IDOT contract 93825 bid tabulation
Project Number: 0L5Z-449 / /, section 21-00056-01-SC. Let by Illinois DOT on January 17, 2025, Scott, District 06. 3 bids received; low bid $369,091 by K. E. Vas Company.
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 22
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K. E. Vas Company | $369,091 | Low |
| 2 | Illinois Valley Paving, a div of UCM, Inc. | $391,568 | +6.0% |
| 3 | Rees Construction Company of Quincy | $416,533 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K. E. Vas Company | 2. Illinois Valley Paving, a div of UCM, Inc. | 3. Rees Construction Company of Quincy |
|---|---|---|---|---|---|---|
| 1 | Bit matl PR CT (LR403200) | TON | 6 | $1,325.00 | $1,321.95 | $1,388.04 |
| 2 | Bit matls C&S CT (LR403400) | TON | 23 | $1,015.00 | $1,011.66 | $1,062.24 |
| 3 | Cover coat agg (LR403500) | TON | 136 | $45.00 | $40.79 | $42.82 |
| 4 | Seal coat agg (LR403600) | TON | 68 | $65.00 | $64.40 | $67.62 |
| 5 | Seeding CL 2 SPL (X2501000) | ACRE | 2 | $6,000.00 | $6,163.50 | $6,850.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $10,000 | $5,670.00 | $8,500.00 |
| 7 | Construction layout (Z0013798) | LS | 1 | $10,000 | $2,928.62 | $5,200.00 |
| 8 | Earth excavation (20200100) | CY | 1,214 | $20.00 | $22.20 | $32.00 |
| 9 | Furnished excavation (20400800) | CY | 2,437 | $28.00 | $30.73 | $34.00 |
| 10 | Trench backfill (20800150) | CY | 108 | $40.00 | $99.02 | $74.00 |
| 11 | Temp eros contr seed (28000250) | LB | 178 | $5.00 | $4.73 | $5.18 |
| 12 | Temp ditch checks (28000305) | LF | 220 | $10.00 | $9.71 | $10.64 |
| 13 | Perimeter eros bar (28000400) | LF | 130 | $5.00 | $4.46 | $4.89 |
| 14 | Inlet & pipe protect (28000500) | EACH | 4 | $100.00 | $94.50 | $105.00 |
| 15 | Agg base cse A 10 (35100900) | SY | 5,438 | $18.00 | $18.85 | $17.00 |
| 16 | Agg surf cse A 8 (40200700) | SY | 20 | $20.00 | $49.95 | $52.00 |
| 17 | Aggregate SHLDS A 6 (48100500) | SY | 1,914 | $12.00 | $10.06 | $15.00 |
| 18 | Pipe culvert remov (50105220) | LF | 98 | $10.00 | $37.14 | $22.00 |
| 19 | P cul CL A 1 24 (542A0229) | LF | 148 | $154.00 | $246.50 | $120.00 |
| 20 | P cul CL A 2 24 (542A1069) | LF | 64 | $154.00 | $174.09 | $132.00 |
| 21 | PRC flar end sec 24 (54213669) | EACH | 8 | $1,800.00 | $2,870.64 | $2,600.00 |
| 22 | Mobilization (67100100) | LS | 1 | $25,000 | $16,057 | $40,575 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.