Feutz Contractors, Inc.: IDOT bid record

Feutz Contractors, Inc. submitted 32 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 11 of them (34%). When it was not low, its total sat a median +15% above the low bid.

Owner
Illinois DOT
Low bid volume
$14,450,706
Latest bid
31 JUL 2026
Data through
18 SEP 2026
32Bids
11Low bids
34Win rate, percent
+15%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
20213267%
20226117%
20235240%
20247229%
20259333%
20262150%
Feutz Contractors, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0518633%
District 0714536%
Feutz Contractors, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Detectable warnings42400800SF1913 (68%)$27.00$37.00
Sidewalk rem44000600SF207 (35%)$3.95$3.00
Comb curb gutter rem44000500LF186 (33%)$25.00$11.61
PC conc sidewalk 642400300SF126 (50%)$11.65$12.00
Perimeter eros bar28000400LF106 (60%)$3.70$3.50
PC conc sidewalk 542400200SF86 (75%)$13.25$10.00
Comb CC&G TB6.1260603800LF76 (86%)$64.00$42.50
Sign panel T172000100SF105 (50%)$43.50$31.00
Trainees TPGZ0076604HR55 (100%)$15.00$15.00
Storm sew CL A 1 12550A0050LF55 (100%)$75.00$93.00
Earth excavation20200100CY144 (29%)$49.75$48.00
Inlet & pipe protect28000500EACH144 (29%)$232.50$200.00
Feutz Contractors, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Feutz Contractors, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202646951District 05Section KICKAPOO1 of 2$4,107,350Low, 21% under the second
16 JAN 202691642District 05City Of Champaign, section 19-00314-00-PV2 of 4$9,768,318+16%
19 SEP 202595980District 07Bethany, section 18-00056-00-SW4 of 5$396,810+41%
19 SEP 202595983District 07Project Number: 4Un2-323 / /, section 20-02116-00-PV6 of 8$460,926+25%
19 SEP 202595988District 07Flora, section 24-00067-00-SW2 of 6$297,020+38%
13 JUN 202570E30District 05Section D52 of 3$1,188,828+7.0%
25 APR 202546945District 05Section WALNUT1 of 1$3,572,604Low
25 APR 202574D28District 07Section D71 of 5$528,441Low, 8.0% under the second
25 APR 202595969District 07Marshall, section 22-00061-00-SW1 of 3$394,399Low, 19% under the second
07 MAR 202570H55District 05Section (113)PP7 of 7$417,424+21%
07 MAR 202595971District 07Vandalia, section 22-00072-00-PV4 of 7$941,229+36%
08 NOV 202491630District 05Paris, section 23-00075-00-SW2 of 2$374,353+4.0%
20 SEP 202495911District 07Vandalia, section 19-00068-00-SW3 of 5$673,762+15%
02 AUG 202495943District 07Dieterich, section 22-00012-00-SW1 of 4$300,176Low, 28% under the second
14 JUN 202495958District 07Charleston, section 19-00118-00-WR3 of 3$4,715,547+11%
26 APR 202470D26District 05Section (14)I2 of 3$604,258+21%
26 APR 202474B47District 07Section D71 of 2$219,895Low, 32% under the second
19 JAN 202470G87District 05Section D55 of 6$281,873+22%
17 NOV 202391622District 05Danville, section 22-00368-00-PV1 of 3$1,636,078Low, 10% under the second
17 NOV 202395941District 07Sullivan, section 22-00038-00-SW2 of 6$294,258+2.0%
22 SEP 202370G86District 05Section D52 of 3$255,292+26%
04 AUG 202395927District 07City Of Marshall, section 18-00057-00-SW1 of 2$1,521,510Low, 60% under the second
16 JUN 202391624District 05Project Number: 0H1L-919 / /, section 22-00219-00-RS2 of 3$1,593,788+18%
05 AUG 202270C07District 05Section (1,119)DR2 of 2$1,895,007+10%
29 APR 202270F44District 05Section PARIS1 of 2$518,656Low, 19% under the second
Feutz Contractors, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy