IDOT contract 93847 bid tabulation

Pittsfield, section 24-00037-00-RS. Let by Illinois DOT on November 7, 2025, Pike, District 06. 2 bids received; low bid $5,451,649 by Rees Construction Company of Quincy.

Owner
Illinois DOT
Letting
07 NOV 2025
Pay items
124
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rees Construction Company of Quincy$5,451,649Low
2Hood Construction Group Midwest$7,038,260+29%
IDOT contract 93847: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rees Construction Company of Quincy2. Hood Construction Group Midwest
1T-acer sacr GM 2-1/2 (A2001820)EACH1$682.50$1,725.00
2T-carp carol 2-1/2 (A2002520)EACH2$682.50$1,725.00
3T-taxodi dis SB 3 (A2007724)EACH2$735.00$1,725.00
4P PL ornament T gal P (K0012990)UNIT0.78$315.00$300.00
5P PL prairie TY gal P (K0013020)UNIT0.84$315.00$300.00
6Street clock (XX008870)EACH1$23,489$16,000
7Landscaping planter (X0325495)EACH15$1,700.00$817.00
8Ornam light unit comp (X0326654)EACH25$8,211.00$9,500.00
9Abandon exist utls (X0327547)LS1$45,000$69,000
10Trash receptacles (X0327997)EACH5$2,100.00$2,067.00
11Luminaire replacement SPL (X1400403)EACH13$2,226.00$2,500.00
12Lighting assembly SPL (X1400431)EACH11$17,889$17,600
13Stamp col PCC SDWLK 5 (X1700067)SF7,556$33.00$29.00
14Topsoil F & P SPL (X2110100)CY276$60.00$163.00
15Temp access- priv ent (X4021000)EACH60$675.00$568.00
16Temp access- com ent (X4022000)EACH13$1,100.00$718.00
17Retaining wall SPL (X5220090)SF88$153.00$322.00
18Water main encasememt (X5610020)LF162$168.00$350.00
19Water main abandon (X5610675)EACH1$28,000$10,939
20WM line stop 6 (X5610746)EACH6$7,800.00$12,000
21WM line stop 8 (X5610748)EACH4$8,800.00$14,000
22Fire hydrant complete (X5640175)EACH5$7,800.00$4,810.00
23Conc curb TB SPL (X6061005)LF36$100.00$72.00
24Ornamental fence (X6640618)LF192$147.00$204.00
25Traf cont & prot SPL (X7010216)LS1$65,000$175,000
26Teles STL sin sup SPL (X7280105)LF441$60.00$55.00
27Decorative sign post (X7290004)EACH7$7,100.10$5,600.00
28Light controller SPL (X8250505)EACH1$19,110$19,700
29Conc FDN SPL (X8780105)EACH1$1,995.00$2,335.00
30Benches (Z0003850)EACH6$2,400.00$2,487.00
31Bicycle racks (Z0003855)EACH2$1,000.00$1,362.00
32Concrete steps (Z0012450)CY8.50$7,800.00$2,335.00
33Construction layout (Z0013798)LS1$27,000$114,000
34Storm sew WM req 12 (Z0056608)LF1,585$175.00$196.00
35Trainees (Z0076600)HR2,000$0.80$0.80
36Trainees TPG (Z0076604)HR2,000$15.00$15.00
37Trench backfill (20800150)CY625$88.00$84.00
38Seeding CL 1B (25000115)ACRE0.25$13,650$55,000
39Nitrogen fert nutr (25000400)LB23$10.50$10.00
40Phosphorus fert nutr (25000500)LB23$10.50$10.00
41Potassium fert nutr (25000600)LB23$10.50$10.00
42Erosion contr blanket (25100630)SY1,210$4.46$8.00
43Temp eros contr seed (28000250)LB25$10.50$17.00
44Perimeter eros bar (28000400)LF1,200$4.46$5.00
45Inlet & pipe protect (28000500)EACH24$262.50$215.00
46PCC bse cse 8 (35300300)SY2,966$145.00$146.00
47Preparation of base (35800100)SY4,101$10.00$10.00
48Agg base repair (35800200)TON1,389$39.00$64.00
49Bit matls tack CT (40600290)LB7,975$0.95$3.00
50Temporary ramp (40600990)SY216$166.78$22.00
51HMA BC IL-9.5FG N50 (40602965)TON1,290$166.78$195.00
52HMA SC IL-9.5 C N50 (40604050)TON993$180.14$200.00
53Protective coat (42001300)SY4,856$5.00$3.00
54PCC driveway pavt 8 (42300400)SY291$158.00$192.00
55PC conc sidewalk 4 (42400100)SF30,530$18.00$25.00
56Detectable warnings (42400800)SF393$70.00$71.00
57Pavement rem (44000100)SY5,644$22.00$21.00
