IDOT contract 74E20 bid tabulation
Section D7. Let by Illinois DOT on April 24, 2026, Lawrence, District 07. 4 bids received; low bid $409,633 by Beniach Construction Co., Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 13
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Beniach Construction Co., Inc. | $409,633 | Low |
| 2 | G. M. Sipes Construction, Inc. | $424,845 | +4.0% |
| 3 | Kinney Contractors, Inc. | $601,885 | +47% |
| 4 | Samron Midwest Contracting, Inc. | $696,330 | +70% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Beniach Construction Co., Inc. | 2. G. M. Sipes Construction, Inc. | 3. Kinney Contractors, Inc. | 4. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Welded wire reinf (44200050) | SY | 872 | $17.00 | $0.01 | $20.00 | $23.50 |
| 2 | CL B patch T2 13 (44201007) | SY | 502 | $241.00 | $250.00 | $260.00 | $360.00 |
| 3 | CL B patch T3 13 (44201011) | SY | 331 | $237.00 | $245.00 | $258.00 | $350.00 |
| 4 | CL B patch T4 13 (44201013) | SY | 541 | $232.00 | $240.00 | $256.00 | $340.00 |
| 5 | Dowel bars 1 1/2 (44201299) | EACH | 1,684 | $15.00 | $25.00 | $29.00 | $30.00 |
| 6 | Saw cuts (44213200) | LF | 6,087 | $0.01 | $0.01 | $5.00 | $4.50 |
| 7 | Tie bars 3/4 (44213204) | EACH | 184 | $10.00 | $10.00 | $20.00 | $13.00 |
| 8 | Mobilization (67100100) | LS | 1 | $700.00 | $25,000 | $36,000 | $41,000 |
| 9 | Traf cont-prot 701411 (70100420) | EACH | 8 | $765.00 | $0.01 | $1,000.00 | $1,150.00 |
| 10 | Traf cont-prot 701201 (70100450) | LS | 1 | $3,054.00 | $8,000.00 | $14,000 | $16,000 |
| 11 | Traf cont-prot 701401 (70100800) | LS | 1 | $26,000 | $10,000 | $75,000 | $40,000 |
| 12 | Traf cont-prot 701456 (70100825) | LS | 1 | $1.00 | $0.01 | $4,000.00 | $3,000.00 |
| 13 | Changeable message SN (70107025) | CAL DAY | 56 | $122.00 | $25.00 | $180.00 | $104.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.