Lenny Hoffman Excavating, Inc.: IDOT bid record

Lenny Hoffman Excavating, Inc. submitted 13 bids on Illinois DOT contracts in the data, from 22 SEP 2023 to 08 NOV 2024, and was the low bidder on 2 of them (15%). When it was not low, its total sat a median +26% above the low bid.

Owner
Illinois DOT
Low bid volume
$8,120,565
Latest bid
08 NOV 2024
Data through
18 SEP 2026
13Bids
2Low bids
15Win rate, percent
+26%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
2023100%
202412217%
Lenny Hoffman Excavating, Inc., IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB1110 (91%)$0.01$0.01
Trainees TPGZ0076604HR99 (100%)$15.00$15.00
TraineesZ0076600HR99 (100%)$0.80$0.80
Bit matls PR CT40600275LB77 (100%)$0.01$0.01
Temp access- com entX4022000EACH65 (83%)$263.00$600.00
Temp access- priv entX4021000EACH65 (83%)$200.00$400.00
Earth excavation20200100CY124 (33%)$36.00$48.00
Trench backfill20800150CY84 (50%)$38.50$55.00
Storm sewer rem 1255100500LF64 (67%)$12.25$24.55
Geotech fab F/GR stab21001000SY83 (38%)$2.75$2.60
Man TA 5 dia T1F CL60221100EACH73 (43%)$5,605.00$5,522.78
Filter fabric28200200SY53 (60%)$5.00$4.65
Lenny Hoffman Excavating, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
08 NOV 202462W03District 01Section 20238 of 9$1,730,294+64%
08 NOV 202462W05District 01Section 20237 of 8$734,973+26%
20 SEP 202461K72District 01Broadview, section 19-00082-00-BT3 of 3$4,197,281+44%
20 SEP 202462V99District 01Section 20238 of 8$2,379,452+67%
26 APR 202461K32District 01Wheaton, section 20-00123-00-PV5 of 6$4,962,433+16%
26 APR 202461K34District 01Lindenhurst, section 18-00032-01-PV1 of 3$5,300,754Low, 5.0% under the second
26 APR 202461K35District 01Crystal Lake, section 22-00134-00-TL2 of 4$2,693,347+4.0%
26 APR 202462U84District 01Section FAP4 of 4$3,776,056+73%
08 MAR 202461D77District 01Morton Grove, section 12-00106-00-PV4 of 6$5,495,485+21%
08 MAR 202461K10District 01Volo, section 15-08113-05-CH1 of 4$2,819,811Low, 0.0% under the second
19 JAN 202461J53District 01Prospect Heights, section 19-00054-00-SW7 of 8$3,415,214+25%
19 JAN 202461J68District 01Johnsburg, section 20-00016-00-RS2 of 3$2,987,655+5.0%
22 SEP 202362U22District 01Section FAP4 of 4$507,619+75%
Lenny Hoffman Excavating, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy