IDOT contract 68J46 bid tabulation
Section 116N,TS-1. Let by Illinois DOT on February 27, 2026, Peoria, District 04. 4 bids received; low bid $749,500 by Otto Baum Company, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 76
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Otto Baum Company, Inc. | $749,500 | Low |
| 2 | Gensini Excavating, Inc. | $759,806 | +1.0% |
| 3 | Illinois Civil Contractors, Inc. | $856,937 | +14% |
| 4 | R. A. Cullinan and Son, a div of UCM, Inc. | $1,063,024 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Otto Baum Company, Inc. | 2. Gensini Excavating, Inc. | 3. Illinois Civil Contractors, Inc. | 4. R. A. Cullinan and Son, a div of UCM, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Conc median surf rem (X4402020) | SF | 459 | $2.67 | $3.24 | $9.12 | $3.24 |
| 2 | Conc gutter SPL (X6062400) | LF | 42 | $116.68 | $55.08 | $138.69 | $211.50 |
| 3 | Mod EX contr & cab (X8950114) | EACH | 1 | $7,896.78 | $8,426.65 | $8,735.62 | $8,302.80 |
| 4 | Construction layout (Z0013798) | LS | 1 | $9,677.44 | $10,256 | $5,786.71 | $13,883 |
| 5 | Earth excavation (20200100) | CY | 722 | $41.73 | $32.10 | $56.39 | $101.07 |
| 6 | Topsoil F & P 4 (21101615) | SY | 221 | $20.66 | $21.81 | $33.73 | $28.00 |
| 7 | Mowing (25000750) | ACRE | 6 | $10.00 | $2,332.69 | $1,377.47 | $495.00 |
| 8 | Erosion contr blanket (25100630) | SY | 221 | $3.92 | $8.15 | $3.69 | $5.32 |
| 9 | Temp eros contr seed (28000250) | LB | 5 | $33.97 | $37.68 | $7.08 | $28.53 |
| 10 | Temp ditch checks (28000305) | LF | 10 | $45.11 | $14.71 | $11.27 | $53.74 |
| 11 | Perimeter eros bar (28000400) | LF | 399 | $5.21 | $4.28 | $7.22 | $13.12 |
| 12 | Inlet & pipe protect (28000500) | EACH | 2 | $128.31 | $259.13 | $307.51 | $716.31 |
| 13 | Sub gran mat B (31101000) | TON | 767 | $54.58 | $46.46 | $70.40 | $72.19 |
| 14 | PCC bse cse 7 3/4 (35300215) | SY | 304 | $74.98 | $125.28 | $70.13 | $119.07 |
| 15 | PCC bse cse 10 (35300500) | SY | 698 | $78.33 | $132.98 | $70.13 | $114.01 |
| 16 | P bit matls tack CT (40600295) | LB | 787 | $2.62 | $2.77 | $7.04 | $6.08 |
| 17 | Matl transfer device (40600405) | TON | 224.50 | $20.92 | $22.18 | $31.54 | $27.25 |
| 18 | P HMA BC IL-9.5 N70 (40603208) | TON | 112.30 | $251.09 | $266.10 | $392.25 | $338.92 |
| 19 | P HMA SC IL-9.5 D N70 (40604162) | TON | 112.30 | $251.09 | $266.10 | $392.25 | $338.92 |
| 20 | Pavement rem (44000100) | SY | 360 | $45.61 | $14.47 | $36.87 | $78.13 |
| 21 | Gutter rem (44000400) | LF | 43 | $27.03 | $7.44 | $20.57 | $34.59 |
| 22 | Comb curb gutter rem (44000500) | LF | 896 | $10.32 | $7.44 | $15.46 | $16.60 |
| 23 | Dowel bars 1 1/2 (44201299) | EACH | 558 | $22.42 | $16.63 | $31.61 | $14.55 |
| 24 | Tie bars 3/4 (44213204) | EACH | 315 | $18.47 | $11.09 | $22.36 | $35.93 |
| 25 | Class SI conc outlet (60600095) | CY | 2.10 | $1,360.84 | $1,172.48 | $2,693.44 | $2,163.97 |
| 26 | Comb CC&G TB6.06 (60603500) | LF | 443 | $67.78 | $50.87 | $108.94 | $206.22 |
| 27 | Comb CC&G TB6.12 (60603800) | LF | 343 | $76.42 | $53.91 | $90.69 | $222.35 |
| 28 | Comb CC&G TY B-6.24 (60605000) | LF | 98 | $103.29 | $60.02 | $121.07 | $225.63 |
| 29 | Conc median surf 4 (60618300) | SF | 471 | $11.82 | $16.36 | $10.65 | $22.79 |
| 30 | Engr field office B (67000500) | CAL MO | 4 | $1,750.00 | $3,326.31 | $2,486.82 | $4,204.49 |
| 31 | Mobilization (67100100) | LS | 1 | $89,272 | $55,503 | $51,416 | $59,393 |
| 32 | TR cont & prot 701602 (70102632) | LS | 1 | $15,618 | $35,000 | $15,022 | $18,207 |
| 33 | TR cont & prot 701701 (70102635) | LS | 1 | $4,737.59 | $3,159.99 | $3,298.43 | $3,135.00 |
| 34 | TR cont surveillance (70103815) | CAL DAY | 28 | $304.98 | $0.01 | $845.95 | $1,857.77 |
| 35 | Pavt MK blkout tape 8 (70107008) | LF | 84 | $10.46 | $5.27 | $5.50 | $5.23 |
| 36 | Changeable message SN (70107025) | CAL DAY | 21 | $68.00 | $138.60 | $144.67 | $137.50 |
| 37 | SHRT TRM pavt MK rem (70300150) | SF | 771 | $2.09 | $2.22 | $15.24 | $3.95 |
| 38 | Temp PVT MK LTR & sym paint (70300211) | SF | 374 | $5.23 | $3.88 | $4.05 | $3.85 |
| 39 | Temp PVT MK line 4 - paint (70300221) | LF | 3,758 | $0.52 | $0.43 | $0.45 | $0.43 |
| 40 | Temp PVT MK line 6 - paint (70300241) | LF | 6,921 | $1.05 | $0.64 | $0.67 | $0.64 |
| 41 | Temp PVT MK line 8 - paint (70300251) | LF | 3,653 | $1.57 | $0.86 | $0.90 | $0.86 |
| 42 | Temp PVT MK line 12 - paint (70300261) | LF | 1,247 | $2.09 | $1.29 | $1.34 | $1.28 |
| 43 | Temp PVT MK line 24 - paint (70300281) | LF | 181 | $5.23 | $4.44 | $4.63 | $4.40 |
| 44 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 16 | $33.48 | $11.37 | $11.86 | $11.28 |
| 45 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,099 | $1.67 | $1.77 | $1.85 | $1.76 |
| 46 | Sign panel T1 (72000100) | SF | 30 | $25.00 | $223.97 | $150.45 | $61.60 |
| 47 | Sign panel T2 (72000200) | SF | 10 | $62.77 | $52.48 | $43.98 | $41.80 |
| 48 | Wood sin support (73000100) | LF | 15 | $31.39 | $35.05 | $97.54 | $49.50 |
| 49 | Mod ureth PM LTR-sym (78009000) | SF | 374 | $8.37 | $4.99 | $5.21 | $4.95 |
| 50 | Mod ureth PM line 4 (78009004) | LF | 3,758 | $1.36 | $1.19 | $1.24 | $1.18 |
| 51 | Mod ureth PM line 6 (78009006) | LF | 6,921 | $2.09 | $1.77 | $1.85 | $1.76 |
| 52 | Mod ureth PM line 8 (78009008) | LF | 3,653 | $2.72 | $2.38 | $2.49 | $2.37 |
| 53 | Mod ureth PM line 12 (78009012) | LF | 1,247 | $5.23 | $3.56 | $3.72 | $3.53 |
| 54 | Mod ureth PM line 24 (78009024) | LF | 181 | $8.37 | $7.10 | $7.41 | $7.04 |
| 55 | GRV RCSD PM LTR & sym (78011000) | SF | 526 | $6.28 | $5.54 | $5.79 | $5.50 |
| 56 | GRV RCSD PVT MRKG 5 (78011025) | LF | 3,758 | $1.05 | $1.43 | $1.49 | $1.42 |
| 57 | GRV RCSD PVT MRKG 7 (78011035) | LF | 6,921 | $1.31 | $2.11 | $2.20 | $2.09 |
| 58 | GRV RCSD PVT MRKG 9 (78011045) | LF | 3,653 | $1.57 | $2.86 | $2.99 | $2.84 |
| 59 | GRV RCSD PVT MRKG 13 (78011065) | LF | 1,247 | $3.40 | $3.33 | $3.47 | $3.30 |
| 60 | GRV RCSD PVT MRKG 25 (78011125) | LF | 181 | $6.80 | $6.65 | $6.94 | $6.60 |
| 61 | Curb reflectors (78200020) | EACH | 58 | $15.69 | $23.28 | $24.30 | $23.10 |
| 62 | PVT MKG rem WTR blast (78300202) | SF | 87 | $104.62 | $63.03 | $65.79 | $62.54 |
| 63 | UD 2#8 #8G xlpuse 3/4 (81603000) | LF | 325 | $99.39 | $105.33 | $109.95 | $104.50 |
| 64 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 1 | $1,569.31 | $1,663.15 | $1,736.01 | $1,650.00 |
| 65 | Bkwy dev cou SS SCRN (83800650) | EACH | 4 | $266.78 | $282.74 | $295.12 | $280.50 |
| 66 | Rem pole FDN (84200804) | EACH | 1 | $3,661.73 | $3,880.69 | $4,050.70 | $3,850.00 |
| 67 | Reloc EX LT unit (84400105) | EACH | 1 | $2,092.42 | $2,217.54 | $2,314.69 | $2,200.00 |
| 68 | Elcbl C signal 14 5C (87301245) | LF | 2,516 | $11.51 | $12.20 | $12.73 | $12.10 |
| 69 | Elcbl C signal 14 7C (87301255) | LF | 1,874 | $14.65 | $15.52 | $16.20 | $15.40 |
| 70 | SH P LED 1F 3S BM (88040070) | EACH | 4 | $1,150.83 | $1,219.65 | $1,273.08 | $1,210.00 |
| 71 | SH P LED 1F 3S mam (88040090) | EACH | 8 | $1,150.83 | $1,219.65 | $1,273.08 | $1,210.00 |
| 72 | SH P LED 1F 4S BM (88040110) | EACH | 2 | $1,360.08 | $1,441.40 | $1,504.55 | $1,430.00 |
| 73 | SH P LED 1F 4S mam (88040120) | EACH | 2 | $1,360.08 | $1,441.40 | $1,504.55 | $1,430.00 |
| 74 | SH P LED 1F 5S BM (88040150) | EACH | 4 | $1,621.62 | $1,718.59 | $1,793.88 | $1,705.00 |
| 75 | TS backplate (88200100) | EACH | 20 | $392.33 | $415.79 | $434.00 | $412.50 |
| 76 | Remov EX TS equip (89502375) | EACH | 1 | $20,453 | $21,676 | $22,626 | $21,505 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.