Lenny Hoffman Excavating, Inc.: IDOT bid record
Lenny Hoffman Excavating, Inc. submitted 13 bids on Illinois DOT contracts in the data, from 22 SEP 2023 to 08 NOV 2024, and was the low bidder on 2 of them (15%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $8,120,565
- Latest bid
- 08 NOV 2024
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 1 | 0 | 0% |
| 2024 | 12 | 2 | 17% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bit matls tack CT | 40600290 | LB | 11 | 10 (91%) | $0.01 | $0.01 |
| Trainees TPG | Z0076604 | HR | 9 | 9 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 9 | 9 (100%) | $0.80 | $0.80 |
| Bit matls PR CT | 40600275 | LB | 7 | 7 (100%) | $0.01 | $0.01 |
| Temp access- com ent | X4022000 | EACH | 6 | 5 (83%) | $263.00 | $600.00 |
| Temp access- priv ent | X4021000 | EACH | 6 | 5 (83%) | $200.00 | $400.00 |
| Earth excavation | 20200100 | CY | 12 | 4 (33%) | $36.00 | $48.00 |
| Trench backfill | 20800150 | CY | 8 | 4 (50%) | $38.50 | $55.00 |
| Storm sewer rem 12 | 55100500 | LF | 6 | 4 (67%) | $12.25 | $24.55 |
| Geotech fab F/GR stab | 21001000 | SY | 8 | 3 (38%) | $2.75 | $2.60 |
| Man TA 5 dia T1F CL | 60221100 | EACH | 7 | 3 (43%) | $5,605.00 | $5,522.78 |
| Filter fabric | 28200200 | SY | 5 | 3 (60%) | $5.00 | $4.65 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Martam Construction Incorporated | 7 | 5 of 7 |
| Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 7 | 4 of 7 |
| A Lamp Concrete Contractors, Inc. | 6 | 5 of 6 |
| R. W. Dunteman Company | 5 | 5 of 5 |
| Alliance Contractors, Inc. | 5 | 5 of 5 |
| Plote Construction, Inc. | 3 | 3 of 3 |
| K-Five Construction Corporation | 3 | 3 of 3 |
| Curran Contracting Company | 3 | 3 of 3 |
| Acura Inc. | 2 | 2 of 2 |
| Capitol Cement Co., Inc. | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 NOV 2024 | 62W03 | District 01 | Section 2023 | 8 of 9 | $1,730,294 | +64% |
| 08 NOV 2024 | 62W05 | District 01 | Section 2023 | 7 of 8 | $734,973 | +26% |
| 20 SEP 2024 | 61K72 | District 01 | Broadview, section 19-00082-00-BT | 3 of 3 | $4,197,281 | +44% |
| 20 SEP 2024 | 62V99 | District 01 | Section 2023 | 8 of 8 | $2,379,452 | +67% |
| 26 APR 2024 | 61K32 | District 01 | Wheaton, section 20-00123-00-PV | 5 of 6 | $4,962,433 | +16% |
| 26 APR 2024 | 61K34 | District 01 | Lindenhurst, section 18-00032-01-PV | 1 of 3 | $5,300,754 | Low, 5.0% under the second |
| 26 APR 2024 | 61K35 | District 01 | Crystal Lake, section 22-00134-00-TL | 2 of 4 | $2,693,347 | +4.0% |
| 26 APR 2024 | 62U84 | District 01 | Section FAP | 4 of 4 | $3,776,056 | +73% |
| 08 MAR 2024 | 61D77 | District 01 | Morton Grove, section 12-00106-00-PV | 4 of 6 | $5,495,485 | +21% |
| 08 MAR 2024 | 61K10 | District 01 | Volo, section 15-08113-05-CH | 1 of 4 | $2,819,811 | Low, 0.0% under the second |
| 19 JAN 2024 | 61J53 | District 01 | Prospect Heights, section 19-00054-00-SW | 7 of 8 | $3,415,214 | +25% |
| 19 JAN 2024 | 61J68 | District 01 | Johnsburg, section 20-00016-00-RS | 2 of 3 | $2,987,655 | +5.0% |
| 22 SEP 2023 | 62U22 | District 01 | Section FAP | 4 of 4 | $507,619 | +75% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.