IDOT contract 76V10 bid tabulation

Section 61-(1-1,1-2,2,3,3-1,4,5,5-1,6)PP-1. Let by Illinois DOT on April 24, 2026, Marion, District 08. 5 bids received; low bid $1,565,730 by G. M. Sipes Construction, Inc..

Owner
Illinois DOT
Letting
24 APR 2026
Pay items
14
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1G. M. Sipes Construction, Inc.$1,565,730Low
2Beniach Construction Co., Inc.$1,689,014+8.0%
3Kinney Contractors, Inc.$1,922,788+23%
4Samron Midwest Contracting, Inc.$2,188,114+40%
5Keeley & Sons, Inc.$2,434,328+55%
IDOT contract 76V10: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. G. M. Sipes Construction, Inc.2. Beniach Construction Co., Inc.3. Kinney Contractors, Inc.4. Samron Midwest Contracting, Inc.5. Keeley & Sons, Inc.
1CL A patch T2 13 SPL (X4420583)SY400$195.00$225.00$230.00$275.00$273.45
2CL A patch T3 13 SPL (X4420585)SY837$190.00$223.00$225.00$270.00$273.45
3CL A patch T4 13 SPL (X4420587)SY4,405$175.00$209.00$212.00$265.00$273.45
4Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00$15.00$15.00
5Patch reinforcement (44213000)SY5,643$60.00$48.00$66.00$39.00$59.80
6Saw cuts (44213200)LF15,790$0.01$0.01$1.00$5.00$6.65
7Tie bars 3/4 (44213204)EACH4,342$15.00$11.50$17.00$19.00$21.90
8Mobilization (67100100)LS1$93,000$4,500.00$60,000$129,000$137,650
9Traf cont-prot 701411 (70100420)EACH14$0.01$450.00$1,000.00$568.00$4,258.50
10Traf cont-prot 701406 (70100700)LS1$0.01$1.00$1,000.00$0.01$100.00
11Traf cont-prot 701401 (70100800)LS1$13,000$68,400$100,000$93,000$92,208
12Changeable message SN (70107025)CAL DAY320$0.01$124.00$65.00$96.00$55.08
13Paint PVT MK line 6 (78001130)LF5,459$3.12$3.70$3.40$2.00$2.35
14Raised refl pavt MKR (78100100)EACH172$92.57$97.00$100.00$97.00$110.16
IDOT contract 76V10: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy