IDOT contract 68B70 bid tabulation
Section (Y,72-6)TS. Let by Illinois DOT on August 1, 2025, Peoria, District 04. 3 bids received; low bid $1,750,000 by Otto Baum Company, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 110
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Otto Baum Company, Inc. | $1,750,000 | Low |
| 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $1,841,093 | +5.0% |
| 3 | Illinois Civil Contractors, Inc. | $2,166,876 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Otto Baum Company, Inc. | 2. R. A. Cullinan and Son, a div of UCM, Inc. | 3. Illinois Civil Contractors, Inc. |
|---|---|---|---|---|---|---|
| 1 | Recoverable delineatr (X2600002) | EACH | 12 | $230.02 | $247.50 | $246.37 |
| 2 | SS cleaned 15 (X5537900) | LF | 160 | $18.85 | $29.70 | $31.35 |
| 3 | Inlets TG-1 SPL (X6021065) | EACH | 3 | $6,379.52 | $10,619 | $5,375.22 |
| 4 | Delineator removal (X6350120) | EACH | 10 | $134.56 | $60.09 | $159.28 |
| 5 | Detour signing (X7200203) | LS | 1 | $18,861 | $20,295 | $19,158 |
| 6 | Confirmation beacon (X8870510) | EACH | 3 | $1,374.92 | $1,479.41 | $1,561.57 |
| 7 | Video veh det sys 3 cam (X8891011) | EACH | 1 | $37,847 | $40,724 | $42,986 |
| 8 | Construction layout (Z0013798) | LS | 1 | $17,354 | $17,949 | $21,016 |
| 9 | Earth excavation (20200100) | CY | 589 | $55.38 | $118.15 | $62.19 |
| 10 | Furnished excavation (20400800) | CY | 109 | $143.77 | $143.95 | $144.77 |
| 11 | Trench backfill (20800150) | CY | 8 | $143.09 | $157.77 | $53.66 |
| 12 | Topsoil F & P 4 (21101615) | SY | 2,151 | $14.71 | $13.15 | $13.88 |
| 13 | Seeding CL 1 (25000100) | ACRE | 0.25 | $10,223 | $16,500 | $17,416 |
| 14 | Nitrogen fert nutr (25000400) | LB | 31 | $10.22 | $8.25 | $8.71 |
| 15 | Phosphorus fert nutr (25000500) | LB | 31 | $10.22 | $8.25 | $8.71 |
| 16 | Potassium fert nutr (25000600) | LB | 31 | $10.22 | $8.25 | $8.71 |
| 17 | Mowing (25000750) | ACRE | 11.75 | $163.57 | $176.00 | $1,151.04 |
| 18 | Erosion contr blanket (25100630) | SY | 548 | $3.07 | $2.86 | $3.02 |
| 19 | Sodding salt tolerant (25200110) | SY | 1,602 | $18.40 | $21.45 | $22.64 |
| 20 | Supple watering (25200200) | UNIT | 72.10 | $204.46 | $159.50 | $168.36 |
| 21 | Temp eros contr seed (28000250) | LB | 31 | $6.20 | $8.65 | $5.81 |
| 22 | Temp ditch checks (28000305) | LF | 60 | $15.73 | $19.80 | $14.50 |
| 23 | Perimeter eros bar (28000400) | LF | 1,006 | $5.48 | $7.72 | $6.60 |
| 24 | Inlet & pipe protect (28000500) | EACH | 2 | $448.28 | $706.55 | $329.22 |
| 25 | Sub gran mat B (31101000) | TON | 1,319 | $47.36 | $76.83 | $68.26 |
| 26 | PCC bse cse 8 1/2 (35300310) | SY | 694 | $115.20 | $118.68 | $101.85 |
| 27 | PCC bse cse 11 (35300600) | SY | 230 | $134.16 | $120.15 | $118.47 |
| 28 | P bit matls tack CT (40600295) | LB | 9,564 | $1.53 | $3.75 | $4.35 |
| 29 | Matl transfer device (40600405) | TON | 1,185.70 | $18.40 | $14.14 | $16.42 |
| 30 | HMA surf rem butt JT (40600982) | SY | 230 | $78.72 | $19.54 | $22.69 |
| 31 | P HMA SC IL-9.5 C N70 (40604152) | TON | 177 | $270.91 | $244.80 | $284.23 |
| 32 | P HMA SC IL-9.5 D N70 (40604162) | TON | 512.40 | $205.00 | $197.63 | $229.47 |
