IDOT contract 68F45 bid tabulation
. Let by Illinois DOT on November 7, 2025, Woodford, District 04. 2 bids received; low bid $5,074,396 by R. A. Cullinan and Son, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 134
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $5,074,396 | Low |
| 2 | Otto Baum Company, Inc. | $6,170,000 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R. A. Cullinan and Son, a div of UCM, Inc. | 2. Otto Baum Company, Inc. |
|---|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $3,235.41 | $8,800.00 |
| 2 | R R FL beacon A comp (X1400326) | EACH | 6 | $21,687 | $20,460 |
| 3 | Exc & GR EX SHLD SPL (X2020060) | UNIT | 44 | $1,470.04 | $1,470.18 |
| 4 | PC conc sidewalk 6 SP (X4240440) | SF | 1,746 | $14.02 | $45.48 |
| 5 | Water valves adj SPL (X5619210) | EACH | 11 | $4,184.74 | $2,225.03 |
| 6 | Inlets TG-1 DBL (X6020080) | EACH | 1 | $5,062.51 | $14,450 |
| 7 | Inlets TG-1 (X6020082) | EACH | 4 | $4,079.99 | $7,230.51 |
| 8 | Inlets TG-1 SPL (X6021065) | EACH | 3 | $3,927.62 | $7,128.55 |
| 9 | Inl-MN G-1 4D (X6021814) | EACH | 6 | $4,624.89 | $10,726 |
| 10 | Inl-MN G-1 5D (X6021815) | EACH | 2 | $6,992.19 | $13,786 |
| 11 | Inl-MN G-1 4D SPL (X6021824) | EACH | 1 | $5,072.26 | $10,994 |
| 12 | Inl-MN G-1 5D SPL (X6021825) | EACH | 5 | $9,513.08 | $20,648 |
| 13 | Man adjust SPL (X6025600) | EACH | 5 | $7,551.07 | $3,541.37 |
| 14 | Inlets adjust SPL (X6026200) | EACH | 8 | $1,219.00 | $4,153.70 |
| 15 | Remov FR & GR SPL (X6050500) | EACH | 1 | $1,036.15 | $939.23 |
| 16 | Detour signing (X7200203) | LS | 1 | $14,045 | $13,527 |
| 17 | Wood pole removal (X8301801) | EACH | 1 | $2,270.39 | $2,141.88 |
| 18 | Video veh det sys 3 cam (X8891011) | EACH | 1 | $46,576 | $43,939 |
| 19 | Video veh det sys 4 cam (X8891013) | EACH | 1 | $51,548 | $48,630 |
| 20 | Bicycle racks (Z0003855) | EACH | 1 | $3,047.50 | $16,050 |
| 21 | Conc step remov (Z0012455) | EACH | 11 | $182.85 | $619.60 |
| 22 | Construction layout (Z0013798) | LS | 1 | $112,148 | $10,000 |
| 23 | TS batt backup system (Z0033068) | EACH | 1 | $13,696 | $12,920 |
| 24 | SS 1 wat MN 12 (Z0056648) | LF | 4 | $249.90 | $1,060.43 |
| 25 | SS 1 wat MN 15 (Z0056650) | LF | 133 | $118.24 | $318.23 |
| 26 | SS 1 wat MN 18 (Z0056652) | LF | 37 | $145.06 | $323.03 |
| 27 | SS 2 wat MN 36 (Z0056678) | LF | 69 | $477.85 | $803.86 |
| 28 | Trainees (Z0076600) | HR | 2,500 | $0.80 | $0.80 |
| 29 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 | $15.00 |
| 30 | Tree remov 6-15 (20100110) | UNIT | 8 | $159.09 | $1,192.39 |
| 31 | Earth excavation (20200100) | CY | 35 | $48.76 | $993.94 |
| 32 | Furnished excavation (20400800) | CY | 15 | $79.24 | $861.51 |
| 33 | Trench backfill (20800150) | CY | 433 | $48.76 | $154.40 |
| 34 | Topsoil F & P 4 (21101615) | SY | 1,049 | $13.62 | $16.39 |
| 35 | Grading & shap ditch (21400100) | LF | 1,100 | $14.63 | $48.38 |
| 36 | Nitrogen fert nutr (25000400) | LB | 13 | $7.95 | $7.66 |
| 37 | Phosphorus fert nutr (25000500) | LB | 13 | $7.95 | $7.66 |
| 38 | Potassium fert nutr (25000600) | LB | 13 | $7.95 | $7.66 |
| 39 | Sodding salt tolerant (25200110) | SY | 1,049 | $23.85 | $22.97 |
| 40 | Supple watering (25200200) | UNIT | 9.40 | $174.90 | $168.45 |
| 41 | Temp ditch checks (28000305) | LF | 20 | $42.67 | $37.66 |
| 42 | Inlet & pipe protect (28000500) | EACH | 22 | $304.75 | $186.59 |
| 43 | Stone riprap CL B3 (28100225) | TON | 96 | $81.67 | $136.46 |
| 44 | Stone riprap CL B4 (28100227) | TON | 6 | $81.67 | $678.74 |
| 45 | Stone dump rip CL B5 (28100835) | TON | 2 | $82.89 | $1,149.06 |
| 46 | Filter fabric (28200200) | SY | 9 | $24.38 | $31.95 |
| 47 | Sub gran mat A 4 (31100300) | SY | 1,433 | $10.97 | $22.79 |
| 48 | Sub gran mat B 4 (31101200) | SY | 442 | $10.97 | $23.04 |
| 49 | Sub gran mat B 10 (31101800) | SY | 17 | $19.50 | $111.85 |
| 50 | PCC bse cse 10 (35300500) | SY | 1,381 | $97.52 | $102.24 |
| 51 | P bit matls tack CT (40600295) | LB | 57,878 | $2.11 | $2.11 |
| 52 | Matl transfer device (40600405) | TON | 7,164 | $3.92 | $3.92 |
| 53 | HMA surf rem butt JT (40600982) | SY | 4,180 | $22.24 | $22.24 |
| 54 | Temporary ramp (40600990) | SY | 654 | $50.60 | $50.61 |
| 55 | P HMA BC IL-9.5 N50 (40603205) | TON | 3,482 | $168.67 | $168.68 |
| 56 | P HMA SC 9.5FG C N50 (40604100) | TON | 372 | $226.24 | $226.26 |
| 57 | P HMA SC IL-9.5 D N70 (40604162) | TON | 3,858 | $160.43 | $160.45 |
| 58 | Incidental HMA surf (40800050) | TON | 319 | $430.37 | $430.41 |
| 59 | PCC driveway pavt 8 (42300400) | SY | 395 | $103.62 | $169.07 |
| 60 | PC conc sidewalk 4 (42400100) | SF | 7,637 | $12.80 | $16.02 |
| 61 | Detectable warnings (42400800) | SF | 441 | $35.97 | $0.01 |
| 62 | Pavement rem (44000100) | SY | 1,688 | $24.38 | $35.84 |
| 63 | HMA surf rem 2 (44000157) | SY | 3,304 | $12.21 | $12.21 |
| 64 | HMA surf rem 3 1/2 (44000163) | SY | 8,035 | $10.24 | $10.24 |
| 65 | HMA surf rem 3 3/4 (44000164) | SY | 28,143 | $8.14 | $8.14 |
| 66 | Drive pavement rem (44000200) | SY | 403 | $24.38 | $43.69 |
| 67 | Comb curb gutter rem (44000500) | LF | 2,213 | $8.53 | $7.12 |
| 68 | Sidewalk rem (44000600) | SF | 8,984 | $1.83 | $1.84 |
| 69 | CL D patch T2 14 (44201815) | SY | 314 | $408.53 | $408.53 |
| 70 | CL D patch T3 14 (44201819) | SY | 110 | $397.51 | $397.51 |
| 71 | CL D patch T4 14 (44201821) | SY | 347 | $387.74 | $387.74 |
| 72 | Aggregate SHLDS B (48101200) | TON | 117 | $211.91 | $110.06 |
| 73 | HMA shoulders 8 (48203029) | SY | 1,871 | $95.87 | $95.88 |
| 74 | Conc headwall removal (50104400) | EACH | 1 | $2,438.00 | $309.80 |
| 75 | Pipe culvert remov (50105220) | LF | 54 | $30.48 | $30.67 |
| 76 | Pipe handrail (50901760) | LF | 235 | $174.37 | $359.61 |
| 77 | P cul CL A 1 15 (542A0220) | LF | 123 | $93.86 | $123.33 |
| 78 | PRC flar end sec 15 (54213660) | EACH | 3 | $1,980.88 | $1,632.07 |
| 79 | Storm sew CL A 1 15 (550A0070) | LF | 80 | $108.49 | $182.09 |
| 80 | Storm sew CL A 1 36 (550A0160) | LF | 49 | $248.68 | $324.11 |
| 81 | Storm sew CL A 2 15 (550A0360) | LF | 26 | $108.49 | $217.88 |
| 82 | Storm sew CL A 2 18 (550A0380) | LF | 25 | $113.37 | $245.20 |
| 83 | Storm sew CL A 2 36 (550A0450) | LF | 257 | $351.07 | $287.48 |
| 84 | Storm sewer rem 12 (55100500) | LF | 540 | $48.76 | $47.47 |
| 85 | Storm sewer rem 15 (55100700) | LF | 37 | $60.95 | $73.00 |
| 86 | Man frames adjust (60300350) | EACH | 2 | $1,462.80 | $3,265.46 |
| 87 | Remov manholes (60500040) | EACH | 2 | $2,072.30 | $908.66 |
| 88 | Remov inlets (60500060) | EACH | 5 | $1,462.80 | $908.66 |
| 89 | Comb CC&G TB6.12 (60603800) | LF | 787 | $67.05 | $133.00 |
| 90 | Comb CC&G TB6.18 (60604400) | LF | 35 | $69.48 | $193.97 |
| 91 | Comb CC&G TY B-6.24 (60605000) | LF | 1,591 | $71.92 | $139.05 |
| 92 | Conc med TSB6.12 (60619600) | SF | 390 | $18.29 | $40.26 |
| 93 | Pipe culv cleaned 18 (60920018) | LF | 556 | $26.50 | $18.00 |
| 94 | Non SPL waste disposl (66900200) | CY | 515 | $146.28 | $81.59 |
| 95 | Soil disposal analy (66900530) | EACH | 4 | $1,219.00 | $1,020.93 |
| 96 | Reg sub P-const plan (66901001) | LS | 1 | $3,657.00 | $3,062.77 |
| 97 | Reg sub F con report (66901003) | LS | 1 | $1,219.00 | $1,020.92 |
| 98 | Reg sub mon (66901006) | CAL DAY | 23 | $1,219.00 | $1,020.92 |
| 99 | Engr field office A (67000400) | CAL MO | 7 | $4,096.13 | $1,735.97 |
| 100 | Mobilization (67100100) | LS | 1 | $216,631 | $949,605 |
| 101 | TR cont & prot 701501 (70102620) | LS | 1 | $289,900 | $30,270 |
| 102 | TR cont & prot 701502 (70102622) | LS | 1 | $12,190 | $0.01 |
| 103 | TR cont & prot 701701 (70102635) | LS | 1 | $12,190 | $0.01 |
| 104 | TR cont & prot 701801 (70102640) | LS | 1 | $6,519.00 | $408.37 |
| 105 | TR cont surveillance (70103815) | CAL DAY | 10 | $1,590.00 | $309.40 |
| 106 | Changeable message SN (70107025) | CAL DAY | 28 | $159.00 | $153.14 |
| 107 | Short term pavt mking (70300100) | LF | 3,582 | $3.16 | $3.90 |
| 108 | SHRT TRM pavt MK rem (70300150) | SF | 917 | $3.05 | $7.12 |
| 109 | Sign panel T1 (72000100) | SF | 117 | $34.45 | $33.18 |
| 110 | Remov sin pan assy TA (72400100) | EACH | 2 | $106.00 | $169.72 |
| 111 | Rem & rel sign panel asmbly TA (72400205) | EACH | 1 | $265.00 | $255.23 |
| 112 | Reloc sin pan assy TA (72400500) | EACH | 3 | $206.70 | $199.08 |
| 113 | Teles STL sin support (72800100) | LF | 185 | $29.68 | $28.59 |
| 114 | Base tel STL sin supp (73100100) | EACH | 14 | $556.50 | $535.99 |
| 115 | PT PVT MK LTRS & symb (78001100) | SF | 6 | $10.60 | $13.27 |
| 116 | Paint PVT MK line 4 (78001110) | LF | 460 | $1.78 | $2.04 |
| 117 | Paint PVT MK line 6 (78001130) | LF | 418 | $2.67 | $3.06 |
| 118 | Paint PVT MK line 24 (78001180) | LF | 148 | $10.60 | $13.27 |
| 119 | Mod ureth PM LTR-sym (78009000) | SF | 464 | $4.51 | $6.13 |
| 120 | Mod ureth PM line 4 (78009004) | LF | 15,823 | $0.76 | $1.02 |
| 121 | Mod ureth PM line 6 (78009006) | LF | 14,655 | $1.14 | $1.23 |
| 122 | Mod ureth PM line 8 (78009008) | LF | 1,201 | $1.54 | $1.53 |
| 123 | Mod ureth PM line 12 (78009012) | LF | 634 | $2.33 | $3.06 |
| 124 | Mod ureth PM line 24 (78009024) | LF | 759 | $4.58 | $5.10 |
| 125 | GRV RCSD PM LTR & sym (78011000) | SF | 501 | $4.45 | $5.10 |
| 126 | GRV RCSD PVT MRKG 5 (78011025) | LF | 15,156 | $0.25 | $0.61 |
| 127 | GRV RCSD PVT MRKG 7 (78011035) | LF | 14,655 | $0.38 | $0.77 |
| 128 | GRV RCSD PVT MRKG 9 (78011045) | LF | 1,038 | $0.51 | $1.02 |
| 129 | GRV RCSD PVT MRKG 13 (78011065) | LF | 505 | $2.28 | $3.06 |
| 130 | GRV RCSD PVT MRKG 25 (78011125) | LF | 728 | $4.51 | $5.10 |
| 131 | Raised refl pavt MKR (78100100) | EACH | 248 | $37.04 | $69.42 |
| 132 | Curb reflectors (78200020) | EACH | 10 | $21.20 | $337.68 |
| 133 | Raised ref PVT MK rem (78300200) | EACH | 139 | $65.53 | $234.90 |
| 134 | PVT MKG rem WTR blast (78300202) | SF | 570 | $10.60 | $155.56 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.