IDOT contract 70H54 bid tabulation
Section (10-33,33)PP. Let by Illinois DOT on April 25, 2025, Champaign, District 05. 4 bids received; low bid $445,307 by Beniach Construction Co., Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 14
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Beniach Construction Co., Inc. | $445,307 | Low |
| 2 | ICC Group Inc. | $488,600 | +10% |
| 3 | Kinney Contractors, Inc. | $507,559 | +14% |
| 4 | G. M. Sipes Construction, Inc. | $602,364 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Beniach Construction Co., Inc. | 2. ICC Group Inc. | 3. Kinney Contractors, Inc. | 4. G. M. Sipes Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Detour signing (X7200203) | LS | 1 | $23,250 | $50,000 | $20,000 | $25,000 |
| 2 | Construction layout (Z0013798) | LS | 1 | $2,500.00 | $4,000.00 | $4,000.00 | $2,000.00 |
| 3 | Welded wire reinf (44200050) | SY | 339 | $18.80 | $45.00 | $19.00 | $15.00 |
| 4 | CL B patch T2 15 (44201031) | SY | 690 | $305.00 | $300.00 | $294.00 | $375.00 |
| 5 | CL B patch T3 15 (44201035) | SY | 36 | $305.00 | $360.00 | $292.00 | $375.00 |
| 6 | CL B patch T4 15 (44201037) | SY | 303 | $295.00 | $290.00 | $290.00 | $370.00 |
| 7 | Dowel bars 1 1/2 (44201299) | EACH | 1,616 | $17.00 | $25.00 | $26.00 | $25.00 |
| 8 | Saw cuts (44213200) | LF | 3,830 | $0.01 | $3.25 | $7.00 | $6.95 |
| 9 | Tie bars 3/4 (44213204) | EACH | 70 | $10.00 | $15.00 | $20.00 | $20.00 |
| 10 | Mobilization (67100100) | LS | 1 | $10,000 | $24,298 | $30,500 | $30,000 |
| 11 | Traf cont-prot 701411 (70100420) | EACH | 8 | $832.00 | $1,500.00 | $1,600.00 | $2,750.00 |
| 12 | Traf cont-prot 701401 (70100800) | LS | 1 | $28,000 | $17,600 | $30,000 | $50,000 |
| 13 | Traf cont-prot 701451 (70100820) | LS | 1 | $24,000 | $1,200.00 | $25,000 | $5,000.00 |
| 14 | Changeable message SN (70107025) | CAL DAY | 42 | $131.00 | $60.00 | $175.00 | $250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.