| 33 | Pavement rem (44000100) | SY | 1,063 | $23.22 | $36.47 | $70.42 |
| 34 | HMA surf rem 1 1/2 (44000155) | SY | 8,784 | $7.67 | $9.89 | $11.48 |
| 35 | Comb curb gutter rem (44000500) | LF | 1,922 | $12.02 | $16.84 | $20.67 |
| 36 | Median removal (44003100) | SF | 640 | $2.86 | $14.65 | $9.58 |
| 37 | Paved SHLD removal (44004250) | SY | 585 | $26.30 | $26.34 | $37.42 |
| 38 | Dowel bars 1 1/2 (44201299) | EACH | 522 | $23.84 | $60.55 | $45.28 |
| 39 | CL D patch T3 12 (44201794) | SY | 17 | $880.40 | $908.96 | $810.72 |
| 40 | Tie bars 3/4 (44213204) | EACH | 622 | $20.27 | $53.63 | $27.47 |
| 41 | Aggregate SHLDS B (48101200) | TON | 97 | $109.39 | $173.42 | $106.41 |
| 42 | HMA shoulders 1 1/2 (48203003) | SY | 2,195 | $23.51 | $24.97 | $28.99 |
| 43 | HMA shoulders 8 (48203029) | SY | 696 | $102.23 | $97.70 | $113.44 |
| 44 | PRC flar end sec 15 (54213660) | EACH | 1 | $1,672.13 | $2,213.51 | $2,281.88 |
| 45 | Storm sew CL A 1 15 (550A0070) | LF | 53 | $178.25 | $227.86 | $145.35 |
| 46 | Remov inlets (60500060) | EACH | 1 | $674.43 | $1,035.48 | $2,289.41 |
| 47 | Comb CC&G TM4.24 (60608582) | LF | 1,825 | $107.90 | $51.02 | $67.94 |
| 48 | Comb CC&G TM6.06 (60608600) | LF | 15 | $233.31 | $189.79 | $189.78 |
| 49 | Comb CC&G TM6.24 (60610400) | LF | 16 | $233.29 | $196.79 | $178.90 |
| 50 | Conc median surf 4 (60618300) | SF | 118 | $15.53 | $48.45 | $19.17 |
| 51 | Conc med TSM4.24 (60622320) | SF | 150 | $27.76 | $89.36 | $27.15 |
| 52 | Conc med TSM6.24 (60623200) | SF | 89 | $40.78 | $96.86 | $24.45 |
| 53 | Fur erect drain MKRS (66700705) | EACH | 2 | $602.89 | $837.44 | $53.78 |
| 54 | Engr field office B (67000500) | CAL MO | 6 | $1,681.56 | $3,605.31 | $4,106.19 |
| 55 | Mobilization (67100100) | LS | 1 | $140,737 | $70,272 | $130,013 |
| 56 | Traf cont-prot 701421 (70100310) | LS | 1 | $1.02 | $1.10 | $1.16 |
| 57 | Traf cont-prot 701422 (70100315) | EACH | 2 | $10,990 | $11,825 | $14,804 |
| 58 | Traf cont-prot 701451 (70100820) | LS | 1 | $3,271.37 | $3,520.00 | $3,425.21 |
| 59 | Traf cont-prot 701456 (70100825) | LS | 1 | $1,942.37 | $2,090.00 | $5,753.20 |
| 60 | TR cont & prot 701701 (70102635) | LS | 1 | $2,555.75 | $2,750.00 | $4,272.81 |
| 61 | Changeable message SN (70107025) | CAL DAY | 28 | $102.23 | $110.00 | $110.30 |
| 62 | Short term pavt mking (70300100) | LF | 570 | $3.81 | $3.64 | $5.31 |
| 63 | SHRT TRM pavt MK rem (70300150) | SF | 961 | $2.80 | $5.07 | $16.23 |
| 64 | Temp PVT MK LTR & sym paint (70300211) | SF | 180 | $3.07 | $3.30 | $4.64 |
| 65 | Temp PVT MK line 6 - paint (70300241) | LF | 5,082 | $1.05 | $1.13 | $1.04 |
| 66 | Temp PVT MK line 8 - paint (70300251) | LF | 1,516 | $1.41 | $1.52 | $1.51 |
| 67 | Temp PVT MK line 12 - paint (70300261) | LF | 250 | $2.15 | $2.31 | $2.90 |
| 68 | Temp PVT MK line 24 - paint (70300281) | LF | 92 | $4.34 | $4.68 | $4.64 |
| 69 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,272 | $1.53 | $1.65 | $1.74 |
| 70 | Temp conc barrier (70400100) | LF | 2,425 | $33.22 | $38.37 | $115.12 |
| 71 | Pin temp conc barrier (70400125) | EACH | 132 | $20.45 | $81.40 | $102.17 |
| 72 | Rel temp conc barrier (70400200) | LF | 837.50 | $13.03 | $10.67 | $9.82 |
| 73 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $5,116.61 | $5,464.58 | $7,953.46 |
| 74 | Imp attn rel NRN TL3 (70600352) | EACH | 1 | $1,011.65 | $2,152.37 | $1,451.36 |
| 75 | Sign panel T1 (72000100) | SF | 152 | $53.33 | $57.38 | $53.51 |
| 76 | Remov sin pan assy TA (72400100) | EACH | 5 | $186.45 | $240.35 | $310.15 |
| 77 | Remov sin pan assy TB (72400200) | EACH | 3 | $186.45 | $200.29 | $387.69 |
| 78 | Teles STL sin support (72800100) | LF | 53 | $39.87 | $42.90 | $23.22 |
| 79 | Wood sin support (73000100) | LF | 133 | $40.89 | $55.45 | $83.63 |
| 80 | Mod ureth PM LTR-sym (78009000) | SF | 180 | $4.09 | $4.40 | $9.29 |
| 81 | Mod ureth PM line 6 (78009006) | LF | 5,082 | $2.02 | $2.18 | $2.21 |
| 82 | Mod ureth PM line 8 (78009008) | LF | 1,516 | $2.70 | $2.90 | $2.90 |
| 83 | Mod ureth PM line 12 (78009012) | LF | 250 | $4.05 | $4.36 | $4.64 |
| 84 | Mod ureth PM line 24 (78009024) | LF | 92 | $8.18 | $8.80 | $9.29 |
| 85 | GRV RCSD PM LTR & sym (78011000) | SF | 249 | $6.13 | $6.60 | $11.61 |
| 86 | GRV RCSD PVT MRKG 7 (78011035) | LF | 5,082 | $2.22 | $2.39 | $1.16 |
| 87 | GRV RCSD PVT MRKG 9 (78011045) | LF | 1,516 | $3.32 | $3.58 | $1.74 |
| 88 | GRV RCSD PVT MRKG 13 (78011065) | LF | 250 | $3.83 | $4.13 | $6.39 |
| 89 | GRV RCSD PVT MRKG 25 (78011125) | LF | 92 | $5.11 | $5.50 | $11.61 |
| 90 | Raised refl pavt MKR (78100100) | EACH | 45 | $101.21 | $108.90 | $203.19 |
| 91 | Curb reflectors (78200020) | EACH | 67 | $15.33 | $16.50 | $19.74 |
| 92 | Raised ref PVT MK rem (78300200) | EACH | 45 | $41.43 | $48.71 | $23.26 |
| 93 | Undrgrd C PVC 1 1/2 (81028340) | LF | 78 | $29.75 | $32.01 | $33.79 |
| 94 | Undrgrd C PVC 3 (81028370) | LF | 262 | $61.05 | $65.69 | $69.34 |
| 95 | Handhole PCC (81400700) | EACH | 2 | $3,999.19 | $4,303.14 | $4,542.11 |
| 96 | Elcbl C signal 14 3C (87301225) | LF | 651 | $3.23 | $3.48 | $3.67 |
| 97 | Elcbl C signal 14 5C (87301245) | LF | 1,304 | $3.91 | $4.20 | $4.44 |
| 98 | Elcbl C egrdc 6 1C (87301900) | LF | 395 | $6.70 | $7.21 | $7.61 |
| 99 | TS post galvs 15 (87502490) | EACH | 1 | $3,670.43 | $3,949.40 | $4,168.72 |
| 100 | S maa & P 55 (87700320) | EACH | 1 | $36,374 | $39,138 | $41,312 |
| 101 | S maa & P dma 44 & 50 (87702700) | EACH | 1 | $53,812 | $57,902 | $61,118 |
| 102 | Conc FDN TY A (87800100) | LF | 3 | $647.89 | $697.14 | $735.85 |
| 103 | Conc FDN TY E 36D (87800415) | LF | 31 | $1,384.26 | $1,489.47 | $1,572.18 |
| 104 | Drill EX handhole (87900200) | EACH | 2 | $1,019.75 | $1,097.25 | $1,158.19 |
| 105 | SH P LED 1F 3S BM (88040070) | EACH | 2 | $1,630.36 | $1,754.27 | $1,851.70 |
| 106 | SH P LED 1F 3S mam (88040090) | EACH | 7 | $1,523.54 | $1,639.33 | $1,730.37 |
| 107 | TS backplate ret-refl (88200510) | EACH | 9 | $436.67 | $469.85 | $495.95 |
| 108 | Reloc EX TS equip (89501250) | EACH | 1 | $7,105.07 | $7,645.08 | $8,069.64 |
| 109 | Remov EX TS equip (89502375) | EACH | 1 | $20,531 | $17,772 | $18,759 |
| 110 | Remov EX handhole (89502380) | EACH | 1 | $1,428.73 | $830.78 | $876.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.