IDOT contract 72J76 bid tabulation
Section (11BR,10B-1,10B-5)BDR. Let by Illinois DOT on June 12, 2026, Schuyler, District 06. 3 bids received; low bid $1,870,400 by Otto Baum Company, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 62
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Otto Baum Company, Inc. | $1,870,400 | Low |
| 2 | Freesen, a div of UCM, Inc. | $1,924,874 | +3.0% |
| 3 | County Contractors, Inc. | $1,960,022 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Otto Baum Company, Inc. | 2. Freesen, a div of UCM, Inc. | 3. County Contractors, Inc. |
|---|---|---|---|---|---|---|
| 1 | Exc & GR EX SHLD SPL (X2020060) | UNIT | 14 | $2,911.76 | $5,289.16 | $1,100.00 |
| 2 | HMA surf rem var DP (X4401198) | SY | 426 | $15.80 | $97.15 | $20.00 |
| 3 | BR deck grooving long (X5030250) | SY | 1,926 | $16.05 | $13.58 | $11.00 |
| 4 | Drainage scuppr DS-33 (X5230190) | EACH | 6 | $5,884.64 | $3,870.11 | $4,545.00 |
| 5 | Pipe drain removal (X6010003) | LF | 50 | $31.31 | $31.18 | $30.00 |
| 6 | Fill inlets temporary (X6050222) | EACH | 2 | $3,403.98 | $1,710.96 | $3,575.00 |
| 7 | Width restrict sign (X7200201) | LS | 1 | $2,632.72 | $2,625.00 | $4,375.00 |
| 8 | BR approach SHLD rem (Z0001495) | SY | 81 | $131.55 | $132.20 | $105.00 |
| 9 | Polymer concrete (Z0041895) | CF | 5.90 | $1,655.16 | $1,441.78 | $1,300.00 |
| 10 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 11 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 12 | Stone riprap CL A3 (28100105) | SY | 34 | $66.48 | $56.29 | $73.00 |
| 13 | Filter fabric (28200200) | SY | 34 | $18.30 | $11.03 | $8.00 |
| 14 | Bit matls tack CT (40600290) | LB | 1,165 | $12.64 | $3.50 | $13.00 |
| 15 | HMA surf rem butt JT (40600982) | SY | 623 | $15.80 | $23.27 | $16.00 |
| 16 | Temporary ramp (40600990) | SY | 506 | $46.48 | $23.59 | $28.00 |
| 17 | HMA SC IL-9.5 C N50 (40604050) | TON | 254 | $311.71 | $308.94 | $315.00 |
| 18 | HMA surf rem 1 3/4 (44000156) | SY | 1,968 | $15.80 | $23.26 | $16.00 |
| 19 | Paved SHLD removal (44004250) | SY | 12 | $139.22 | $133.86 | $125.00 |
| 20 | Dowel bars 5/8 (44201292) | EACH | 68 | $55.20 | $49.37 | $46.00 |
| 21 | Agg wedge SHLD type B (48102100) | TON | 64 | $82.82 | $219.83 | $98.00 |
| 22 | HMA shoulders 8 (48203029) | SY | 636 | $126.37 | $157.36 | $127.00 |
| 23 | HMA shoulders (48203100) | TON | 80 | $446.51 | $498.68 | $448.00 |
| 24 | PCC shoulders 10 (48300500) | SY | 89.60 | $200.25 | $219.97 | $260.00 |
| 25 | Conc rem (50102400) | CY | 5.50 | $5,278.74 | $3,834.10 | $4,600.00 |
| 26 | Conc sup-STR (50300255) | CY | 5.90 | $6,155.83 | $4,745.28 | $6,750.00 |
| 27 | Protective coat (50300300) | SY | 2,816 | $2.87 | $3.93 | $7.60 |
| 28 | Reinf bars, epoxy CTD (50800205) | LB | 14,670 | $2.16 | $2.01 | $3.35 |
| 29 | Bar splicers (50800515) | EACH | 12 | $73.54 | $58.94 | $110.00 |
| 30 | Pref JT strip seal (52000110) | LF | 69 | $251.21 | $327.70 | $350.00 |
| 31 | Deck slab rep (FD-T2) (53016002) | SY | 20 | $1,194.89 | $1,256.60 | $1,350.00 |
| 32 | BR deck scar 3/4 (53101002) | SY | 2,483 | $80.38 | $78.53 | $88.00 |
| 33 | BR DK mic C ovl 2 1/2 (53101609) | SY | 2,545 | $125.83 | $157.45 | $145.00 |
| 34 | Metal FL end sec 12" (54262712) | EACH | 2 | $756.49 | $401.45 | $610.00 |
| 35 | Pipe drains 12 (60100945) | LF | 10 | $95.06 | $46.77 | $165.00 |
| 36 | TY G inlet box 610001 (61000335) | EACH | 2 | $4,453.97 | $4,008.08 | $3,930.00 |
| 37 | SPBGR TY A 6FT posts (63000001) | LF | 1,525 | $36.12 | $36.02 | $36.00 |
| 38 | Traf bar term T6 (63100085) | EACH | 12 | $4,670.44 | $4,656.75 | $4,680.00 |
| 39 | TR bar TRM T1 SPL tan (63100167) | EACH | 12 | $3,985.93 | $3,974.25 | $3,995.00 |
| 40 | Guardrail remov (63200310) | LF | 2,177 | $6.55 | $5.97 | $6.00 |
| 41 | Conc SHLD curb (66201120) | LF | 20 | $103.58 | $87.34 | $115.00 |
| 42 | Engr field office A (67000400) | CAL MO | 12 | $1,333.56 | $4,043.66 | $2,750.00 |
| 43 | Mobilization (67100100) | LS | 1 | $226,541 | $40,463 | $116,500 |
| 44 | Traf cont-prot 701321 (70100405) | EACH | 3 | $7,055.68 | $22,217 | $26,500 |
| 45 | Traf cont-prot 701201 (70100450) | LS | 1 | $105.31 | $105.00 | $2,500.00 |
| 46 | Traf cont-prot 701326 (70100500) | LS | 1 | $8,108.76 | $8,085.00 | $5,500.00 |
| 47 | TR cont surveillance (70103815) | CAL DAY | 14 | $347.62 | $1.69 | $350.00 |
| 48 | Temp BR traf signals (70106500) | EACH | 3 | $23,209 | $26,347 | $24,000 |
| 49 | Temp rumble strips (70106700) | EACH | 18 | $822.05 | $1,006.70 | $975.00 |
| 50 | Pavt MK blkout tape 5 (70107005) | LF | 2,252.50 | $1.97 | $4.82 | $3.00 |
| 51 | Changeable message SN (70107025) | CAL DAY | 360 | $73.72 | $73.50 | $95.00 |
| 52 | Short term pavt mking (70300100) | LF | 341 | $1.64 | $1.59 | $2.25 |
| 53 | SHRT TRM pavt MK rem (70300150) | SF | 57 | $4.81 | $2.09 | $15.00 |
| 54 | Temp conc barrier (70400100) | LF | 1,522.50 | $35.55 | $38.35 | $44.00 |
| 55 | Rel temp conc barrier (70400200) | LF | 1,522.50 | $8.26 | $3.98 | $10.50 |
| 56 | Imp attn temp FRN TL3 (70600260) | EACH | 6 | $9,100.00 | $8,477.51 | $11,500 |
| 57 | Imp attn rel FRN TL3 (70600332) | EACH | 8 | $500.00 | $4,015.21 | $3,500.00 |
| 58 | Terminal marker - DA (72501000) | EACH | 12 | $52.65 | $52.50 | $53.00 |
| 59 | Mod ureth PM line 5 (78009005) | LF | 5,406 | $3.90 | $2.42 | $3.25 |
| 60 | Raised refl pavt MKR (78100100) | EACH | 19 | $444.96 | $236.25 | $237.50 |
| 61 | Grdrail ref type A (78200005) | EACH | 40 | $10.53 | $10.50 | $10.50 |
| 62 | Raised ref PVT MK rem (78300200) | EACH | 19 | $43.31 | $16.27 | $21.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.