58HMA surf rem 1 3/4 (44000156)SY8,555$8.29$10.00
59Drive pavement rem (44000200)SY125$18.00$14.00
60Comb curb gutter rem (44000500)LF1,974$16.00$14.00
61Sidewalk rem (44000600)SF29,229$4.00$7.00
62Pavt patch T1 8 (44200089)SY5$180.00$402.00
63Pavt patch T2 8 (44200094)SY153$170.00$376.00
64Pavt patch T3 8 (44200099)SY41$170.00$342.00
65Pavt patch T4 8 (44200101)SY188$165.00$340.00
66Pipe handrail (50901760)LF261$132.30$297.00
67Storm sewer rem 8 (55100300)LF26$19.00$60.00
68Storm sewer rem 10 (55100400)LF383$19.00$60.00
69Storm sewer rem 12 (55100500)LF448$19.00$60.00
70Water main 8 (56100700)LF2,070$178.00$354.00
71Water valves 8 (56105000)EACH11$3,900.00$4,463.00
72Tap valve & sleeve 6 (56108800)EACH1$8,800.00$11,000
73Tap valve & sleeve 10 (56109000)EACH1$12,000$15,000
74Water serv line 1 (56200300)LF654$260.00$120.00
75Water serv line 1 1/2 (56200500)LF254$340.00$140.00
76Water serv line 2 (56200700)LF86$300.00$160.00
77Adj san sewer 8 less (56300100)LF100$115.00$300.00
78Adj san sewer over 8 (56300200)LF100$120.00$365.00
79Fire hydnts to BE rem (56400500)EACH5$800.00$2,700.00
80Dom met VLTS (56500500)EACH15$600.00$4,030.00
81Man TA 4 dia T1F CL (60218400)EACH4$6,800.00$6,385.00
82Man TA 4 dia T3F&G (60218500)EACH2$7,000.00$6,453.00
83Inlets TA T1F OL (60234200)EACH1$3,200.00$2,570.00
84Inlets TA T3F&G (60235700)EACH16$3,400.00$2,570.00
85Inlets TB T3F&G (60240220)EACH5$4,000.00$3,223.00
86Man adjust (60255500)EACH3$900.00$1,016.00
87Remov manholes (60500040)EACH2$800.00$788.00
88Remov inlets (60500060)EACH6$800.00$788.00
89Comb CC&G TB6.18 (60604400)LF4,084$46.00$65.00
90Storm sewer spec 4 (61139800)LF100$90.00$89.00
91Storm sewer spec 6 (61139900)LF100$100.00$102.00
92Non SPL waste disposl (66900200)CY7$440.00$500.00
93Soil disposal analy (66900530)EACH1$1,540.00$1,725.00
94Reg sub P-const plan (66901001)LS1$2,420.00$2,875.00
95Reg sub F con report (66901003)LS1$2,420.00$2,875.00
96Reg sub mon (66901006)CAL DAY2$1,018.00$1,150.00
97Mobilization (67100100)LS1$156,506$543,000
98Short term pavt mking (70300100)LF1,428$1.62$3.00
99SHRT TRM pavt MK rem (70300150)SF476$5.00$3.00
100Temp PVT MK LTR & sym paint (70300211)SF296$3.15$3.20
101Temp PVT MK line 5 - paint (70300231)LF7,457$1.01$1.05
102Temp PVT MK line 6 - paint (70300241)LF459$1.21$1.30
103Temp PVT MK line 8 - paint (70300251)LF4,000$1.62$1.70
104Temp PVT MK line 12 - paint (70300261)LF3,078$2.57$2.70
105Temp PVT MK line 24 - paint (70300281)LF89$4.98$5.25
106Sign panel T1 (72000100)SF308$48.00$55.00
107Mod ureth PM LTR-sym (78009000)SF296$10.50$11.00
108Mod ureth PM line 5 (78009005)LF7,457$4.26$4.50
109Mod ureth PM line 6 (78009006)LF459$5.12$5.30
110Mod ureth PM line 8 (78009008)LF4,000$6.82$7.00
111Mod ureth PM line 12 (78009012)LF3,078$10.23$11.00
112Mod ureth PM line 24 (78009024)LF89$20.47$21.00
113PVT MKG rem WTR blast (78300202)SF11,777$2.20$2.50
114Elect serv install (80400100)EACH1$4,410.00$2,500.00
115Undrgrd C PVC 1 1/4 (81028330)LF627$17.01$22.00
116Undrgrd C PVC 1 1/2 (81028340)LF5,346$18.37$19.00
117Undrgrd C PVC 2 (81028350)LF100$42.00$27.00
118Undrgrd C PVC 4 (81028390)LF100$52.50$31.00
119Handhole C conc (81400730)EACH8$3,360.00$1,400.00
120EC C XLP use 1C 6 (81702130)LF14,378$2.52$2.50
121EC C XLP use 1C 4 (81702140)LF4,056$3.41$3.30
122EC C XLP use 1C 2 (81702150)LF116$6.30$5.00
123Rem LT unit salv (84200500)EACH3$840.00$1,000.00
124Rem LT U no salv (84200600)EACH18$955.50$1,000.00
IDOT contract 93847: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy