IDOT letting results, March 10, 2023
134 contracts let by Illinois DOT on March 10, 2023, $267,891,059 in low bids, a median of 3 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 134
- Low bids, total
- $267,891,059
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 60Y72 | Section (145,146&146S-2)WRS&B-1 | District 01 | 3 | Judlau Contracting, Inc. | $57,274,935 | $57,342,464 | 0.0% | IDOT |
| 74212 | Section (18Z)R | District 07 | 2 | McCarthy Improvement Company | $21,800,000 | $24,651,309 | +13% | IDOT |
| 87800 | Project Number: Yjby-239 / /, section 19-00154-00-FP | District 03 | 3 | D. Construction, Inc. | $12,117,223 | $13,831,000 | +14% | IDOT |
| 74739 | Section 101RS-2 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $11,912,205 | IDOT | ||
| 64M40 | Section (3,4)RS-2 | District 02 | 2 | Rock Road Companies, Inc. | $9,575,729 | $10,568,896 | +10% | IDOT |
| 61H80 | Algonquin, section 17-00092-00-PV | District 01 | 3 | Benchmark Construction Co., Inc. | $8,448,000 | $9,154,962 | +8.0% | IDOT |
| 62R55 | Section FAI | District 01 | 5 | D. Construction, Inc. | $7,287,827 | $8,121,202 | +11% | IDOT |
| 74574 | Section 20RS-4, | District 07 | 1 | Howell Paving, Inc. | $6,973,340 | IDOT | ||
| 61H23 | Skokie, section 08-00279-00-FP | District 01 | 5 | Benchmark Construction Co., Inc. | $6,618,000 | $6,885,362 | +4.0% | IDOT |
| 61J15 | Vernon Hills, section 98-00026-02-WR | District 01 | 3 | Alliance Contractors, Inc. | $6,074,312 | $7,000,000 | +15% | IDOT |
| 72H41 | Section (E)RS1, | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $5,080,314 | IDOT | ||
| 74976 | Section (11,12)RS-1 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $4,183,455 | IDOT | ||
| 61H59 | Niles, section 13-00118-00-WR | District 01 | 2 | Alliance Contractors, Inc. | $3,923,898 | $4,088,824 | +4.0% | IDOT |
| 62N80 | Section 2021-048-RS | District 01 | 4 | Arrow Road Construction Co. | $3,921,219 | $4,258,882 | +9.0% | IDOT |
| 74547 | Section (4-2)RS-4,(5-2)RS-1 | District 07 | 2 | Ambraw Asphalt Materials, Inc. | $3,497,354 | $3,506,356 | 0.0% | IDOT |
| 62N85 | Section 2021-054-N&SW | District 01 | 3 | D. Construction, Inc. | $3,101,824 | $3,538,485 | +14% | IDOT |
| 76M53 | Section 130,131RS-5 | District 08 | 2 | The Kilian Corporation | $2,891,486 | $2,989,334 | +3.0% | IDOT |
| 62R17 | Section FAU | District 01 | 3 | Arrow Road Construction Co. | $2,823,438 | $3,144,000 | +11% | IDOT |
| 62K03 | Section 2019-130-TS&N | District 01 | 4 | D. Construction, Inc. | $2,706,023 | $2,729,270 | +1.0% | IDOT |
| 62J30 | Section 2019-055-TS | District 01 | 2 | R. W. Dunteman Company | $2,443,180 | $2,474,504 | +1.0% | IDOT |
| 70B05 | Section K(RS-2) | District 05 | 2 | Cross Construction, Inc. | $2,348,964 | $2,577,501 | +10% | IDOT |
| 93799 | Springfield, section 15-00483-00-BR | District 06 | 1 | White Construction LLC | $2,332,215 | IDOT | ||
| 70E84 | Section (3R,3X)RS-1 | District 05 | 2 | Open Road Paving Company LLC | $2,292,482 | $2,554,218 | +11% | IDOT |
| 78610 | Section 133B-1 | District 09 | 2 | E. T. Simonds Construction Company | $2,284,273 | $2,780,995 | +22% | IDOT |
| 70541 | Section 55-BR-1 | District 05 | 2 | Stark Excavating, Inc. | $2,231,946 | $2,482,332 | +11% | IDOT |
| 91604 | Project Number: Ejbd-157 / /, section 20-00044-04-RS | District 05 | 3 | Kinney Contractors, Inc. | $2,168,096 | $2,226,316 | +3.0% | IDOT |
| 93778 | Project Number: 1Uv8-331 / /, section 15-00138-00-BR | District 06 | 3 | C-Hill Civil Contractors, Inc. and Sierra Bravo, LLC JV | $2,084,484 | $2,430,269 | +17% | IDOT |
| 61J16 | Wilmette, section 19-00203-02-CH | District 01 | 2 | Capitol Cement Co., Inc. | $2,066,472 | $3,036,886 | +47% | IDOT |
| 99697 | Project Number: Msev-708 / /, section 22-00085-00-RS | District 09 | 1 | E. T. Simonds Construction Company | $2,058,067 | IDOT | ||
| 87803 | Project Number: Kek8-123 / /, section 20-00135-04-RS | District 03 | 2 | H. J. Eppel & Co. | $2,004,192 | $2,041,062 | +2.0% | IDOT |
| 46612 | Section D2 | District 02 | 3 | A. C. Pavement Striping Co. | $1,999,000 | $1,999,500 | 0.0% | IDOT |
| 70E85 | Section (10,11)RS-3 | District 05 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $1,961,614 | IDOT | ||
| 89752 | Project Number: Nmkm-136 / /, section 17-00183-00-BR | District 04 | 3 | Stark Excavating, Inc. | $1,938,063 | $2,330,933 | +20% | IDOT |
| 61H78 | Rosemont, section 17-00034-00-BT | District 01 | 5 | Landmark Contractors, Inc. | $1,795,974 | $1,823,578 | +2.0% | IDOT |
| 62M65 | Section 2020-191-RS | District 01 | 4 | Plote Construction, Inc. | $1,750,124 | $1,774,378 | +1.0% | IDOT |
| 76N83 | Section 101RS-5 | District 08 | 2 | Charles E. Mahoney Co. | $1,689,154 | $1,753,741 | +4.0% | IDOT |
| 61J05 | Bannockburn, section 19-00018-00-RS | District 01 | 4 | Builders Paving, LLC | $1,542,000 | $1,590,734 | +3.0% | IDOT |
| 64N66 | Section (116,117,I-15D)RS | District 02 | 3 | Advanced Asphalt Company | $1,458,298 | $1,840,000 | +26% | IDOT |
| 62R54 | Section FAU | District 01 | 6 | Arrow Road Construction Co. | $1,381,362 | $1,420,700 | +3.0% | IDOT |
| 68G41 | Section [6B-2-BR;(6B-3-BR)BJR]BRR,BDR | District 04 | 2 | Brandt Construction Co. | $1,365,000 | $1,394,251 | +2.0% | IDOT |
| 76R48 | Section 82-(5,6,7)PP-1 | District 08 | 1 | Christ Bros. Asphalt, Inc. | $1,321,723 | IDOT | ||
| 85737 | Project Number: R2X1-326 / /, section 21-00258-00-RS | District 02 | 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,297,131 | IDOT | ||
| 66M37 | Section (28,17,16)SFY | District 03 | 2 | D. Construction, Inc. | $1,244,052 | $1,593,444 | +28% | IDOT |
| 76R88 | Section DIST | District 08 | 1 | Electrico, Inc. | $1,181,335 | IDOT | ||
| 68H59 | Section D4 | District 04 | 2 | Laser Electric, Inc. | $1,152,909 | $1,296,480 | +12% | IDOT |
| 99699 | Project Number: D9Zw-143 / /, section 19-00131-00-RS | District 09 | 1 | E. T. Simonds Construction Company | $1,127,407 | IDOT | ||
| 97799 | O'Fallon, section 19-00053-03-BR | District 08 | 3 | C-Hill Civil Contractors, Inc. and Sierra Bravo, LLC JV | $1,106,940 | $1,275,680 | +15% | IDOT |
| 85736 | Project Number: V70W-085 / /, section 19-00162-00-RS | District 02 | 1 | Dunn Company (Tyrolt Incorporated) | $1,072,851 | IDOT | ||
| 72M49 | Section (86)BDR-2,BRR,BJR-3 | District 06 | 4 | Freesen, a div of UCM, Inc. | $1,071,686 | $1,136,700 | +6.0% | IDOT |
| 87795 | Project Number: 19N1-078 / /, section 21-07127-00-BR | District 03 | 6 | Riber Construction, Inc. | $1,047,965 | $1,049,263 | 0.0% | IDOT |
| 66N04 | Section (32-1BR,32-1VBR)BP | District 03 | 3 | ERA-Valdivia Contractors, Inc. | $1,046,975 | $1,262,549 | +21% | IDOT |
| 64S20 | Section (124)RS | District 02 | 2 | Rock Road Companies, Inc. | $1,034,117 | $1,134,648 | +10% | IDOT |
| 62R50 | Section 2018-114-I | District 01 | 4 | Sjostrom & Sons, Inc. | $1,004,302 | $1,138,939 | +13% | IDOT |
| 99690 | Project Number: Dt0V-161 / /, section 20-00189-00-RS | District 09 | 2 | E. T. Simonds Construction Company | $967,116 | $1,033,370 | +7.0% | IDOT |
| 85733 | Project Number: 6Yxs-778 / /, section 20-00330-00-RS | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $940,932 | $989,684 | +5.0% | IDOT |
| 76R62 | Section (61-3)RS-5 | District 04 | 1 | Howell Paving, Inc. | $889,143 | IDOT | ||
| 62U14 | Section IL | District 01 | 2 | Capital Industrial Services, LLC | $883,300 | $1,862,104 | +111% | IDOT |
| 68H30 | Section D4 | District 04 | 2 | M & M Concrete, Inc. | $808,750 | $1,217,000 | +50% | IDOT |
| 76P99 | Section DIST | District 08 | 1 | Layne Christensen Company | $792,818 | IDOT | ||
| 61H65 | Schaumburg, section 16-00127-02-PV | District 01 | 7 | A Lamp Concrete Contractors, Inc. | $789,949 | $798,720 | +1.0% | IDOT |
| 61J32 | West Chicago, section 20-00085-00-RS | District 01 | 4 | Plote Construction, Inc. | $758,000 | $790,895 | +4.0% | IDOT |
| 70G07 | Section (122VB)BR | District 05 | 1 | Stark Excavating, Inc. | $731,970 | IDOT | ||
| 93797 | Project Number: Cu9J-103 / /, section 18-00108-01-RS | District 06 | 3 | P. H. Broughton & Sons, Inc. | $721,568 | $743,443 | +3.0% | IDOT |
| 61J31 | Lisle, section 21-00068-00-RS | District 01 | 5 | Schroeder Asphalt Services, Inc. | $695,387 | $696,500 | 0.0% | IDOT |
| 85735 | Project Number: 2T0I-016 / /, section 21-00185-11-PP | District 02 | 2 | Dunn Company (Tyrolt Incorporated) | $684,583 | $771,236 | +13% | IDOT |
| 76R81 | Section 111HVB-BP | District 08 | 2 | Civil Coatings and Construction Inc. | $631,797 | $653,532 | +3.0% | IDOT |
| 46614 | Section D6 | District 06 | 2 | P & P Construction Co. | $627,090 | $1,249,875 | +99% | IDOT |
| 62R70 | Section OR | District 01 | 2 | J. A. Johnson Paving Company | $607,596 | $773,000 | +27% | IDOT |
| 62U35 | Section FAI | District 01 | 3 | Rausch Infrastructure, LLC | $594,565 | $622,390 | +5.0% | IDOT |
| 61J06 | Deer Park, section 22-00018-00-RS | District 01 | 5 | Geske and Sons, Inc. | $576,911 | $623,382 | +8.0% | IDOT |
| 74B49 | Section D7 | District 07 | 3 | G. M. Sipes Construction, Inc. | $566,009 | $605,079 | +7.0% | IDOT |
| 68G35 | Section 108RS-6 | District 04 | 3 | A. C. Pavement Striping Co. | $559,696 | $615,146 | +10% | IDOT |
| 70907 | Section 57-4(1)CR | District 05 | 3 | Stark Excavating, Inc. | $552,000 | $745,209 | +35% | IDOT |
| 74B58 | Section D7 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $549,728 | IDOT | ||
| 62U51 | Section FAI | District 01 | 3 | MYS, Incorporated | $539,949 | $958,320 | +77% | IDOT |
| 64S24 | Section (161-1HB-4)BJR | District 02 | 4 | General Constructors Inc. of the Quad Cities | $533,147 | $586,548 | +10% | IDOT |
| 68G40 | Section [(Z-4B-15D)BR]BDR,SCR | District 04 | 3 | Otto Baum Company, Inc. | $523,800 | $575,285 | +10% | IDOT |
| 85738 | Moline, section 19-00270-00-RS | District 02 | 2 | Brandt Construction Co. | $522,000 | $582,494 | +12% | IDOT |
| 74B16 | Section D7 | District 07 | 2 | Sangamo Construction Company | $487,391 | $758,553 | +56% | IDOT |
| 74B45 | Section D7 | District 07 | 3 | Beniach Construction Co., Inc. | $487,187 | $495,713 | +2.0% | IDOT |
| 62U58 | Section FAI | District 01 | 3 | MYS, Incorporated | $475,040 | $515,808 | +9.0% | IDOT |
| 87808 | Project Number: 8Yb8-638 / /, section 19-25110-03-BR | District 03 | 3 | Tobey's Construction & Cartage, Inc. | $472,941 | $513,363 | +9.0% | IDOT |
| 87772 | Cortland, section 21-00008-00-RS | District 03 | 2 | Curran Contracting Company | $422,826 | $456,137 | +8.0% | IDOT |
| 64S15 | Section (161-1HB-7)BDR | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $421,357 | $430,299 | +2.0% | IDOT |
| 70G44 | Section D5 | District 05 | 2 | Done Rite Construction Co., Inc. | $419,500 | $525,000 | +25% | IDOT |
| 62U59 | Section FAI | District 01 | 3 | Orlando Lawn Service, Inc. | $417,600 | $459,205 | +10% | IDOT |
| 87813 | Streator, section 22-00105-00-SW | District 03 | 3 | Tobey's Construction & Cartage, Inc. | $417,120 | $524,920 | +26% | IDOT |
| 66N01 | Section (06-6 | District 03 | 2 | Electric Conduit Construction | $406,731 | $504,656 | +24% | IDOT |
| 68H02 | Section D4 | District 04 | 2 | Varsity Striping & Construction Co. | $386,166 | $1,148,936 | +198% | IDOT |
| 66M64 | Section (112X)CLV | District 03 | 3 | Tobey's Construction & Cartage, Inc. | $384,412 | $413,975 | +8.0% | IDOT |
| 78905 | Section (12-1,13-1)N-3;17(N-2) | District 09 | 2 | Samron Midwest Contracting, Inc. | $373,373 | $458,610 | +23% | IDOT |
| 68H16 | Section 119B(BR)BJR,P | District 04 | 3 | Otto Baum Company, Inc. | $371,800 | $416,545 | +12% | IDOT |
| 64S12 | Section (195-1B-1)BP | District 02 | 3 | Civil Coatings and Construction Inc. | $367,125 | $468,850 | +28% | IDOT |
| 72704 | Section D6 | District 06 | 2 | Capitol Construction Group, LLC d/b/a Egizii Electric | $363,146 | $494,746 | +36% | IDOT |
| 87804 | Sycamore, section 21-00084-00-RS | District 03 | 3 | Curran Contracting Company | $356,964 | $397,627 | +11% | IDOT |
| 62T97 | Section FAI | District 01 | 6 | D. Construction, Inc. | $347,375 | $358,570 | +3.0% | IDOT |
| 87796 | Project Number: Pkxu-134 / /, section 19-04115-00-BR | District 03 | 3 | Tobey's Construction & Cartage, Inc. | $336,879 | $343,077 | +2.0% | IDOT |
| 72110 | Section (84-10-3HB-3)BP | District 06 | 3 | Civil Coatings and Construction Inc. | $325,720 | $332,440 | +2.0% | IDOT |
| 61J07 | Palos Heights, section 16-00055-00-RS | District 01 | 4 | D. Construction, Inc. | $302,483 | $307,079 | +2.0% | IDOT |
| 62U45 | Section FAI | District 01 | 4 | Orlando Lawn Service, Inc. | $301,500 | $306,789 | +2.0% | IDOT |
| 97788 | Project Number: Ab9N-513 / /, section 18-00290-11-TL | District 08 | 1 | Christ Bros. Asphalt, Inc. | $299,566 | IDOT | ||
| 62U57 | Section FAI | District 01 | 3 | MYS, Incorporated | $298,812 | $350,345 | +17% | IDOT |
| 61J29 | Lake In The Hills, section 22-00041-00-RS | District 01 | 5 | Geske and Sons, Inc. | $283,920 | $334,690 | +18% | IDOT |
| 87812 | Grant Park, section 21-00018-00-BT | District 03 | 5 | M & J Underground Inc. | $269,969 | $299,847 | +11% | IDOT |
| 62R68 | Section FAP | District 01 | 6 | P. T. Ferro Construction Co. | $258,287 | $290,214 | +12% | IDOT |
| 62U67 | Section FAI | District 01 | 3 | The Final Connection, Inc. | $248,640 | $251,911 | +1.0% | IDOT |
| 72M76 | Section D6 | District 06 | 3 | M & M Concrete, Inc. | $247,986 | $264,478 | +7.0% | IDOT |
| 70G17 | Section (115BR-1)BR-1 | District 05 | 2 | Stark Excavating, Inc. | $243,528 | $460,250 | +89% | IDOT |
| 72705 | Section D6 | District 06 | 1 | Bodine Electric of Decatur | $233,140 | IDOT | ||
| 68H21 | Section (90-14;72-6)CJS | District 04 | 2 | Complete Asphalt Service Co. | $224,649 | $259,804 | +16% | IDOT |
| 64S22 | Section D2 | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $219,492 | $279,067 | +27% | IDOT |
| 74B71 | Section D7 | District 07 | 1 | Endrizzi Contracting, Inc | $209,914 | IDOT | ||
| 66N13 | Section (401S)RS,MG | District 03 | 2 | H. J. Eppel & Co. | $203,759 | $267,787 | +31% | IDOT |
| 61J36 | Northbrook, section 21-00179-00-BT | District 01 | 6 | Alliance Contractors, Inc. | $196,357 | $196,626 | 0.0% | IDOT |
| 62U65 | Section FAI | District 01 | 5 | MYS, Incorporated | $196,345 | $215,040 | +10% | IDOT |
| 76R51 | Section DIST | District 08 | 2 | Haier Plumbing and Heating, Inc. | $180,000 | $236,433 | +31% | IDOT |
| 62U66 | Section FAI | District 01 | 2 | MYS, Incorporated | $179,983 | $369,600 | +105% | IDOT |
| 78953 | Section 107SCR-1/ | District 09 | 3 | E. T. Simonds Construction Company | $176,175 | $191,542 | +9.0% | IDOT |
| 64S21 | Section D2 | District 02 | 4 | Advanced Asphalt Company | $166,800 | $184,901 | +11% | IDOT |
| 95915 | Warrensburg, section 19-00001-00-SW | District 07 | 2 | Kinney Contractors, Inc. | $166,604 | $187,057 | +12% | IDOT |
| 72106 | Section 104PP-1 | District 06 | 2 | G. M. Sipes Construction, Inc. | $164,819 | $191,304 | +16% | IDOT |
| 62U60 | Section FAI | District 01 | 3 | MYS, Incorporated | $163,621 | $166,080 | +2.0% | IDOT |
| 70G25 | Section FY | District 05 | 3 | M & M Concrete, Inc. | $163,336 | $173,000 | +6.0% | IDOT |
| 74B21 | Section D7 | District 07 | 3 | All States Painting, Inc. | $147,989 | $149,977 | +1.0% | IDOT |
| 76R45 | Section 101-2-CJS-1 | District 08 | 3 | Freehill Asphalt, Inc. | $145,017 | $146,423 | +1.0% | IDOT |
| 46611 | Section D2 | District 02 | 3 | O'Brien Civil Works, Inc. | $144,456 | $167,424 | +16% | IDOT |
| 66N10 | Section 2023-1 | District 03 | 2 | Endrizzi Contracting, Inc | $141,133 | $149,235 | +6.0% | IDOT |
| 76M44 | Section 28CR-1 | District 08 | 3 | Stutz Excavating, Inc. | $141,088 | $168,076 | +19% | IDOT |
| 62U38 | Section FAP | District 01 | 7 | M & M Concrete, Inc. | $131,491 | $234,830 | +79% | IDOT |
| 76R42 | Section (12,13,14)CJS-1 | District 08 | 5 | Freehill Asphalt, Inc. | $101,522 | $113,321 | +12% | IDOT |
| 66M72 | Section (35)CJS&(12)CJS | District 03 | 1 | SKC Construction, Inc. | $47,368 | IDOT | ||
| 72121 | Section (84-10-1B-2)BRR | District 06 | 4 | Otto Baum Company, Inc. | $39,802 | $42,075 | +6.0% | IDOT |
| 78902 | Section 22SLP-2 | District 09 | 5 | Chris Harner Excavating | $25,672 | $62,549 | +144% | IDOT |
| 72631 | Section 28CJS | District 06 | 3 | Complete Asphalt Service Co. | $22,444 | $28,736 | +28% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way