IDOT contract 76U65 bid tabulation

Section 60-(30,31,128)RS-1. Let by Illinois DOT on August 1, 2025, Madison, District 08. 1 bid received; low bid $537,958 by Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company.

Owner
Illinois DOT
Letting
01 AUG 2025
Pay items
23
Data through
18 SEP 2026

Bidders

IDOT contract 76U65: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company
1Part dep rem T2 2.5 (X4406225)SY140$110.00
2Part dep rem T4 2.5 (X4406625)SY360$60.00
3Partial depth patch (X4421000)TON72$290.00
4Fibr mod asp CRK seal (40400001)LF37,903$1.06
5Asph EM slurry seal (40400002)SY44,960$4.99
6Mobilization (67100100)LS1$50,000
7TR cont & prot 701606 (70102625)LS1$1,000.00
8TR cont & prot 701602 (70102632)LS1$40,000
9TR cont & prot 701701 (70102635)LS1$1,000.00
10Changeable message SN (70107025)CAL DAY112$50.00
11Short term pavt mking (70300100)LF4,110$1.25
12SHRT TRM pavt MK rem (70300150)SF1,375$3.50
13Temp PVT MK LTR & sym paint (70300211)SF900$2.00
14Temp PVT MK line 6 - paint (70300241)LF22,329$0.54
15Temp PVT MK line 12 - paint (70300261)LF455$1.00
16Temp PVT MK line 24 - paint (70300281)LF146$2.00
17THPL PVT MK LTR & sym (78000100)SF900$12.27
18THPL PVT MK line 6 (78000400)LF22,329$0.96
19THPL PVT MK line 12 (78000600)LF455$8.27
20THPL PVT MK line 24 (78000650)LF146$12.27
21Raised refl pavt MKR (78100100)EACH369$46.56
22Raised ref PVT MK rem (78300200)EACH341$65.00
23PVT MKG rem WTR blast (78300202)SF12,814$1.25
IDOT contract 76U65: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy