Section (74-3)I. Let by Illinois DOT on April 25, 2025, Piatt, District 05. 3 bids received; low bid $345,053 by Beniach Construction Co., Inc..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
19
Data through
18 SEP 2026

Bidders

IDOT contract 70H56: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Beniach Construction Co., Inc.2. Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company3. A. C. Pavement Striping Co.
1Temp rumble strips SP (X7010118)EACH16$2,500.00$1,950.00$1,900.00
2Real-time TR cont cbu (X7011854)CAL MO1$3,950.00$3,205.00$2,500.00
3Real-time TR cont SU (X7011856)CAL MO16$660.00$550.00$1,250.00
4Real-time TR con W SGN (X7011860)CAL MO8$1,150.00$950.00$1,320.00
5Construction layout (Z0013798)LS1$1,000.00$1.00$7,000.00
6Fibr mod asp CRK seal (40400001)LF40,304$0.62$0.40$0.95
7Micro-surf, single pass (40400118)SY13,435$5.90$6.88$13.47
8Bit matls tack CT (40600290)LB3,023$2.00$2.25$5.00
9Mobilization (67100100)LS1$10,000$46,000$25,000
10Traf cont-prot 701411 (70100420)EACH4$500.00$750.00$1,995.00
11Traf cont-prot 701401 (70100800)LS1$18,200$49,500$85,000
12Changeable message SN (70107025)CAL DAY14$210.00$175.00$310.00
13Short term pavt mking (70300100)LF4,031$2.50$4.65$0.89
14SHRT TRM pavt MK rem (70300150)SF1,344$9.00$10.75$10.00
15THPL PVT MK line 6 (78000400)LF10,076$1.60$1.40$1.95
16GRV RCSD PVT MRKG 7 (78011035)LF10,076$1.15$1.00$1.95
17Raised refl pavt MKR (78100100)EACH1,008$51.00$39.50$39.00
18Raised ref PVT MK rem (78300200)EACH1,008$20.00$9.75$20.00
19PVT MKG rem grinding (78300201)SF3,359$4.60$4.00$5.50
IDOT contract 70H56: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy