IDOT contract 76T83 bid tabulation

Section 68R-1-(2,3,4)RS. Let by Illinois DOT on March 7, 2025, Monroe, District 08. 2 bids received; low bid $879,340 by A. C. Pavement Striping Co..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
28
Data through
18 SEP 2026

Bidders

IDOT contract 76T83: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. A. C. Pavement Striping Co.2. Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company
1Centerln rum strip 8 (X6420112)LF2,759$3.50$3.11
2Paint curb (Z0036200)LF797$3.95$5.00
3Trainees (Z0076600)HR500$0.80$0.80
4Trainees TPG (Z0076604)HR500$15.00$15.00
5Fibr mod asp CRK seal (40400001)LF24,494$0.79$2.68
6Asph EM slurry seal (40400002)SY122,269$3.87$3.10
7Bit matls tack CT (40600290)LB27,510$1.00$2.00
8Mobilization (67100100)LS1$24,000$75,000
9TR cont & prot 701601 (70102630)LS1$1.00$1.00
10TR cont & prot 701602 (70102632)LS1$20,000$6,000.00
11TR cont & prot 701701 (70102635)LS1$1.00$1.00
12Changeable message SN (70107025)CAL DAY196$45.00$70.00
13Short term pavt mking (70300100)LF10,080$0.65$2.50
14SHRT TRM pavt MK rem (70300150)SF3,376$3.00$1.75
15Temp PVT MK LTR & sym paint (70300211)SF2,330$2.95$3.75
16Temp PVT MK line 6 - paint (70300241)LF93,548$0.28$0.13
17Temp PVT MK line 8 - paint (70300251)LF1,916$0.50$0.43
18Temp PVT MK line 12 - paint (70300261)LF1,265$0.75$0.64
19Temp PVT MK line 24 - paint (70300281)LF216$3.00$4.00
20THPL PVT MK LTR & sym (78000100)SF2,330$5.75$4.50
21THPL PVT MK line 6 (78000400)LF93,548$0.95$1.10
22THPL PVT MK line 8 (78000500)LF1,916$2.05$1.47
23THPL PVT MK line 12 (78000600)LF1,265$3.32$2.25
24THPL PVT MK line 24 (78000650)LF216$6.95$5.00
25Raised refl pavt MKR (78100100)EACH969$45.00$37.00
26Curb reflectors (78200020)EACH154$8.00$23.00
27Raised ref PVT MK rem (78300200)EACH969$12.00$32.00
28PVT MKG rem WTR blast (78300202)SF52,087$1.25$1.10
IDOT contract 76T83: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy