IDOT contract 74C50 bid tabulation
Section D7. Let by Illinois DOT on April 25, 2025, Cumberland, District 07. 3 bids received; low bid $754,086 by Beniach Construction Co., Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 17
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Beniach Construction Co., Inc. | $754,086 | Low |
| 2 | A. C. Pavement Striping Co. | $781,798 | +4.0% |
| 3 | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company | $799,172 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Beniach Construction Co., Inc. | 2. A. C. Pavement Striping Co. | 3. Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company |
|---|---|---|---|---|---|---|
| 1 | RR prot liability ins (Z0048665) | LS | 1 | $9,000.00 | $4,000.00 | $7,500.00 |
| 2 | Prot reset survey MRK (Z0049799) | EACH | 5 | $450.00 | $1,100.00 | $1,000.00 |
| 3 | Cape seal (40500061) | SY | 102,130 | $5.89 | $6.34 | $6.10 |
| 4 | Mobilization (67100100) | LS | 1 | $10,000 | $22,000 | $65,000 |
| 5 | Traf cont-prot 701306 (70100460) | LS | 1 | $44,500 | $18,000 | $10,000 |
| 6 | Changeable message SN (70107025) | CAL DAY | 28 | $128.00 | $140.00 | $115.00 |
| 7 | Short term pavt mking (70300100) | LF | 4,000 | $2.50 | $0.65 | $1.00 |
| 8 | SHRT TRM pavt MK rem (70300150) | SF | 1,335 | $2.70 | $5.00 | $2.50 |
| 9 | Temp PVT MK LTR & sym paint (70300211) | SF | 123 | $0.01 | $3.00 | $2.75 |
| 10 | Temp PVT MK line 4 - paint (70300221) | LF | 80,955 | $0.01 | $0.13 | $0.12 |
| 11 | Temp PVT MK line 24 - paint (70300281) | LF | 69 | $0.01 | $3.15 | $3.00 |
| 12 | THPL PVT MK LTR & sym (78000100) | SF | 123 | $5.15 | $4.75 | $4.50 |
| 13 | THPL PVT MK line 4 (78000200) | LF | 22,145 | $0.90 | $0.82 | $0.78 |
| 14 | THPL PVT MK line 24 (78000650) | LF | 69 | $5.40 | $5.00 | $4.75 |
| 15 | Paint PVT MK line 4 (78001110) | LF | 117,620 | $0.14 | $0.13 | $0.12 |
| 16 | Raised refl pavt MKR (78100100) | EACH | 512 | $41.00 | $37.46 | $35.68 |
| 17 | Raised ref PVT MK rem (78300200) | EACH | 495 | $21.00 | $14.00 | $35.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.