Campanella and Sons, Inc.: IDOT bid record
Campanella and Sons, Inc. submitted 42 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 7 of them (17%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $24,639,022
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 14 | 3 | 21% |
| 2022 | 7 | 0 | 0% |
| 2023 | 3 | 1 | 33% |
| 2024 | 5 | 2 | 40% |
| 2025 | 6 | 0 | 0% |
| 2026 | 7 | 1 | 14% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 35 | 35 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 34 | 34 (100%) | $0.80 | $0.80 |
| Bit matls tack CT | 40600290 | LB | 34 | 32 (94%) | $0.01 | $0.01 |
| THPL PVT MK line 6 | 78000400 | LF | 30 | 20 (67%) | $1.46 | $1.40 |
| Bit matls PR CT | 40600275 | LB | 20 | 20 (100%) | $0.01 | $0.01 |
| THPL PVT MK line 4 | 78000200 | LF | 32 | 19 (59%) | $0.88 | $0.88 |
| THPL PVT MK line 12 | 78000600 | LF | 34 | 18 (53%) | $3.00 | $3.10 |
| Sidewalk rem | 44000600 | SF | 32 | 17 (53%) | $1.07 | $3.00 |
| THPL PVT MK line 24 | 78000650 | LF | 30 | 16 (53%) | $5.75 | $6.00 |
| Tree remov 6-15 | 20100110 | UNIT | 21 | 14 (67%) | $19.00 | $35.00 |
| HMA SC IL-9.5 D N50 | 40604060 | TON | 35 | 13 (37%) | $115.00 | $120.00 |
| Soil disposal analy | 66900530 | EACH | 33 | 13 (39%) | $1,300.00 | $1,470.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Martam Construction Incorporated | 21 | 8 of 21 |
| Copenhaver Construction, Inc. | 21 | 10 of 21 |
| Alliance Contractors, Inc. | 20 | 9 of 20 |
| A Lamp Concrete Contractors, Inc. | 18 | 9 of 18 |
| Berger Excavating Contractors, Inc. | 14 | 6 of 14 |
| Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 14 | 5 of 14 |
| Lake County Grading Company, LLC | 12 | 6 of 12 |
| Schroeder Asphalt Services, Inc. | 11 | 1 of 11 |
| R. W. Dunteman Company | 11 | 8 of 11 |
| Plote Construction, Inc. | 10 | 7 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 61K85 | District 01 | Rolling Meadows, section 21-00126-00-PV | 6 of 10 | $3,084,064 | +10% |
| 12 JUN 2026 | 62U72 | District 01 | Section FAP | 2 of 5 | $52,996,841 | 0.0% |
| 12 JUN 2026 | 80D46 | District 01 | Section 2026-2181-C,HBK | 2 of 7 | $1,146,156 | +5.0% |
| 27 FEB 2026 | 61M27 | District 01 | Schaumburg, section 25-00149-01-RS | 4 of 6 | $4,231,352 | +19% |
| 27 FEB 2026 | 61M28 | District 01 | Schaumburg, section 25-00149-02-RS | 6 of 7 | $5,234,028 | +32% |
| 16 JAN 2026 | 61L42 | District 01 | Lake Forest, section 13-00095-00-CH | 2 of 5 | $3,704,095 | +1.0% |
| 16 JAN 2026 | 61M08 | District 01 | Lake Bluff, section 18-00039-00-PV | 1 of 5 | $3,131,134 | Low, 5.0% under the second |
| 01 AUG 2025 | 61L37 | District 01 | Schaumburg, section 22-00142-01-PV | 4 of 9 | $6,015,487 | +4.0% |
| 01 AUG 2025 | 61L38 | District 01 | Schaumburg, section 22-00142-02-PV | 3 of 8 | $6,231,695 | +4.0% |
| 01 AUG 2025 | 61L58 | District 01 | Carpentersville, section 22-00094-00-FP | 3 of 8 | $5,330,096 | +5.0% |
| 13 JUN 2025 | 61J86 | District 01 | Round Lake Beach, section 17-00080-00-PV | 2 of 5 | $4,511,308 | +3.0% |
| 13 JUN 2025 | 61L52 | District 01 | Round Lake, section 21-00085-00-BT | 2 of 2 | $672,482 | +29% |
| 25 APR 2025 | 61L18 | District 01 | Marengo, section 21-00029-00-PV | 4 of 7 | $3,936,845 | +11% |
| 08 NOV 2024 | 61K74 | District 01 | Deerfield, section 20-00108-00-PV | 5 of 5 | $11,682,039 | +15% |
| 20 SEP 2024 | 61K63 | District 01 | Buffalo Grove, section 20-00108-02-RS | 5 of 6 | $10,899,215 | +32% |
| 26 APR 2024 | 61K34 | District 01 | Lindenhurst, section 18-00032-01-PV | 3 of 3 | $5,872,519 | +11% |
| 08 MAR 2024 | 62W53 | District 01 | Section 2023-917-TL | 1 of 3 | $4,399,898 | Low, 3.0% under the second |
| 19 JAN 2024 | 61K05 | District 01 | Project Number: T3Z4-674 / /, section 13-00055-06-WR | 1 of 2 | $4,199,910 | Low, 1.0% under the second |
| 04 AUG 2023 | 62R18 | District 01 | Section FA | 3 of 3 | $4,663,983 | +9.0% |
| 16 JUN 2023 | 62J41 | District 01 | Section 2019-074-SW&I | 1 of 3 | $7,886,157 | Low, 13% under the second |
| 10 MAR 2023 | 61J15 | District 01 | Vernon Hills, section 98-00026-02-WR | 2 of 3 | $7,000,000 | +15% |
| 11 MAR 2022 | 61G85 | District 01 | Highland Park, section 15-00125-00-PV | 5 of 6 | $10,522,684 | +12% |
| 11 MAR 2022 | 61H45 | District 01 | Buffalo Grove, section 16-00106-03-RS | 6 of 7 | $3,594,821 | +16% |
| 11 MAR 2022 | 61H58 | District 01 | Spring Grove, section 21-00018-01-RS | 7 of 8 | $257,908 | +57% |
| 21 JAN 2022 | 61G01 | District 01 | Woodstock, section 16-00114-00-PV | 7 of 8 | $3,138,028 | +14% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.