Rees Construction Company of Quincy: IDOT bid record
Rees Construction Company of Quincy submitted 22 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 18 SEP 2026, and was the low bidder on 6 of them (27%). When it was not low, its total sat a median +49% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $8,145,216
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 5 | 1 | 20% |
| 2022 | 4 | 1 | 25% |
| 2023 | 1 | 0 | 0% |
| 2024 | 4 | 1 | 25% |
| 2025 | 5 | 2 | 40% |
| 2026 | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 5 | 5 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 5 | 5 (100%) | $0.80 | $0.80 |
| Perimeter eros bar | 28000400 | LF | 7 | 3 (43%) | $4.89 | $3.50 |
| Teles STL sin support | 72800100 | LF | 5 | 3 (60%) | $33.00 | $19.50 |
| Comb curb gutter rem | 44000500 | LF | 8 | 2 (25%) | $19.00 | $11.61 |
| Nitrogen fert nutr | 25000400 | LB | 7 | 2 (29%) | $10.00 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 7 | 2 (29%) | $10.00 | $3.00 |
| Drive pavement rem | 44000200 | SY | 7 | 2 (29%) | $22.00 | $20.00 |
| Trench backfill | 20800150 | CY | 7 | 2 (29%) | $74.00 | $55.00 |
| Phosphorus fert nutr | 25000500 | LB | 7 | 2 (29%) | $10.00 | $3.00 |
| Detectable warnings | 42400800 | SF | 9 | 1 (11%) | $58.00 | $37.00 |
| Inlet & pipe protect | 28000500 | EACH | 9 | 1 (11%) | $250.00 | $200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Laverdiere Construction, Inc. | 12 | 7 of 12 |
| County Contractors, Inc. | 9 | 6 of 9 |
| Phoenix Corporation of the Quad Cities | 6 | 5 of 6 |
| Otto Baum Company, Inc. | 6 | 5 of 6 |
| K. E. Vas Company | 5 | 3 of 5 |
| Hood Construction Group Midwest | 4 | 1 of 4 |
| Freesen, a div of UCM, Inc. | 3 | 2 of 3 |
| Sangamo Construction Company | 3 | 3 of 3 |
| T.M.F. Construction Company | 2 | 0 of 2 |
| Scruggs Machinery Equipment Construction Commodity Co. | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 72E88 | District 06 | Section 10DR | 1 of 6 | $81,487 | Low, 2.0% under the second |
| 27 FEB 2026 | 93852 | District 06 | Rushville, section 14-00019-00-FP | 2 of 3 | $1,699,492 | +36% |
| 16 JAN 2026 | 72913 | District 06 | Section (69VBR)I | 8 of 8 | $123,000 | +383% |
| 07 NOV 2025 | 93847 | District 06 | Pittsfield, section 24-00037-00-RS | 1 of 2 | $5,451,649 | Low, 29% under the second |
| 19 SEP 2025 | 72976 | District 06 | Section 4DR-1 | 5 of 5 | $202,447 | +68% |
| 13 JUN 2025 | 72346 | District 06 | Section 1-7B(BDR,BRR) | 1 of 3 | $552,332 | Low, 7.0% under the second |
| 13 JUN 2025 | 93832 | District 06 | Auburn, section 22-00019-00-SW | 3 of 3 | $388,504 | +74% |
| 17 JAN 2025 | 93825 | District 06 | Project Number: 0L5Z-449 / /, section 21-00056-01-SC | 3 of 3 | $416,533 | +13% |
| 20 SEP 2024 | 72627 | District 06 | Section 18DR-1 | 4 of 5 | $98,632 | +60% |
| 14 JUN 2024 | 72911 | District 06 | Section (116B-1)BDR | 3 of 5 | $122,631 | +27% |
| 14 JUN 2024 | 93819 | District 06 | Beardstown, section 21-00080-00-SW | 1 of 2 | $857,080 | Low, 2.0% under the second |
| 14 JUN 2024 | 93820 | District 06 | New Berlin, section 22-00001-00-SW | 4 of 4 | $494,564 | +55% |
| 04 AUG 2023 | 72N39 | District 06 | Section (10B-1)BRR | 4 of 4 | $325,509 | +154% |
| 05 AUG 2022 | 72011 | District 06 | Section 10(B-1,B-5)SCR | 4 of 5 | $126,236 | +28% |
| 05 AUG 2022 | 93737 | District 06 | Havana, section 17-00037-00-SW | 3 of 3 | $1,099,475 | +84% |
| 17 JUN 2022 | 72M72 | District 06 | Section D6 | 1 of 3 | $303,142 | Low, 20% under the second |
| 11 MAR 2022 | 93779 | District 06 | Mt. Sterling, section 16-00017-02-RS | 2 of 4 | $2,250,007 | +9.0% |
| 05 NOV 2021 | 72M94 | District 06 | Section 2(B-1,B-2)BDR | 7 of 7 | $314,046 | +125% |
| 05 NOV 2021 | 93740 | District 06 | Project Number: 3W9P-740 / /, section 15-00127-00-RS | 3 of 3 | $1,632,514 | +11% |
| 17 SEP 2021 | 72N00 | District 06 | Section MG-JACKSONVILLE | 2 of 4 | $148,738 | +15% |
| 17 SEP 2021 | 72N01 | District 06 | Section MG-RUSHVILLE | 4 of 6 | $192,489 | +49% |
| 05 MAR 2021 | 93758 | District 06 | Quincy, section 17-00329-00-RS | 1 of 1 | $899,527 | Low |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.