Beniach Construction Co., Inc.: IDOT bid record

Beniach Construction Co., Inc. submitted 88 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 41 of them (47%). When it was not low, its total sat a median +12% above the low bid.

Owner
Illinois DOT
Low bid volume
$29,596,683
Latest bid
31 JUL 2026
Data through
18 SEP 2026
88Bids
41Low bids
47Win rate, percent
+12%Median gap to the low bid when not low, 47 bids

By year

YearBidsLow bidsWin rate
202112758%
2022141071%
202317953%
202413754%
202516425%
202616425%
Beniach Construction Co., Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 07281450%
District 05201470%
District 0614643%
District 03900%
District 048450%
District 085240%
District 02300%
District 0911100%
Beniach Construction Co., Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Tie bars 3/444213204EACH3420 (59%)$9.90$17.00
Trainees TPGZ0076604HR1515 (100%)$15.00$15.00
Cape seal40500061SY1813 (72%)$3.92$5.67
TraineesZ0076600HR1212 (100%)$0.80$0.80
Dowel bars 1 1/244201299EACH2511 (44%)$15.36$25.00
Micro-surf, single pass40400118SY1311 (85%)$2.68$3.37
Patch reinforcement44213000SY249 (38%)$61.95$70.00
SHRT TRM pavt MK rem70300150SF219 (43%)$2.72$1.20
Changeable message SN70107025CAL DAY578 (14%)$126.64$55.00
Bump removal40400020EACH148 (57%)$65.34$150.00
Traf cont-prot 70141170100420EACH118 (73%)$500.00$750.00
Fibr mod asp CRK seal40400001LF166 (38%)$0.59$0.75
Beniach Construction Co., Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Beniach Construction Co., Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202693860District 06Project Number: Numa-444 / /, section 25-00048-00-PP2 of 2$670,000+14%
12 JUN 202666T09District 03Section (WS)PP-24 of 4$542,666+40%
12 JUN 202666T29District 03Section (115,116)2 of 3$469,880+26%
12 JUN 202676U54District 08Section (107,108)RS-43 of 3$920,862+11%
12 JUN 202693858District 06Project Number: 4F1E-236 / /, section 24-00146-01-PP2 of 3$616,289+6.0%
24 APR 202664U85District 02Section (8R)PP4 of 4$1,105,869+96%
24 APR 202668K12District 04Section 90(6,7)RS-21 of 3$2,076,981Low, 18% under the second
24 APR 202670H82District 05Section CM2 of 4$519,579+9.0%
24 APR 202670H87District 05Section (74,10-70,71,73)I1 of 3$389,851Low, 28% under the second
24 APR 202674E19District 07Section D71 of 3$957,736Low, 16% under the second
24 APR 202674E20District 07Section D71 of 4$409,633Low, 4.0% under the second
24 APR 202674E24District 07Section (4,3)SR3 of 3$238,783+11%
24 APR 202676V10District 08Section 61-(1-1,1-2,2,3,3-1,4,5,5-1,6)PP-12 of 5$1,689,014+8.0%
16 JAN 202672383District 06Section 134Q3 of 3$1,195,557+87%
16 JAN 202672420District 06Section (F,DX)Q3 of 3$990,499+88%
16 JAN 202695989District 07Project Number: H4Qy-595 / /, section 25-00299-00-RS3 of 3$1,684,395+70%
19 SEP 202595983District 07Project Number: 4Un2-323 / /, section 20-02116-00-PV2 of 8$372,965+1.0%
01 AUG 202568K35District 04Section D43 of 3$695,640+11%
13 JUN 202566R52District 03Section (14R-17R)PP3 of 4$901,947+32%
13 JUN 202566R53District 03Section (128)PP3 of 5$620,716+9.0%
13 JUN 202566R54District 03Section (10,27,382 of 3$482,162+25%
13 JUN 202566R57District 03Section (116)PP3 of 5$576,708+20%
13 JUN 202574D43District 07Section D71 of 3$611,741Low, 13% under the second
25 APR 202570H42District 05Section D52 of 3$843,439+2.0%
25 APR 202570H54District 05Section (10-33,33)PP1 of 4$445,307Low, 10% under the second
Beniach Construction Co., Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.