IDOT letting results, January 19, 2024
133 contracts let by Illinois DOT on January 19, 2024, $393,861,085 in low bids, a median of 3 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 133
- Low bids, total
- $393,861,085
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 62R89 | Section FAI | District 01 | 3 | Walsh Construction Company II, LLC | $94,772,970 | $98,238,785 | +4.0% | IDOT |
| 64R71 | Section (5)RS | District 02 | 5 | Plote Construction, Inc. | $44,321,000 | $44,424,805 | 0.0% | IDOT |
| 72791 | Section 54-(1RS5,2RS3,2HB-D-I1) | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $31,024,268 | IDOT | ||
| 72B88 | Section (4Z)R,SW; | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $15,206,887 | IDOT | ||
| 66K67 | Section (32-2)RS,BRR | District 03 | 2 | D. Construction, Inc. | $12,150,715 | $16,193,218 | +33% | IDOT |
| 61J67 | Streamwood, section 21-00067-00-BR | District 01 | 3 | Herlihy Mid-Continent Company | $10,785,770 | $10,921,677 | +1.0% | IDOT |
| 61H98 | Lockport, section 18-00084-00-WR | District 01 | 4 | Austin Tyler Construction, Inc. | $10,458,102 | $11,194,264 | +7.0% | IDOT |
| 70B89 | Section 101RS-5 | District 05 | 2 | Open Road Paving Company LLC | $9,851,467 | $11,051,755 | +12% | IDOT |
| 46933 | Section FORBES | District 08 | 2 | DMS Contracting, Inc. | $8,455,395 | $9,483,767 | +12% | IDOT |
| 62K60 | Section 2019-187-B | District 01 | 4 | Dunnet Bay Construction Company | $7,746,876 | $8,116,631 | +5.0% | IDOT |
| 76M81 | Section (22,101X,101)RS-3 | District 08 | 3 | Samron Midwest Contracting, Inc. | $6,738,441 | $7,442,581 | +10% | IDOT |
| 74761 | Section (5,6)RS-1 | District 07 | 1 | Howell Paving, Inc. | $6,459,330 | IDOT | ||
| 89809 | Macomb, section 19-00155-00-PV | District 04 | 1 | Gunther Construction, a div of UCM, Inc. | $6,189,408 | IDOT | ||
| 61J73 | Arlington Heights, section 22-00217-00-RS | District 01 | 5 | Builders Paving, LLC | $4,487,708 | $4,588,824 | +2.0% | IDOT |
| 68D48 | Section [(72-30;48-29)HB-1]BRR | District 04 | 3 | Stark Excavating, Inc. | $4,407,159 | $4,480,000 | +2.0% | IDOT |
| 61K05 | Project Number: T3Z4-674 / /, section 13-00055-06-WR | District 01 | 2 | Campanella and Sons, Inc. | $4,199,910 | $4,250,803 | +1.0% | IDOT |
| 66E40 | Section (38-7HB-2)D | District 03 | 1 | Iroquois Paving Corporation | $4,148,759 | IDOT | ||
| 91626 | Project Number: 4Rjl-930 / /, section 20-00044-05-RS | District 05 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $4,050,045 | IDOT | ||
| 97820 | Project Number: Fu6M-069 / /, section 20-00144-00-SP | District 08 | 2 | Guinzy Construction,Inc. | $3,423,535 | $4,022,744 | +18% | IDOT |
| 64P11 | Section (103,104)RS-1 | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $3,414,665 | $3,432,098 | +1.0% | IDOT |
| 62T58 | Section FAP | District 01 | 4 | Iroquois Paving Corporation | $3,384,321 | $3,758,694 | +11% | IDOT |
| 74A09 | Section (51-24HB-1)BR | District 07 | 2 | Samron Midwest Contracting, Inc. | $3,362,362 | $4,883,045 | +45% | IDOT |
| 72H58 | Section 121RS-4 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $2,900,266 | IDOT | ||
| 61J68 | Johnsburg, section 20-00016-00-RS | District 01 | 3 | Alliance Contractors, Inc. | $2,849,871 | $2,987,655 | +5.0% | IDOT |
| 61J53 | Prospect Heights, section 19-00054-00-SW | District 01 | 8 | Acura Inc. | $2,725,444 | $2,794,965 | +3.0% | IDOT |
| 78A18 | Section (6-1)RS-3(6-3,6-2,7-1,7-3)RS-2 | District 09 | 2 | Samron Midwest Contracting, Inc. | $2,696,596 | $2,957,688 | +10% | IDOT |
| 62W36 | Section 2023-SWP-003(NC) | District 01 | 2 | Central Sweeping of Illinois, LLC | $2,653,175 | $5,436,250 | +105% | IDOT |
| 62U69 | Section 2022 | District 01 | 1 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | $2,640,000 | IDOT | ||
| 68D83 | Section 48[(26VB)BY,BY-1]BRR | District 04 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,637,099 | $2,808,000 | +6.0% | IDOT |
| 66967 | Section 135 | District 03 | 2 | Advanced Asphalt Company | $2,548,799 | $3,366,011 | +32% | IDOT |
| 78A04 | Section D9 | District 09 | 3 | ERA-Valdivia Contractors, Inc. | $2,546,592 | $2,677,105 | +5.0% | IDOT |
| 62W37 | Section 2023-SWP-004(SC) | District 01 | 1 | Central Sweeping of Illinois, LLC | $2,240,150 | IDOT | ||
| 72289 | Section 1-3RS-2,1-4RS-1,1-5RS-3 | District 06 | 3 | Beniach Construction Co., Inc. | $2,199,312 | $2,653,931 | +21% | IDOT |
| 61K02 | Woodridge, section 19-00084-00-FP | District 01 | 7 | K-Five Construction Corporation | $2,045,192 | $2,257,046 | +10% | IDOT |
| 70871 | Section 28BR-1 | District 05 | 1 | Stark Excavating, Inc. | $1,987,717 | IDOT | ||
| 62T14 | Section FAP | District 01 | 9 | Martam Construction Incorporated | $1,864,923 | $1,937,461 | +4.0% | IDOT |
| 64S31 | Section (195-3B,195-3HB)BDR | District 02 | 3 | Martin & Company Excavating | $1,822,997 | $2,494,481 | +37% | IDOT |
| 61J70 | Lansing, section 23-00178-00-RS | District 01 | 4 | Iroquois Paving Corporation | $1,794,008 | $1,838,798 | +2.0% | IDOT |
| 72272 | Section (123,124,H)Q | District 06 | 3 | A. C. Pavement Striping Co. | $1,590,739 | $1,594,949 | 0.0% | IDOT |
| 62V10 | Section FAU | District 01 | 5 | P. T. Ferro Construction Co. | $1,559,449 | $1,569,896 | +1.0% | IDOT |
| 61K08 | Palatine, section 22-00112-00-RS | District 01 | 5 | Builders Paving, LLC | $1,540,000 | $1,540,000 | 0.0% | IDOT |
| 62T44 | Section FAU | District 01 | 5 | Martam Construction Incorporated | $1,458,158 | $1,788,574 | +23% | IDOT |
| 62T87 | Section FAP | District 01 | 2 | K-Five Construction Corporation | $1,441,856 | $1,473,878 | +2.0% | IDOT |
| 85747 | City Of Rock Island, section 19-00197-00-RS | District 02 | 3 | Valley Construction Co. | $1,389,515 | $1,455,555 | +5.0% | IDOT |
| 99725 | Project Number: Smd8-451 / /, section 18-00127-00-RS | District 09 | 2 | E. T. Simonds Construction Company | $1,388,323 | $1,454,454 | +5.0% | IDOT |
| 89829 | Macomb, section 21-00151-00-SW | District 04 | 2 | Laverdiere Construction, Inc. | $1,378,046 | $1,726,295 | +25% | IDOT |
| 66N34 | Section (108)SFY | District 03 | 3 | Kankakee Valley Construction Company, Inc. | $1,328,740 | $1,479,802 | +11% | IDOT |
| 62M52 | Section 2020-166-BR | District 01 | 4 | Martam Construction Incorporated | $1,269,651 | $1,581,060 | +25% | IDOT |
| 61J98 | Spring Grove, section 21-00018-00-RS | District 01 | 4 | Payne & Dolan, Inc. | $1,194,568 | $1,257,374 | +5.0% | IDOT |
| 74B28 | Section D7 | District 07 | 4 | Freesen, a div of UCM, Inc. | $1,145,239 | $1,211,641 | +6.0% | IDOT |
| 66N91 | Section 53(6HB-2,5B-1)BP-2 | District 03 | 4 | Venus Painting Co. | $1,109,544 | $1,127,604 | +2.0% | IDOT |
| 46640 | Section D2 | District 02 | 2 | P & P Construction Co. | $1,104,220 | $1,745,500 | +58% | IDOT |
| 68H68 | Section (10)RS-8 | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $1,098,547 | IDOT | ||
| 78830 | Section 9B-1 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,034,009 | $1,048,760 | +1.0% | IDOT |
| 93813 | Project Number: Gnpz-167 / /, section 19-00088-01-BR | District 06 | 4 | County Contractors, Inc. | $1,032,726 | $1,121,697 | +9.0% | IDOT |
| 97818 | Project Number: 0Jnh-764 / /, section 21-00108-00-RS | District 08 | 2 | The Kilian Corporation | $1,003,243 | $1,053,161 | +5.0% | IDOT |
| 99723 | Project Number: 7Ylx-091 / /, section 22-00072-00-RS | District 09 | 2 | Samron Midwest Contracting, Inc. | $994,695 | $1,074,421 | +8.0% | IDOT |
| 61K09 | Mount Prospect, section 23-00178-00-RS | District 01 | 5 | Builders Paving, LLC | $986,318 | $1,031,478 | +5.0% | IDOT |
| 72722 | Section D6 | District 06 | 2 | Kinney Contractors, Inc. | $952,289 | $997,412 | +5.0% | IDOT |
| 97824 | Granite City, section 19-00197-02-RS | District 08 | 3 | Hank's Excavating & Landscaping, Inc. | $938,631 | $974,062 | +4.0% | IDOT |
| 64S96 | Section D2 | District 02 | 1 | Northern Contracting, Inc. | $920,949 | IDOT | ||
| 74B27 | Section D7 | District 07 | 2 | Samron Midwest Contracting, Inc. | $918,918 | $1,010,759 | +10% | IDOT |
| 93750 | Pana, section 16-00054-00-BR | District 06 | 3 | Sangamo Construction Company | $910,055 | $1,298,983 | +43% | IDOT |
| 61J97 | Frankfort, section 22-00056-00-RS | District 01 | 7 | P. T. Ferro Construction Co. | $856,758 | $921,826 | +8.0% | IDOT |
| 66L53 | Section 30CR-2538 | District 03 | 4 | Sjostrom & Sons, Inc. | $854,727 | $900,900 | +5.0% | IDOT |
| 68H90 | Section D4 | District 04 | 2 | Northern Contracting, Inc. | $828,892 | $921,188 | +11% | IDOT |
| 89756 | Project Number: Hf33-993 / /, section 18-00113-00-BR | District 04 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $812,313 | $855,875 | +5.0% | IDOT |
| 85749 | Project Number: 5Sz7-521 / /, section 22-00185-13-PP | District 02 | 2 | W K Construction Company, Inc. | $796,419 | $806,694 | +1.0% | IDOT |
| 97769 | Collinsville, section 14-00101-00-PV | District 08 | 3 | DMS Contracting, Inc. | $778,107 | $801,426 | +3.0% | IDOT |
| 99715 | Project Number: Z2B5-507 / /, section 23-00048-00-RS | District 09 | 2 | Samron Midwest Contracting, Inc. | $769,769 | $795,598 | +3.0% | IDOT |
| 64S91 | Section (161-1HB-4,161-1HB-7)(195-2HB)BP | District 02 | 6 | Three Star Painting, Inc. | $765,000 | $791,318 | +3.0% | IDOT |
| 78A23 | Section D9 | District 09 | 3 | Beniach Construction Co., Inc. | $747,770 | $958,726 | +28% | IDOT |
| 76R91 | Section 60-8WS-1 | District 08 | 4 | Stutz Excavating, Inc. | $739,349 | $744,775 | +1.0% | IDOT |
| 61J95 | Wood Dale, section 20-00052-00-RS | District 01 | 6 | Builders Paving, LLC | $726,808 | $778,738 | +7.0% | IDOT |
| 74B32 | Section D7 | District 07 | 2 | Samron Midwest Contracting, Inc. | $674,674 | $726,642 | +8.0% | IDOT |
| 62R40 | Section FR | District 01 | 7 | Martam Construction Incorporated | $673,990 | $694,929 | +3.0% | IDOT |
| 66N48 | Section (32-3)K,PP-1 | District 03 | 3 | D. Construction, Inc. | $664,134 | $727,193 | +9.0% | IDOT |
| 99721 | Project Number: Ymxf-037 / /, section 20-00116-00-PP | District 09 | 2 | Illini Asphalt Corporation | $653,563 | $931,304 | +42% | IDOT |
| 64R56 | Section ILU | District 02 | 4 | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | $609,204 | $696,638 | +14% | IDOT |
| 62U80 | Section FAU | District 01 | 4 | A Lamp Concrete Contractors, Inc. | $591,675 | $598,000 | +1.0% | IDOT |
| 72293 | Section (B,N,O-15D)Q | District 06 | 3 | Beniach Construction Co., Inc. | $587,838 | $596,127 | +1.0% | IDOT |
| 66M09 | Section (108)CR-2507 | District 03 | 4 | Iroquois Paving Corporation | $568,073 | $611,076 | +8.0% | IDOT |
| 62W43 | Section 2023-921-SG,GM | District 01 | 1 | RoadSafe Traffic Systems, Inc. | $563,560 | IDOT | ||
| 62V27 | Section FAP | District 01 | 3 | ERA-Valdivia Contractors, Inc. | $545,765 | $584,000 | +7.0% | IDOT |
| 97803 | Fairview Heights, section 17-00042-02-RS | District 08 | 4 | Stutz Excavating, Inc. | $533,207 | $551,620 | +3.0% | IDOT |
| 68H78 | Section D4 | District 04 | 2 | All States Painting, Inc. | $533,130 | $569,875 | +7.0% | IDOT |
| 72720 | Section D6 | District 06 | 7 | Three Star Painting, Inc. | $501,200 | $546,421 | +9.0% | IDOT |
| 95936 | Project Number: 3Bml-437 / /, section 08-09133-00-BR | District 07 | 3 | C-Hill Civil Contractors, Inc. | $498,833 | $514,714 | +3.0% | IDOT |
| 87822 | Project Number: 0Wkf-381 / /, section 11-14106-03-BR | District 03 | 3 | Riber Construction, Inc. | $494,605 | $536,554 | +8.0% | IDOT |
| 62V26 | Section FAP | District 01 | 3 | ERA-Valdivia Contractors, Inc. | $486,011 | $657,700 | +35% | IDOT |
| 89828 | Aledo, section 22-00044-00-BT | District 04 | 6 | Fischer Excavating, Inc. | $483,905 | $527,495 | +9.0% | IDOT |
| 85748 | Project Number: Hyne-852 / /, section 21-01132-00-BR | District 02 | 3 | Sjostrom & Sons, Inc. | $474,974 | $475,776 | 0.0% | IDOT |
| 76T25 | Section 61-(1,1-1,1-2,2,3,3-1,4,5,5-1,6)PP | District 08 | 6 | Beniach Construction Co., Inc. | $461,857 | $463,712 | 0.0% | IDOT |
| 72728 | Section D6 | District 06 | 3 | County Contractors, Inc. | $433,493 | $459,000 | +6.0% | IDOT |
| 68H94 | Section (109G-BR)BRR | District 04 | 3 | County Contractors, Inc. | $407,324 | $467,437 | +15% | IDOT |
| 74B40 | Section D7 | District 07 | 3 | Samron Midwest Contracting, Inc. | $393,393 | $438,216 | +11% | IDOT |
| 99719 | Project Number: Nvxl-197 / /, section 19-01167-00-BR | District 09 | 2 | Dees, Inc. | $391,671 | $580,133 | +48% | IDOT |
| 62V05 | Section FAI | District 01 | 6 | Thor General Contracting LLC | $344,234 | $440,817 | +28% | IDOT |
| 99722 | Project Number: 1Mva-120 / /, section 19-00162-00-RS | District 09 | 2 | Samron Midwest Contracting, Inc. | $343,343 | $352,898 | +3.0% | IDOT |
| 85746 | Project Number: Ebil-868 / /, section 23-00393-00-RS | District 02 | 3 | Valley Construction Co. | $338,593 | $362,731 | +7.0% | IDOT |
| 61J82 | Highland Park, section 21-00142-00-TL | District 01 | 3 | Alliance Contractors, Inc. | $318,100 | $328,263 | +3.0% | IDOT |
| 70H00 | Section HMLT2024-1 | District 05 | 4 | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC | $279,850 | $498,579 | +78% | IDOT |
| 62V01 | Section FAI | District 01 | 6 | Thor General Contracting LLC | $277,027 | $354,754 | +28% | IDOT |
| 61J96 | City Of Mchenry, section 21-00091-00-RS | District 01 | 5 | Geske and Sons, Inc. | $255,964 | $271,442 | +6.0% | IDOT |
| 68I04 | Section D4 | District 04 | 4 | JIMAX Landscape LLC | $251,690 | $298,900 | +19% | IDOT |
| 70G87 | Section D5 | District 05 | 6 | G. M. Sipes Construction, Inc. | $231,036 | $233,042 | +1.0% | IDOT |
| 72283 | Section 87L | District 06 | 2 | Central Landscaping, LP | $229,957 | $343,439 | +49% | IDOT |
| 72723 | Section D6 | District 06 | 2 | Kinney Contractors, Inc. | $229,843 | $242,818 | +6.0% | IDOT |
| 62H58 | Section 2018-118-RS | District 01 | 5 | Austin Tyler Construction, Inc. | $211,505 | $233,568 | +10% | IDOT |
| 72036 | Section (84-3-1,2)CJS | District 06 | 4 | Kinney Contractors, Inc. | $210,848 | $237,743 | +13% | IDOT |
| 62W08 | Section FAI | District 01 | 6 | Thor General Contracting LLC | $208,500 | $236,700 | +14% | IDOT |
| 64S57 | Section D2 | District 02 | 5 | N-Trak Group LLC | $195,045 | $203,450 | +4.0% | IDOT |
| 76T30 | Section (53,54,55)PP | District 06 | 5 | G. M. Sipes Construction, Inc. | $189,044 | $200,886 | +6.0% | IDOT |
| 66N59 | Section (50-3)PCC,SR,DR | District 03 | 2 | D. Construction, Inc. | $156,145 | $185,652 | +19% | IDOT |
| 78A48 | Section D9 | District 09 | 3 | Endrizzi Contracting, Inc | $155,120 | $158,964 | +2.0% | IDOT |
| 70H03 | Section D5 | District 05 | 2 | The Daltons Inc. | $144,721 | $230,547 | +59% | IDOT |
| 62V04 | Section FAI | District 01 | 6 | Interstate Business Solutions, LLC | $143,366 | $153,066 | +7.0% | IDOT |
| 66P05 | Section 2024-1 | District 03 | 3 | The Daltons Inc. | $140,816 | $172,227 | +22% | IDOT |
| 66N94 | Section (31X)PP-2 | District 03 | 6 | A&A Concrete LLC | $126,426 | $139,710 | +11% | IDOT |
| 78A49 | Section D9 | District 09 | 3 | The Daltons Inc. | $126,182 | $145,396 | +15% | IDOT |
| 66P07 | Section LITTER | District 03 | 5 | The Final Connection, Inc. | $105,464 | $118,726 | +13% | IDOT |
| 64S84 | Section 1CR | District 02 | 3 | Hoerr Construction, Inc. | $101,460 | $127,230 | +25% | IDOT |
| 64S98 | Section D2 | District 02 | 2 | O'Brien Civil Works, Inc. | $98,300 | $408,000 | +315% | IDOT |
| 74B65 | Section D7 | District 07 | 2 | Dunn Company (Tyrolt Incorporated) | $95,255 | $194,941 | +105% | IDOT |
| 72616 | Section D6 | District 06 | 2 | All States Painting, Inc. | $89,290 | $143,750 | +61% | IDOT |
| 64S97 | Section KSR | District 02 | 5 | Phoenix Corporation of the Quad Cities | $79,978 | $80,954 | +1.0% | IDOT |
| 64S54 | Section D2 | District 02 | 3 | M & M Concrete, Inc. | $79,085 | $82,398 | +4.0% | IDOT |
| 64S47 | Section D2 | District 02 | 3 | Interstate Maintenance, Incorporated | $74,800 | $77,700 | +4.0% | IDOT |
| 76L82 | Section 60-1B-BDS-2 | District 08 | 3 | All States Painting, Inc. | $64,882 | $89,944 | +39% | IDOT |
| 64S42 | Section D2 | District 02 | 3 | All States Painting, Inc. | $63,880 | $83,600 | +31% | IDOT |
| 64S46 | Section D2 | District 02 | 3 | Interstate Maintenance, Incorporated | $59,200 | $59,940 | +1.0% | IDOT |
| 64S52 | Section D2 | District 02 | 4 | M & M Concrete, Inc. | $39,339 | $46,879 | +19% | IDOT |
| 64S53 | Section D2 | District 02 | 4 | M & M Concrete, Inc. | $21,142 | $23,960 | +13% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out.