IDOT contract 68H60 bid tabulation
Section (35)N-2. Let by Illinois DOT on September 18, 2026, Tazewell, District 04. 4 bids received; low bid $649,800 by Otto Baum Company, Inc..
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 69
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Otto Baum Company, Inc. | $649,800 | Low |
| 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $736,180 | +13% |
| 3 | Knapp Concrete Contractors, Inc. | $801,370 | +23% |
| 4 | Illinois Civil Contractors, Inc. | $822,460 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Otto Baum Company, Inc. | 2. R. A. Cullinan and Son, a div of UCM, Inc. | 3. Knapp Concrete Contractors, Inc. | 4. Illinois Civil Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Solar-power FB as CMP (X0326899) | EACH | 4 | $6,425.53 | $6,393.18 | $6,527.00 | $6,791.20 |
| 2 | SLR-PWR FB as CMP DA (X1400175) | EACH | 4 | $7,496.45 | $7,615.46 | $7,768.20 | $8,089.59 |
| 3 | Traf cont & prot SPL (X7010216) | LS | 1 | $21,761 | $18,666 | $18,725 | $15,225 |
| 4 | Construction layout (Z0013798) | LS | 1 | $7,394.22 | $5,542.77 | $15,622 | $16,284 |
| 5 | Earth excavation (20200100) | CY | 1,288 | $36.65 | $55.17 | $57.50 | $74.84 |
| 6 | Trench backfill (20800150) | CY | 15 | $166.14 | $48.82 | $125.05 | $50.57 |
| 7 | Topsoil F & P 4 (21101615) | SY | 1,106 | $13.14 | $10.37 | $11.17 | $18.48 |
| 8 | Mowing (25000750) | ACRE | 4 | $197.99 | $393.75 | $535.00 | $2,133.28 |
| 9 | Erosion contr blanket (25100630) | SY | 1,106 | $4.23 | $5.25 | $2.20 | $2.81 |
| 10 | Temp eros contr seed (28000250) | LB | 23 | $7.48 | $15.20 | $18.32 | $7.09 |
| 11 | Temp ditch checks (28000305) | LF | 40 | $21.50 | $33.68 | $21.53 | $11.22 |
| 12 | Perimeter eros bar (28000400) | LF | 747 | $3.13 | $9.09 | $4.54 | $7.93 |
| 13 | Inlet & pipe protect (28000500) | EACH | 3 | $140.28 | $300.04 | $386.50 | $301.09 |
| 14 | Stone riprap CL A3 (28100205) | TON | 15 | $141.57 | $382.30 | $93.35 | $153.98 |
| 15 | Agg subgrade impr 12 (30300112) | SY | 935 | $39.10 | $52.26 | $33.65 | $40.31 |
| 16 | Sub gran mat C 4 1/2 (31102150) | SY | 309 | $16.91 | $37.89 | $14.77 | $15.08 |
| 17 | HMA BC wid 9 (35600712) | SY | 626 | $111.24 | $122.34 | $111.28 | $115.85 |
| 18 | Agg surf course TY B (40200800) | TON | 49 | $59.66 | $122.92 | $57.99 | $87.50 |
| 19 | Bit matls PR CT (40600275) | LB | 2,312 | $1.29 | $0.71 | $1.28 | $1.34 |
| 20 | P bit matls tack CT (40600295) | LB | 1,714 | $1.29 | $2.50 | $1.28 | $1.34 |
| 21 | P HMA BC IL-9.5 N50 (40603205) | TON | 70 | $283.79 | $282.24 | $283.55 | $295.57 |
| 22 | P HMA SC "D" N50 (40603535) | TON | 53 | $283.79 | $324.24 | $283.55 | $295.57 |
| 23 | Incidental HMA surf (40800050) | TON | 20 | $283.79 | $380.16 | $283.55 | $295.57 |
| 24 | Pavement rem (44000100) | SY | 20 | $138.96 | $114.15 | $46.00 | $91.63 |
| 25 | Drive pavement rem (44000200) | SY | 11 | $128.08 | $121.06 | $57.50 | $142.26 |
| 26 | Paved SHLD removal (44004250) | SY | 171 | $51.65 | $67.82 | $57.50 | $52.95 |
| 27 | CL D patch T4 9 (44201759) | SY | 42 | $390.64 | $297.56 | $343.59 | $418.20 |
| 28 | Agg wedge SHLD type B (48102100) | TON | 46 | $80.92 | $129.37 | $68.34 | $101.70 |
| 29 | HMA shoulders 8 (48203029) | SY | 275 | $107.09 | $139.79 | $170.25 | $111.54 |
| 30 | Pipe culvert remov (50105220) | LF | 100 | $25.91 | $38.89 | $40.25 | $41.62 |
| 31 | P cul CL A 1 eqrs 15 (542A5470) | LF | 140 | $161.45 | $139.11 | $144.70 | $163.55 |
| 32 | P cul CL D 1 eqrs 15 (542D5470) | LF | 40 | $61.09 | $152.21 | $112.60 | $137.66 |
| 33 | End sec eqv R-S 15 (54214290) | EACH | 4 | $1,918.96 | $1,722.72 | $2,346.21 | $2,267.37 |
| 34 | Metal FL ES EQ RS 15" (54262815) | EACH | 2 | $884.13 | $862.60 | $579.05 | $2,269.40 |
| 35 | Fur erect row markers (66600105) | EACH | 11 | $1,016.28 | $364.93 | $374.50 | $519.66 |
| 36 | Engr field office B (67000500) | CAL MO | 6 | $2,107.74 | $2,849.72 | $3,745.00 | $2,692.66 |
| 37 | Mobilization (67100100) | LS | 1 | $39,876 | $65,081 | $21,744 | $41,123 |
| 38 | Traf cont-prot 701326 (70100500) | LS | 1 | $1,070.92 | $3,386.25 | $13,662 | $29,106 |
| 39 | TR cont surveillance (70103815) | CAL DAY | 30 | $291.02 | $0.01 | $2,300.00 | $569.03 |
| 40 | Temp rumble strips (70106700) | EACH | 4 | $963.83 | $1,002.75 | $1,998.00 | $1,806.90 |
| 41 | Changeable message SN (70107025) | CAL DAY | 116 | $32.13 | $72.45 | $160.50 | $139.42 |
| 42 | Short term pavt mking (70300100) | LF | 210 | $3.15 | $0.01 | $6.42 | $4.86 |
| 43 | SHRT TRM pavt MK rem (70300150) | SF | 66.10 | $4.66 | $0.01 | $10.70 | $15.37 |
| 44 | Temp PVT MK line 4 - paint (70300221) | LF | 962 | $1.23 | $0.01 | $2.14 | $1.65 |
| 45 | Temp PVT MK line 6 - paint (70300241) | LF | 1,065 | $1.34 | $0.01 | $3.21 | $2.48 |
| 46 | Temp PVT MK line 24 - paint (70300281) | LF | 92 | $10.71 | $0.01 | $10.70 | $10.04 |
| 47 | Sign panel T1 (72000100) | SF | 96 | $37.48 | $69.91 | $129.19 | $62.46 |
| 48 | Remov sin pan assy TB (72400200) | EACH | 4 | $214.18 | $1,046.55 | $1,066.79 | $190.51 |
| 49 | Wood sin support (73000100) | LF | 224 | $64.26 | $43.79 | $44.94 | $87.00 |
| 50 | Mod ureth PM line 4 (78009004) | LF | 962 | $3.43 | $3.36 | $4.28 | $5.00 |
| 51 | Mod ureth PM line 6 (78009006) | LF | 1,065 | $4.93 | $4.83 | $6.42 | $7.50 |
| 52 | Mod ureth PM line 24 (78009024) | LF | 92 | $16.71 | $16.38 | $32.10 | $30.12 |
| 53 | GRV RCSD PVT MRKG 5 (78011025) | LF | 962 | $1.07 | $1.05 | $5.35 | $4.74 |
| 54 | GRV RCSD PVT MRKG 7 (78011035) | LF | 1,065 | $1.71 | $1.68 | $7.49 | $7.12 |
| 55 | GRV RCSD PVT MRKG 25 (78011125) | LF | 92 | $4.18 | $4.10 | $32.10 | $13.38 |
| 56 | PVT MKG rem WTR blast (78300202) | SF | 229 | $20.78 | $20.37 | $38.52 | $29.00 |
| 57 | Elect serv install (80400100) | EACH | 1 | $10,709 | $9,082.24 | $9,255.50 | $9,647.68 |
| 58 | Undrgrd C galvs 1 1/2 (81028190) | LF | 30 | $26.77 | $47.96 | $49.22 | $50.95 |
| 59 | Undrgrd C PVC 4 (81028390) | LF | 70 | $85.67 | $85.19 | $87.74 | $90.49 |
| 60 | Undrgrd C CNC 1 1/4 (81028730) | LF | 100 | $10.71 | $23.02 | $23.54 | $24.45 |
| 61 | UD 4#8#8GXLPUSE 1 1/4 (81603096) | LF | 110 | $16.06 | $23.91 | $24.61 | $25.40 |
| 62 | EC C XLP use 1C 4 (81702140) | LF | 300 | $19.81 | $5.00 | $5.35 | $5.31 |
| 63 | Lum LED rdwy H (82110008) | EACH | 2 | $1,070.93 | $1,164.42 | $1,187.70 | $1,236.92 |
| 64 | LT cont PM 240V 60 (82500310) | EACH | 1 | $10,174 | $11,215 | $11,428 | $11,913 |
| 65 | Elcbl C signal 14 5C (87301245) | LF | 250 | $3.21 | $3.66 | $3.75 | $3.89 |
| 66 | STL comb maa&P 58 (87703020) | EACH | 1 | $45,889 | $41,455 | $42,800 | $44,036 |
| 67 | Conc FDN TY E 42D (87800420) | LF | 21 | $856.74 | $1,151.69 | $1,177.00 | $1,223.39 |
| 68 | SH P LED 4F 1S mam (88040410) | EACH | 1 | $2,088.30 | $1,785.30 | $1,819.00 | $1,896.45 |
| 69 | TS backplate (88200100) | EACH | 4 | $396.24 | $275.13 | $281.41 | $292.26 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.