Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.: IDOT bid record

Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. submitted 42 bids on Illinois DOT contracts in the data, from 10 MAR 2023 to 12 JUN 2026, and was the low bidder on 8 of them (19%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$167,721,291
Latest bid
12 JUN 2026
Data through
18 SEP 2026
42Bids
8Low bids
19Win rate, percent
+9.0%Median gap to the low bid when not low, 34 bids

By year

YearBidsLow bidsWin rate
20237229%
202419211%
202511218%
20265240%
Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc., IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR3535 (100%)$15.00$15.00
TraineesZ0076600HR3434 (100%)$0.80$0.80
Bit matls tack CT40600290LB3633 (92%)$0.01$0.01
THPL PVT MK line 478000200LF3723 (62%)$0.88$0.88
Comb curb gutter rem44000500LF3423 (68%)$5.20$11.61
Changeable message SN70107025CAL DAY2621 (81%)$28.00$55.00
Bit matls PR CT40600275LB2421 (88%)$0.01$0.01
Sign panel T172000100SF3120 (65%)$26.00$31.00
Temp eros contr seed28000250LB3019 (63%)$5.00$5.00
Temp PVT MK L4 T4 tape70307120LF2219 (86%)$1.15$1.25
THPL PVT MK line 2478000650LF3318 (55%)$5.75$6.00
THPL PVT MK LTR & sym78000100SF3318 (55%)$5.75$5.75
Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202662U72District 01Section FAP5 of 5$65,925,637+25%
24 APR 202661M17District 01Algonquin, section 22-00093-00-PV1 of 6$3,694,062Low, 1.0% under the second
24 APR 202680C85District 01Section 2025-2127-R,C,TS,SW1 of 4$49,786,194Low, 2.0% under the second
16 JAN 202661L42District 01Lake Forest, section 13-00095-00-CH3 of 5$3,769,096+3.0%
16 JAN 202661M08District 01Lake Bluff, section 18-00039-00-PV2 of 5$3,282,476+5.0%
19 SEP 202561K93District 01Elk Grove Village, section 20-00073-01-PV4 of 7$15,838,399+26%
01 AUG 202561L37District 01Schaumburg, section 22-00142-01-PV5 of 9$6,089,153+6.0%
01 AUG 202561L38District 01Schaumburg, section 22-00142-02-PV5 of 8$6,384,040+6.0%
01 AUG 202561L58District 01Carpentersville, section 22-00094-00-FP6 of 8$5,384,144+6.0%
13 JUN 202561J86District 01Round Lake Beach, section 17-00080-00-PV4 of 5$4,746,188+8.0%
13 JUN 202562T95District 01Section FAI7 of 8$11,085,209+29%
25 APR 202561L18District 01Marengo, section 21-00029-00-PV2 of 7$3,674,293+4.0%
25 APR 202562X94District 01Section 2024-1052-N,C,SW,FL1 of 4$78,336,172Low, 4.0% under the second
07 MAR 202561J84District 01Geneva, section 05-00102-00-PV4 of 5$31,954,021+6.0%
07 MAR 202562X90District 01Section 2024-SWP-008(VAR)2 of 2$3,490,000+28%
17 JAN 202561K87District 01Maywood, section 19-00140-00-FP1 of 8$4,773,174Low, 7.0% under the second
08 NOV 202461K74District 01Deerfield, section 20-00108-00-PV3 of 5$10,529,394+3.0%
08 NOV 202462W03District 01Section 20235 of 9$1,284,326+22%
20 SEP 202461K06District 01Streamwood, section 10-00055-02-WR4 of 8$10,952,276+2.0%
20 SEP 202461K63District 01Buffalo Grove, section 20-00108-02-RS1 of 6$8,284,395Low, 12% under the second
20 SEP 202462V99District 01Section 20234 of 8$1,597,798+12%
14 JUN 202462F11District 01Section 3212TS-RR3 of 3$22,772,379+27%
26 APR 202461K34District 01Lindenhurst, section 18-00032-01-PV2 of 3$5,546,324+5.0%
26 APR 202461K35District 01Crystal Lake, section 22-00134-00-TL4 of 4$2,933,129+13%
26 APR 202461K41District 01Palos Heights, section 19-00058-00-BT7 of 7$1,161,223+33%
Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way