IDOT contract 46918 bid tabulation

Section M-W. Let by Illinois DOT on June 12, 2026, Marshall, District 04. 3 bids received; low bid $923,507 by Phoenix Corporation of the Quad Cities.

Owner
Illinois DOT
Letting
12 JUN 2026
Pay items
60
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Phoenix Corporation of the Quad Cities$923,507Low
2Otto Baum Company, Inc.$1,069,500+16%
3Stark Excavating, Inc.$1,356,536+47%
IDOT contract 46918: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Phoenix Corporation of the Quad Cities2. Otto Baum Company, Inc.3. Stark Excavating, Inc.
1Rem rein parking BLKS (X0300019)EACH47$120.00$112.47$94.00
2Rem EX parking blocks (X0301339)EACH15$41.00$88.98$120.00
3Prec conc park block (X0301430)EACH28$140.00$135.83$130.00
4Washout basin (X0326806)LS1$1,500.00$4,295.92$2,700.00
5Bit surf treatmnt A3 (X1500006)SY12,997$13.25$21.84$21.00
6Earth excavation SPL (X2020410)CY351$51.50$92.41$51.00
7Minor sign complete (X2600016)EACH30$250.00$795.00$980.00
8Perimeter eros bar SP (X2800400)LF702$18.00$14.57$6.50
9Bit matls FS (X4060107)LB5,850$1.65$4.39$4.30
10Fill EX septic tank (X6050218)EACH3$2,700.00$4,793.83$3,000.00
11Traf cont & prot SPL (X7010216)LS1$8,100.00$9,456.22$10,000
12BLDG remov no 1 (Z0007601)LS1$1,850.00$2,685.20$5,400.00
13BLDG remov no 2 (Z0007602)LS1$1,850.00$2,685.20$3,800.00
14Construction layout (Z0013798)LS1$10,500$7,051.14$19,500
15Trainees TPG (Z0076604)HR500$15.00$15.00$15.00
16Tree remov 6-15 (20100110)UNIT60$65.00$61.93$69.00
17Tree remov over 15 (20100210)UNIT221$81.00$95.27$76.00
18Trench backfill (20800150)CY5$126.00$145.64$33.00
19Geotech fab F/GR stab (21001000)SY311$2.00$6.04$5.60
20Topsoil F & P var DP (21101600)SY830$8.00$20.50$165.00
21Grading & shap ditch (21400100)LF510$17.00$15.06$20.00
22Seeding CL 1B (25000115)ACRE0.66$18,000$9,554.12$15,000
23Nitrogen fert nutr (25000400)LB60$10.00$13.06$3.10
24Potassium fert nutr (25000600)LB60$10.00$13.06$3.10
25Mulch method 1 (25100105)ACRE0.66$8,000.00$9,554.12$4,700.00
26Temp eros contr seed (28000250)LB34$5.00$5.04$5.10
27Temp ditch checks (28000305)LF24$23.00$31.01$12.00
28Inlet & pipe protect (28000500)EACH5$250.00$177.60$170.00
29Stone dump rip CL A3 (28100705)SY1,140$65.00$30.46$35.00
30Filter fabric (28200200)SY1,502$2.00$3.70$2.90
31Sub gran mat A 4 (31100300)SY444$14.50$13.46$42.00
32Sub gran mat C (31101900)TON371$75.00$64.08$60.00
33Agg base cse A 6 (35100500)SY11$53.25$65.99$31.00
34Agg base cse A 8 (35100700)SY167$44.50$32.92$51.00
35Preparation of base (35800100)SY11,975$4.50$3.06$3.00
36Agg base repair (35800200)TON216$48.00$54.54$55.00
37Agg surf course TY B (40200800)TON2,699$56.50$70.89$84.00
38PCC PVT 7 (42000200)SY409$102.50$108.12$180.00
39PC conc sidewalk 5 (42400200)SF966$17.50$16.82$29.00
40Pavement rem (44000100)SY67$14.00$38.26$32.00
41Sidewalk rem (44000600)SF1,281$4.00$2.34$5.00
42Pipe culvert remov (50105220)LF107$35.00$55.94$27.00
43Cofferdam typ 2 loc 1 (50201121)EACH1$22,500$0.11$0.01
44Cofferdam typ 2 loc 2 (50201122)EACH1$22,500$0.11$0.01
45P cul CL A 2 eqrs 60 (542A8245)LF40$400.00$529.33$770.00
46P cul CL C 1 12 (542C0217)LF70$46.00$40.43$64.00
47PRC flar end sec 24 (54213669)EACH1$1,500.00$1,715.43$2,000.00
48PRC FL end S EQ RS 60 (54214545)EACH2$10,500$9,596.19$12,000
49Metal FL end sec 12" (54262712)EACH2$400.00$750.92$1,400.00
50Contr low-streng matl (59300100)CY30$350.00$150.97$110.00
51SPBGR TY A 6FT posts (63000001)LF202$60.50$63.14$70.00
52Guardrail remov (63200310)LF85$7.00$10.13$52.00
53Engr field office B (67000500)CAL MO3$3,200.00$1,700.00$2,100.00
54Mobilization (67100100)LS1$52,000$98,137$170,000
55Sign panel T1 (72000100)SF28.40$47.00$52.24$51.00
56Remov sign panel T1 (72400310)SF4.50$18.00$184.54$29.00
57Reloc sign panel T1 (72400710)SF0.25$50.00$329.76$1,000.00
58Wood sin support (73000100)LF148$55.00$37.61$37.00
59PT PVT MK LTRS & symb (78001100)SF22.40$40.00$10.45$10.00
60Paint PVT MK line 4 (78001110)LF1,906$4.00$1.57$1.50
IDOT contract 46918: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy