Capitol Cement Co., Inc.: IDOT bid record
Capitol Cement Co., Inc. submitted 31 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 16 JAN 2026, and was the low bidder on 5 of them (16%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $19,246,489
- Latest bid
- 16 JAN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 13 | 1 | 8% |
| 2022 | 8 | 1 | 13% |
| 2023 | 5 | 1 | 20% |
| 2024 | 3 | 1 | 33% |
| 2025 | 1 | 1 | 100% |
| 2026 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 26 | 26 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 26 | 26 (100%) | $0.80 | $0.80 |
| Main EX TR sig instal | 85000200 | EACH | 22 | 17 (77%) | $2,493.47 | $2,600.00 |
| Bit matls tack CT | 40600290 | LB | 24 | 16 (67%) | $0.01 | $0.01 |
| Undrgrd C galvs 2 | 81028200 | LF | 22 | 16 (73%) | $22.15 | $38.08 |
| Elcbl C signal 14 2C | 87301215 | LF | 20 | 16 (80%) | $1.20 | $2.20 |
| Elcbl C egrdc 6 1C | 87301900 | LF | 20 | 15 (75%) | $2.00 | $3.25 |
| Det loop T1 | 88600100 | LF | 19 | 15 (79%) | $17.10 | $26.17 |
| Soil disposal analy | 66900530 | EACH | 26 | 14 (54%) | $1,300.00 | $1,470.00 |
| Elcbl C signal 14 3C | 87301225 | LF | 19 | 14 (74%) | $1.50 | $2.30 |
| Elcbl C lead 14 1PR | 87301305 | LF | 17 | 14 (82%) | $1.45 | $2.00 |
| Remov EX TS equip | 89502375 | EACH | 16 | 14 (88%) | $1,920.00 | $2,720.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Alliance Contractors, Inc. | 22 | 12 of 22 |
| Martam Construction Incorporated | 18 | 8 of 18 |
| R. W. Dunteman Company | 15 | 11 of 15 |
| Acura Inc. | 14 | 8 of 14 |
| A Lamp Concrete Contractors, Inc. | 13 | 7 of 13 |
| Plote Construction, Inc. | 12 | 11 of 12 |
| Copenhaver Construction, Inc. | 12 | 5 of 12 |
| Berger Excavating Contractors, Inc. | 8 | 7 of 8 |
| Landmark Contractors, Inc. | 7 | 5 of 7 |
| Campanella and Sons, Inc. | 6 | 3 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 JAN 2026 | 61K16 | District 01 | Franklin Park, section 17-00083-02-PV | 5 of 10 | $3,994,471 | +4.0% |
| 07 NOV 2025 | 61L92 | District 01 | Lincolnwood, section 16-00061-00-LS | 1 of 5 | $5,462,909 | Low, 0.0% under the second |
| 20 SEP 2024 | 61K60 | District 01 | Evanston, section 19-00285-00-RS | 1 of 2 | $9,942,695 | Low, 1.0% under the second |
| 08 MAR 2024 | 61D77 | District 01 | Morton Grove, section 12-00106-00-PV | 5 of 6 | $5,752,281 | +27% |
| 19 JAN 2024 | 61J53 | District 01 | Prospect Heights, section 19-00054-00-SW | 8 of 8 | $3,486,756 | +28% |
| 10 MAR 2023 | 61H23 | District 01 | Skokie, section 08-00279-00-FP | 3 of 5 | $6,954,140 | +5.0% |
| 10 MAR 2023 | 61H59 | District 01 | Niles, section 13-00118-00-WR | 2 of 2 | $4,088,824 | +4.0% |
| 10 MAR 2023 | 61J16 | District 01 | Wilmette, section 19-00203-02-CH | 1 of 2 | $2,066,472 | Low, 47% under the second |
| 20 JAN 2023 | 61J04 | District 01 | Schaumburg, section 16-00127-03-PV | 3 of 5 | $9,991,313 | +14% |
| 20 JAN 2023 | 61J20 | District 01 | Bellwood, section 21-00148-00-RS | 6 of 11 | $972,018 | +14% |
| 23 SEP 2022 | 61H81 | District 01 | Niles, section 19-00135-00-BT | 1 of 6 | $539,769 | Low, 14% under the second |
| 23 SEP 2022 | 61H94 | District 01 | Evanston, section 19-00284-00-CH | 2 of 3 | $1,140,999 | 0.0% |
| 11 MAR 2022 | 61G85 | District 01 | Highland Park, section 15-00125-00-PV | 4 of 6 | $10,298,673 | +10% |
| 11 MAR 2022 | 61H14 | District 01 | Franklin Park, section 17-00083-00-PV | 8 of 9 | $29,381,620 | +25% |
| 21 JAN 2022 | 61G71 | District 01 | Berkeley, section 18-00035-00-PV | 8 of 13 | $2,993,921 | +13% |
| 21 JAN 2022 | 61H24 | District 01 | Berwyn, section 13-00170-00-RS | 2 of 5 | $16,973,109 | +3.0% |
| 21 JAN 2022 | 61H36 | District 01 | Hinsdale, section 21-00099-00-PV | 6 of 13 | $2,597,065 | +25% |
| 21 JAN 2022 | 62N71 | District 01 | Section 2021-012-RS&SW | 3 of 3 | $945,988 | +29% |
| 05 NOV 2021 | 61H15 | District 01 | Streamwood, section 10-00055-01-WR | 7 of 8 | $6,888,990 | +17% |
| 23 APR 2021 | 60T17 | District 01 | Section 52-N | 9 of 9 | $1,655,179 | +26% |
| 23 APR 2021 | 61G58 | District 01 | Aurora, section 14-00210-02-PV | 11 of 11 | $9,970,294 | +28% |
| 23 APR 2021 | 61H08 | District 01 | Arlington Heights, section 17-00209-00-RS | 9 of 9 | $1,498,919 | +17% |
| 23 APR 2021 | 62633 | District 01 | Section 2003-065N | 9 of 9 | $5,683,971 | +26% |
| 05 MAR 2021 | 61E91 | District 01 | Barrington, section 12-00089-00-PK | 4 of 10 | $1,591,203 | +7.0% |
| 05 MAR 2021 | 61G57 | District 01 | Des Plaines, section 14-00221-00-BT | 3 of 9 | $2,498,988 | +5.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.