) | ACRE | 12.50 | $1,285.00 | $1,249.50 | $1,268.16 |
| 34 | Nitrogen fert nutr (25000400) | LB | 1,126 | $1.10 | $1.05 | $1.07 |
| 35 | Phosphorus fert nutr (25000500) | LB | 1,126 | $1.10 | $1.05 | $1.07 |
| 36 | Potassium fert nutr (25000600) | LB | 1,126 | $1.10 | $1.05 | $1.07 |
| 37 | Mulch method 2 (25100115) | ACRE | 12.50 | $1,285.00 | $1,249.50 | $1,268.16 |
| 38 | Temp eros contr seed (28000250) | LB | 1,250 | $2.50 | $3.07 | $6.78 |
| 39 | Temp ditch checks (28000305) | LF | 640 | $17.00 | $27.62 | $12.79 |
| 40 | Perimeter eros bar (28000400) | LF | 344 | $8.00 | $18.94 | $5.89 |
| 41 | Inlet & pipe protect (28000500) | EACH | 37 | $250.00 | $360.38 | $168.76 |
| 42 | Inlet filters (28000510) | EACH | 61 | $225.00 | $350.76 | $439.10 |
| 43 | Stone riprap CL A4 (28100107) | SY | 245 | $94.50 | $155.45 | $108.01 |
| 44 | Filter fabric (28200200) | SY | 245 | $3.50 | $5.77 | $6.99 |
| 45 | Agg subgrade impr 12 (30300112) | SY | 20,278 | $25.00 | $42.77 | $25.68 |
| 46 | Agg base cse B (35101400) | TON | 340 | $52.50 | $93.45 | $44.70 |
| 47 | Agg base cse B 4 (35101600) | SY | 6,252 | $13.50 | $26.20 | $14.11 |
| 48 | HMA BC wid 4 (35600650) | SY | 2,931 | $39.25 | $35.50 | $40.37 |
| 49 | Agg surf course TY B (40200800) | TON | 667 | $48.00 | $101.05 | $42.76 |
| 50 | Aggregate-temp access (40201000) | TON | 750 | $51.50 | $81.00 | $52.92 |
| 51 | Bit matls PR CT (40600275) | LB | 8,802 | $1.20 | $1.09 | $1.13 |
| 52 | P bit matls tack CT (40600295) | LB | 15,163 | $1.20 | $1.11 | $0.80 |
| 53 | Long joint sealant (40600370) | LF | 3,224 | $5.70 | $5.26 | $7.84 |
| 54 | HMA surf rem butt JT (40600982) | SY | 171 | $10.30 | $9.35 | $15.51 |
| 55 | Temporary ramp (40600990) | SY | 134 | $30.00 | $8.75 | $16.82 |
| 56 | HMA BC IL-9.5FG N50 (40602965) | TON | 1,018 | $164.00 | $148.83 | $163.89 |
| 57 | P HMA SC IL-9.5 D N50 (40604160) | TON | 885 | $179.50 | $162.67 | $188.52 |
| 58 | Incidental HMA surf (40800050) | TON | 150 | $330.00 | $301.31 | $390.67 |
| 59 | PCC PVT 8 jointed (42000301) | SY | 16,159 | $84.50 | $93.87 | $100.99 |
| 60 | Protective coat (42001300) | SY | 22,660 | $0.05 | $0.01 | $1.21 |
| 61 | PCC driveway pavt 6 (42300200) | SY | 182 | $100.00 | $125.39 | $70.13 |
| 62 | PCC driveway pavt 8 (42300400) | SY | 2,903 | $105.00 | $122.44 | $86.83 |
| 63 | Pavement rem (44000100) | SY | 14,639 | $18.50 | $23.90 | $17.51 |
| 64 | Drive pavement rem (44000200) | SY | 2,546 | $19.00 | $24.35 | $13.44 |
| 65 | Comb curb gutter rem (44000500) | LF | 203 | $10.00 | $10.30 | $7.98 |
| 66 | CL D patch T2 6 (44201717) | SY | 11 | $230.00 | $168.07 | $542.75 |
| 67 | CL D patch T3 6 (44201721) | SY | 41 | $210.00 | $168.07 | $330.26 |
| 68 | CL D patch T4 6 (44201723) | SY | 27 | $198.00 | $168.07 | $309.85 |
| 69 | Aggregate SHLDS B 6 (48101500) | SY | 12 | $90.00 | $118.55 | $98.58 |
| 70 | Pipe culvert remov (50105220) | LF | 1,841 | $68.50 | $64.05 | $33.16 |
| 71 | P cul CL A 1 12 (542A0217) | LF | 86 | $81.00 | $92.40 | $132.30 |
| 72 | P cul CL A 1 24 (542A0229) | LF | 70 | $129.00 | $132.30 | $178.80 |
| 73 | P cul CL A 1 30 (542A0235) | LF | 75 | $202.00 | $147.00 | $202.56 |
| 74 | P cul CL A 1 36 (542A0241) | LF | 96 | $175.00 | $162.75 | $208.58 |
| 75 | P cul CL A 1 eqrs 24 (542A5479) | LF | 51 | $215.00 | $175.35 | $236.58 |
| 76 | P cul CL A 1 eqrs 27 (542A5482) | LF | 641 | $203.00 | $181.65 | $227.70 |
| 77 | P cul CL D 1 12 (542D0217) | LF | 60 | $53.00 | $47.25 | $47.48 |
| 78 | P cul CL D 1 15 (542D0220) | LF | 584 | $60.00 | $52.50 | $50.78 |
| 79 | P cul CL D 1 18 (542D0223) | LF | 136 | $66.00 | $61.95 | $56.20 |
| 80 | PRC flar end sec 12 (54213657) | EACH | 9 | $1,975.00 | $1,207.50 | $1,367.89 |
| 81 | PRC flar end sec 24 (54213669) | EACH | 2 | $3,000.00 | $1,496.25 | $1,890.19 |
| 82 | PRC flar end sec 30 (54213675) | EACH | 2 | $3,350.00 | $1,785.00 | $2,124.52 |
| 83 | PRC flar end sec 36 (54213681) | EACH | 4 | $4,000.00 | $2,520.00 | $2,637.80 |
| 84 | PRC flar end sec 42 (54213687) | EACH | 1 | $5,800.00 | $3,255.00 | $3,430.07 |
| 85 | PRC flar end sec 48 (54213693) | EACH | 1 | $6,300.00 | $3,937.50 | $3,848.51 |
| 86 | PRC FL end S EQ RS 24 (54214509) | EACH | 2 | $3,455.00 | $1,785.00 | $2,230.52 |
| 87 | PRC FL end S EQ RS 27 (54214512) | EACH | 18 | $4,000.00 | $2,467.50 | $4,849.22 |
| 88 | R C pipe tee 60P 12R (54216264) | EACH | 1 | $6,500.00 | $7,350.00 | $8,883.36 |
| 89 | Metal FL end sec 12" (54262712) | EACH | 2 | $630.00 | $393.75 | $709.54 |
| 90 | Metal FL end sec 15" (54262715) | EACH | 24 | $675.00 | $425.25 | $717.90 |
| 91 | Metal FL end sec 18" (54262718) | EACH | 6 | $720.00 | $483.00 | $743.67 |
| 92 | Storm sew CL A 1 12 (550A0050) | LF | 1,154 | $115.00 | $95.55 | $143.34 |
| 93 | Storm sew CL A 1 15 (550A0070) | LF | 230 | $115.00 | $97.13 | $155.18 |
| 94 | Storm sew CL A 1 18 (550A0090) | LF | 445 | $125.00 | $105.00 | $153.51 |
| 95 | Storm sew CL A 1 30 (550A0140) | LF | 255 | $200.00 | $151.20 | $254.05 |
| 96 | Storm sew CL A 1 36 (550A0160) | LF | 22 | $310.00 | $241.50 | $290.74 |
| 97 | Storm sew CL A 1 42 (550A0180) | LF | 1,225 | $257.00 | $203.70 | $390.57 |
| 98 | Storm sew CL A 1 48 (550A0190) | LF | 53 | $388.00 | $252.00 | $459.44 |
| 99 | Storm sew CL A 1 60 (550A0210) | LF | 1,033 | $465.00 | $319.20 | $498.04 |
| 100 | Storm sewer rem 12 (55100500) | LF | 13 | $75.00 | $35.70 | $138.52 |
| 101 | Storm sewer rem 15 (55100700) | LF | 255 | $36.50 | $29.93 | $68.47 |
| 102 | Storm sewer rem 36 (55101600) | LF | 20 | $60.00 | $40.95 | $281.98 |
| 103 | Storm sewers JKD 42 (55201500) | LF | 137 | $2,225.00 | $3,406.80 | $3,700.00 |
| 104 | Contr low-streng matl (59300100) | CY | 841 | $138.00 | $207.90 | $139.52 |
| 105 | Man TA 4 dia T24F&G (60219540) | EACH | 6 | $4,250.00 | $6,536.25 | $6,953.24 |
| 106 | Man TA 6 dia T8G (60224005) | EACH | 1 | $8,150.00 | $10,133 | $9,622.52 |
| 107 | Man TA 7 dia T1F OL (60224445) | EACH | 2 | $13,800 | $14,280 | $15,687 |
| 108 | Man TA 8 dia T5F OL (60224451) | EACH | 1 | $18,500 | $19,950 | $35,273 |
| 109 | Man TA 8 dia T1F OL (60224457) | EACH | 3 | $17,600 | $19,793 | $34,590 |
| 110 | Man TA 9 dia T1F OL (60224470) | EACH | 1 | $26,000 | $29,505 | $41,619 |
| 111 | Man TA 9 dia T24F&G (60224476) | EACH | 2 | $26,000 | $29,610 | $43,407 |
| 112 | Inlets TB T1F OL (60240210) | EACH | 3 | $2,550.00 | $2,310.00 | $2,702.52 |
| 113 | Inlets TB T24F&G (60240328) | EACH | 22 | $2,605.00 | $7,008.75 | $4,368.08 |
| 114 | Man adjust (60255500) | EACH | 13 | $985.00 | $1,732.50 | $2,617.59 |
| 115 | Man reconst (60257900) | EACH | 3 | $1,450.00 | $2,205.00 | $5,237.47 |
| 116 | Remov manholes (60500040) | EACH | 2 | $850.00 | $1,050.00 | $777.92 |
| 117 | Remov inlets (60500060) | EACH | 3 | $450.00 | $630.00 | $777.92 |
| 118 | Comb CC&G TM4.24 (60608582) | LF | 10,247 | $47.00 | $66.72 | $53.89 |
| 119 | Explor trench 52 (61100500) | LF | 500 | $16.00 | $6.30 | $19.51 |
| 120 | Misc concrete (61100605) | CY | 2 | $1,800.00 | $530.25 | $2,500.00 |
| 121 | Storm sew prot A 6 (61101007) | LF | 150 | $66.00 | $32.55 | $50.00 |
| 122 | Storm sew prot A 8 (61101009) | LF | 150 | $74.00 | $37.80 | $50.00 |
| 123 | Storm sew prot A 10 (61101011) | LF | 150 | $75.00 | $45.15 | $50.00 |
| 124 | Storm sew prot A 12 (61101013) | LF | 150 | $75.00 | $44.10 | $50.00 |
| 125 | FLD tile jun vault 2D (61133100) | EACH | 4 | $1,600.00 | $1,260.00 | $2,917.59 |
| 126 | FLD tile jun vault 3D (61133200) | EACH | 4 | $2,650.00 | $3,150.00 | $3,140.77 |
| 127 | SPBGR TY A 6FT posts (63000001) | LF | 25 | $50.00 | $79.80 | $44.23 |
| 128 | Traf bar term T6B (63100089) | EACH | 2 | $7,500.00 | $5,958.75 | $7,731.54 |
| 129 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $5,250.00 | $4,830.00 | $5,397.69 |
| 130 | Guardrail remov (63200310) | LF | 492 | $10.00 | $17.33 | $50.00 |
| 131 | Non SPL waste disposl (66900200) | CY | 400 | $135.00 | $325.85 | $132.83 |
| 132 | Soil disposal analy (66900530) | EACH | 1 | $1,690.00 | $1,470.00 | $1,491.95 |
| 133 | Reg sub P-const plan (66901001) | LS | 1 | $2,650.00 | $2,310.00 | $2,344.51 |
| 134 | Reg sub F con report (66901003) | LS | 1 | $2,650.00 | $2,310.00 | $2,344.51 |
| 135 | Reg sub mon (66901006) | CAL DAY | 8 | $1,250.00 | $1,071.00 | $1,087.00 |
| 136 | Engr field office B (67000500) | CAL MO | 18 | $1,800.00 | $3,589.23 | $1,676.91 |
| 137 | Mobilization (67100100) | LS | 1 | $312,500 | $395,476 | $709,000 |
| 138 | Pavt MK blkout tape 4 (70107004) | LF | 250 | $3.00 | $2.10 | $7.71 |
| 139 | Pavt MK blkout tape 6 (70107006) | LF | 250 | $3.00 | $2.73 | $10.50 |
| 140 | Changeable message SN (70107025) | CAL DAY | 100 | $135.00 | $198.51 | $106.57 |
| 141 | Short term pavt mking (70300100) | LF | 400 | $2.00 | $1.94 | $0.78 |
| 142 | SHRT TRM pavt MK rem (70300150) | SF | 842 | $1.00 | $3.48 | $3.32 |
| 143 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,500 | $1.25 | $1.68 | $6.91 |
| 144 | Sign panel T1 (72000100) | SF | 173 | $42.00 | $38.85 | $40.50 |
| 145 | Terminal marker - DA (72501000) | EACH | 2 | $60.00 | $44.10 | $53.29 |
| 146 | Teles STL sin support (72800100) | LF | 306 | $33.00 | $13.39 | $31.97 |
| 147 | Mod ureth PM LTR-sym (78009000) | SF | 260 | $5.00 | $4.73 | $26.64 |
| 148 | Mod ureth PM line 4 (78009004) | LF | 23,385 | $1.00 | $0.87 | $0.53 |
| 149 | Mod ureth PM line 6 (78009006) | LF | 106 | $1.50 | $1.31 | $15.99 |
| 150 | Mod ureth PM line 12 (78009012) | LF | 82 | $3.00 | $2.63 | $21.31 |
| 151 | Mod ureth PM line 24 (78009024) | LF | 135 | $6.00 | $5.25 | $26.64 |
| 152 | Grdrail ref type A (78200005) | EACH | 8 | $12.00 | $12.60 | $10.66 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.