IDOT contract 72976 bid tabulation
Section 4DR-1. Let by Illinois DOT on September 19, 2025, Cass, District 06. 5 bids received; low bid $120,678 by CSD Environmental Services, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 16
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | CSD Environmental Services, Inc. | $120,678 | Low |
| 2 | Phoenix Corporation of the Quad Cities | $121,402 | +1.0% |
| 3 | Otto Baum Company, Inc. | $123,000 | +2.0% |
| 4 | G. M. Sipes Construction, Inc. | $154,000 | +28% |
| 5 | Rees Construction Company of Quincy | $202,447 | +68% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. CSD Environmental Services, Inc. | 2. Phoenix Corporation of the Quad Cities | 3. Otto Baum Company, Inc. | 4. G. M. Sipes Construction, Inc. | 5. Rees Construction Company of Quincy |
|---|---|---|---|---|---|---|---|---|
| 1 | Explor trench SPL (X2130010) | LF | 60 | $62.00 | $10.00 | $51.09 | $85.00 | $220.00 |
| 2 | Trench backfill (20800150) | CY | 37 | $61.00 | $91.00 | $227.17 | $75.00 | $122.00 |
| 3 | Aggregate-temp access (40201000) | TON | 25 | $67.00 | $125.00 | $77.74 | $60.00 | $78.00 |
| 4 | Paved SHLD removal (44004250) | SY | 13 | $126.00 | $130.00 | $121.47 | $50.00 | $88.00 |
| 5 | Pavt patch T2 15 (44200180) | SY | 38 | $400.00 | $700.00 | $693.98 | $975.00 | $685.00 |
| 6 | Aggregate SHLDS B (48101200) | TON | 4 | $308.00 | $100.00 | $292.32 | $150.00 | $275.00 |
| 7 | HMA shoulders 8 (48203029) | SY | 10 | $1,000.00 | $650.00 | $1,277.23 | $850.00 | $460.00 |
| 8 | Contr low-streng matl (59300100) | CY | 1.50 | $500.00 | $3,500.00 | $2,103.58 | $750.00 | $630.00 |
| 9 | Misc concrete (61100605) | CY | 3 | $500.00 | $2,150.00 | $2,077.52 | $1,250.00 | $938.00 |
| 10 | Storm sew prot A 12 (61101013) | LF | 110 | $220.00 | $190.00 | $173.47 | $95.00 | $585.00 |
| 11 | FLD tile jun vault 3D (61133200) | EACH | 3 | $2,700.00 | $5,000.00 | $3,050.04 | $5,000.00 | $4,800.00 |
| 12 | Storm sewer spec 12 (61140200) | LF | 40 | $225.00 | $180.00 | $116.57 | $125.00 | $285.00 |
| 13 | Mobilization (67100100) | LS | 1 | $6,114.00 | $12,000 | $21,984 | $7,500.00 | $38,000 |
| 14 | Traf cont-prot 701201 (70100450) | LS | 1 | $16,096 | $9,460.00 | $383.17 | $50,000 | $10,000 |
| 15 | Traf cont-prot 701306 (70100460) | LS | 1 | $16,096 | $360.00 | $383.17 | $0.01 | $5,000.00 |
| 16 | Changeable message SN (70107025) | CAL DAY | 20 | $155.00 | $125.00 | $133.05 | $250.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.