IDOT contract 72511 bid tabulation
Section (14B-2)BDR. Let by Illinois DOT on April 24, 2026, Pike, District 06. 3 bids received; low bid $130,630 by County Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 14
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | County Contractors, Inc. | $130,630 | Low |
| 2 | Freesen, a div of UCM, Inc. | $131,128 | 0.0% |
| 3 | Otto Baum Company, Inc. | $169,000 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. County Contractors, Inc. | 2. Freesen, a div of UCM, Inc. | 3. Otto Baum Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Width restrict sign (X7200201) | LS | 1 | $3,500.00 | $1,974.00 | $2,018.28 |
| 2 | Appr slab repair (PD) (Z0001800) | SY | 12 | $610.00 | $1,027.43 | $1,500.00 |
| 3 | Conc curb repair (Z0012500) | LF | 39 | $110.00 | $247.42 | $253.83 |
| 4 | JT sealing (patches) (Z0032500) | LF | 1,000 | $5.00 | $3.41 | $3.84 |
| 5 | Protective coat (50300300) | SY | 78 | $20.00 | $13.39 | $33.07 |
| 6 | Deck slab rep (part) (53016000) | SY | 51 | $610.00 | $687.78 | $600.00 |
| 7 | Deck slab rep (FD-T2) (53016002) | SY | 15 | $1,250.00 | $1,127.61 | $2,000.00 |
| 8 | Mobilization (67100100) | LS | 1 | $6,750.00 | $10,040 | $32,322 |
| 9 | Traf cont-prot 701316 (70100100) | EACH | 1 | $21,000 | $16,631 | $4,589.43 |
| 10 | Temp BR traf signals (70106500) | EACH | 1 | $13,000 | $8,135.45 | $19,338 |
| 11 | Temp rumble strips (70106700) | EACH | 6 | $950.00 | $816.05 | $478.04 |
| 12 | Pavt MK blkout tape 5 (70107005) | LF | 900 | $5.00 | $3.76 | $3.86 |
| 13 | Changeable message SN (70107025) | CAL DAY | 90 | $75.00 | $78.75 | $80.52 |
| 14 | SHRT TRM pavt MK rem (70300150) | SF | 400 | $3.50 | $1.39 | $5.56 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.