Kieffer Bros. Construction Co., Inc. submitted 32 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 5 of them (16%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $4,652,868
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 9 | 1 | 11% |
| 2022 | 2 | 2 | 100% |
| 2023 | 2 | 1 | 50% |
| 2024 | 6 | 0 | 0% |
| 2025 | 8 | 1 | 13% |
| 2026 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 07 | 23 | 5 | 22% |
| District 09 | 8 | 0 | 0% |
| District 05 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Earth excavation | 20200100 | CY | 16 | 5 (31%) | $22.10 | $48.00 |
| Comb curb gutter rem | 44000500 | LF | 9 | 5 (56%) | $15.58 | $11.61 |
| Drive pavement rem | 44000200 | SY | 9 | 5 (56%) | $25.86 | $20.00 |
| Inlet & pipe protect | 28000500 | EACH | 7 | 5 (71%) | $119.78 | $200.00 |
| Rem exist struct | 50100100 | EACH | 9 | 4 (44%) | $17,013 | $50,000 |
| PCC driveway pavt 8 | 42300400 | SY | 5 | 4 (80%) | $93.00 | $100.00 |
| PCC driveway pavt 6 | 42300200 | SY | 5 | 4 (80%) | $87.98 | $100.00 |
| Agg surf course TY B | 40200800 | TON | 5 | 4 (80%) | $44.00 | $62.30 |
| Detectable warnings | 42400800 | SF | 11 | 3 (27%) | $37.10 | $37.00 |
| Pavement rem | 44000100 | SY | 11 | 3 (27%) | $22.90 | $20.30 |
| PC conc sidewalk 4 | 42400100 | SF | 9 | 3 (33%) | $11.40 | $12.47 |
| Trench backfill | 20800150 | CY | 6 | 3 (50%) | $61.50 | $55.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Samron Midwest Contracting, Inc. | 22 | 20 of 22 |
| E. T. Simonds Construction Company | 8 | 8 of 8 |
| Sierra Bravo Contractors, LLC | 6 | 5 of 6 |
| Shores Builders, Inc. | 6 | 3 of 6 |
| McCarthy Improvement Company | 6 | 3 of 6 |
| Feutz Contractors, Inc. | 5 | 3 of 5 |
| Kinney Contractors, Inc. | 4 | 2 of 4 |
| G. M. Sipes Construction, Inc. | 3 | 2 of 3 |
| C-Hill Civil Contractors, Inc. | 3 | 3 of 3 |
| Depew and Owen Builders, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 95996 | District 07 | Teutopolis, section 23-00022-00-PV | 5 of 5 | $324,055 | +18% |
| 16 JAN 2026 | 74D36 | District 07 | Section D7 | 4 of 5 | $268,091 | +35% |
| 16 JAN 2026 | 78A79 | District 09 | Section (97-2)R-1 | 3 of 3 | $9,586,060 | +70% |
| 16 JAN 2026 | 78B92 | District 09 | Section (112)I-2 | 3 of 4 | $345,396 | +75% |
| 16 JAN 2026 | 95990 | District 07 | Project Number: Bpca-404 / /, section 21-00133-00-BR | 3 of 3 | $969,508 | +21% |
| 19 SEP 2025 | 74D57 | District 07 | Section (26-0,1)MED | 8 of 8 | $1,789,231 | +108% |
| 19 SEP 2025 | 95988 | District 07 | Flora, section 24-00067-00-SW | 1 of 6 | $215,353 | Low, 38% under the second |
| 01 AUG 2025 | 99760 | District 09 | City Of Marion, section 23-00131-00-BT | 3 of 3 | $2,799,509 | +31% |
| 13 JUN 2025 | 70E30 | District 05 | Section D5 | 3 of 3 | $1,439,754 | +29% |
| 25 APR 2025 | 95969 | District 07 | Marshall, section 22-00061-00-SW | 2 of 3 | $470,129 | +19% |
| 07 MAR 2025 | 74A28 | District 07 | Section 3BR | 4 of 4 | $602,758 | +40% |
| 07 MAR 2025 | 78B01 | District 09 | Section 101N-1 | 3 of 3 | $1,418,358 | +115% |
| 17 JAN 2025 | 95968 | District 07 | Project Number: 785R-503 / /, section 21-00070-00-BR | 3 of 3 | $475,877 | +12% |
| 02 AUG 2024 | 95943 | District 07 | Dieterich, section 22-00012-00-SW | 2 of 4 | $382,806 | +28% |
| 02 AUG 2024 | 95963 | District 07 | Project Number: J6Fw-887 / /, section 21-07106-00-BR | 3 of 3 | $478,799 | +16% |
| 14 JUN 2024 | 74C79 | District 07 | Section D7 | 3 of 4 | $122,965 | +33% |
| 14 JUN 2024 | 78376 | District 09 | Section 9(I-3) | 4 of 4 | $1,123,702 | +39% |
| 26 APR 2024 | 74A85 | District 07 | Section D7 | 3 of 4 | $1,023,008 | +29% |
| 26 APR 2024 | 95954 | District 07 | Sumner, section 22-00005-00-SW | 2 of 2 | $305,578 | +5.0% |
| 17 NOV 2023 | 74C38 | District 07 | Section D7 | 3 of 3 | $309,062 | +39% |
| 22 SEP 2023 | 95938 | District 07 | Lawrenceville, section 22-00048-00-RS | 1 of 2 | $886,837 | Low, 26% under the second |
| 29 APR 2022 | 95905 | District 07 | Olney, section 18-00083-00-SW | 1 of 1 | $1,080,805 | Low |
| 21 JAN 2022 | 74860 | District 07 | Section (15BY)BR | 1 of 2 | $1,185,861 | Low, 2.0% under the second |
| 05 NOV 2021 | 74320 | District 07 | Section (12VR,2B)B | 2 of 2 | $1,053,855 | +13% |
| 05 NOV 2021 | 95822 | District 07 | City Of Effingham, section 16-00141-00-BT | 2 of 3 | $875,049 | +1.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.