Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company: IDOT bid record

Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company submitted 59 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 14 of them (24%). When it was not low, its total sat a median +12% above the low bid.

Owner
Illinois DOT
Low bid volume
$17,913,517
Latest bid
12 JUN 2026
Data through
18 SEP 2026
59Bids
14Low bids
24Win rate, percent
+12%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
202117529%
202211218%
20235120%
202410110%
20257114%
20269444%
Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 062329%
District 0410330%
District 059222%
District 087343%
District 075240%
District 032150%
District 09200%
District 0111100%
Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
SHRT TRM pavt MK rem70300150SF5234 (65%)$1.65$1.20
Raised refl pavt MKR78100100EACH4933 (67%)$35.90$48.00
Trainees TPGZ0076604HR2323 (100%)$15.00$15.00
TraineesZ0076600HR2323 (100%)$0.80$0.80
Changeable message SN70107025CAL DAY4022 (55%)$100.00$55.00
Mod ureth PM line 678009006LF1614 (88%)$1.02$1.90
Paint PVT MK line 478001110LF1414 (100%)$0.12$1.00
Fibr mod asp CRK seal40400001LF2512 (48%)$0.66$0.75
Mod ureth PM line 578009005LF1511 (73%)$0.85$1.10
THPL PVT MK line 678000400LF1211 (92%)$1.09$1.40
Mod ureth PM line 878009008LF1211 (92%)$1.36$2.25
Micro-surf, single pass40400118SY2510 (40%)$3.25$3.37
Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
A. C. Pavement Striping Co.5433 of 54
Beniach Construction Co., Inc.3224 of 32
Asphalt Stone Company147 of 14
Missouri Petroleum Products Company LLC138 of 13
Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202676U54District 08Section (107,108)RS-41 of 3$830,276Low, 4.0% under the second
12 JUN 202693858District 06Project Number: 4F1E-236 / /, section 24-00146-01-PP3 of 3$621,022+7.0%
24 APR 202668K12District 04Section 90(6,7)RS-23 of 3$2,551,608+23%
24 APR 202670H87District 05Section (74,10-70,71,73)I2 of 3$500,569+28%
27 FEB 202672469District 06Section (2,3)Q-21 of 2$739,077Low, 9.0% under the second
27 FEB 202676U42District 08Section 60-(7,8,9)RS-21 of 1$6,640,925Low
16 JAN 202672383District 06Section 134Q2 of 3$654,671+2.0%
16 JAN 202672420District 06Section (F,DX)Q2 of 3$562,370+7.0%
16 JAN 202695989District 07Project Number: H4Qy-595 / /, section 25-00299-00-RS1 of 3$989,466Low, 3.0% under the second
01 AUG 202576U65District 08Section 60-(30,31,128)RS-11 of 1$537,958Low
25 APR 202570H56District 05Section (74-3)I2 of 3$387,567+12%
25 APR 202574C50District 07Section D73 of 3$799,172+6.0%
07 MAR 202568J17District 04Section 118RS-4;119RS-53 of 3$2,230,870+37%
07 MAR 202570H33District 05Section (200)RS-4,(201)RS-22 of 3$1,039,749+4.0%
07 MAR 202576T83District 08Section 68R-1-(2,3,4)RS2 of 2$917,219+4.0%
07 MAR 202576T84District 08Section 21RS-42 of 2$467,881+12%
14 JUN 202474A65District 07Section D71 of 3$1,163,765Low, 11% under the second
26 APR 202466N40District 03Section (53-6)I-22 of 2$669,554+16%
26 APR 202472265District 06Section (107,108,109)Q2 of 2$1,833,568+39%
26 APR 202474C43District 07Section D72 of 2$453,457+38%
08 MAR 202468J00District 04Section (14,15,16)RS-5;14RS-63 of 3$2,237,154+28%
08 MAR 202470G74District 05Section 3RS-5&3 of 3$859,401+44%
19 JAN 202472272District 06Section (123,124,H)Q3 of 3$2,010,086+26%
19 JAN 202472289District 06Section 1-3RS-2,1-4RS-1,1-5RS-33 of 3$2,752,053+25%
19 JAN 202472293District 06Section (B,N,O-15D)Q3 of 3$726,789+24%
Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy