Sierra Bravo Contractors, LLC: IDOT bid record
Sierra Bravo Contractors, LLC submitted 57 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 18 of them (32%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $15,562,757
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 14 | 3 | 21% |
| 2022 | 8 | 3 | 38% |
| 2023 | 10 | 2 | 20% |
| 2024 | 8 | 3 | 38% |
| 2025 | 11 | 6 | 55% |
| 2026 | 6 | 1 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 09 | 46 | 17 | 37% |
| District 07 | 8 | 1 | 13% |
| District 08 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Earth excavation | 20200100 | CY | 41 | 22 (54%) | $23.41 | $48.00 |
| Agr ground limestone | 25000700 | TON | 33 | 21 (64%) | $325.85 | $319.07 |
| Temp rumble strips | 70106700 | EACH | 22 | 19 (86%) | $787.50 | $937.50 |
| Nitrogen fert nutr | 25000400 | LB | 38 | 18 (47%) | $2.07 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 38 | 18 (47%) | $2.07 | $3.00 |
| Phosphorus fert nutr | 25000500 | LB | 38 | 18 (47%) | $2.07 | $3.00 |
| Seeding CL 7 | 25000350 | ACRE | 24 | 18 (75%) | $975.00 | $1,027.51 |
| Perimeter eros bar | 28000400 | LF | 33 | 15 (45%) | $5.39 | $3.50 |
| Filter fabric | 28200200 | SY | 33 | 13 (39%) | $3.43 | $4.65 |
| Temp eros contr seed | 28000250 | LB | 35 | 12 (34%) | $5.50 | $5.00 |
| Changeable message SN | 70107025 | CAL DAY | 43 | 11 (26%) | $88.00 | $55.00 |
| Mulch method 2 | 25100115 | ACRE | 23 | 11 (48%) | $3,831.90 | $2,805.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Samron Midwest Contracting, Inc. | 50 | 28 of 50 |
| E. T. Simonds Construction Company | 37 | 20 of 37 |
| Kieffer Bros. Construction Co., Inc. | 6 | 1 of 6 |
| Guinzy Construction,Inc. | 6 | 3 of 6 |
| DMS Contracting, Inc. | 3 | 3 of 3 |
| Stutz Excavating, Inc. | 3 | 3 of 3 |
| K. D. Crain and Sons, Inc. | 2 | 1 of 2 |
| Piney Creek Construction & Repair | 2 | 2 of 2 |
| Plocher Construction Company, Inc. | 2 | 1 of 2 |
| Baxmeyer Construction, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 78990 | District 09 | Section 106CR-1 | 2 of 2 | $556,487 | +3.0% |
| 24 APR 2026 | 78495 | District 09 | Section 11CR-1;12CR-1 | 3 of 4 | $875,923 | +32% |
| 24 APR 2026 | 78A24 | District 09 | Section 22SLP-3 | 2 of 3 | $1,187,135 | +81% |
| 16 JAN 2026 | 78A09 | District 09 | Section 127CR-1 | 3 of 3 | $1,294,688 | +35% |
| 16 JAN 2026 | 78B92 | District 09 | Section (112)I-2 | 2 of 4 | $199,999 | +1.0% |
| 16 JAN 2026 | 78C03 | District 09 | Section 8CR-1 | 1 of 3 | $449,516 | Low, 2.0% under the second |
| 07 NOV 2025 | 78813 | District 09 | 3 of 3 | $3,110,394 | +14% | |
| 07 NOV 2025 | 78B23 | District 09 | 2 of 3 | $913,006 | +20% | |
| 19 SEP 2025 | 78789 | District 09 | Section (28,29,100,101-2)SR-1,N-1 | 1 of 3 | $5,191,314 | Low, 4.0% under the second |
| 19 SEP 2025 | 99745 | District 09 | Project Number: V2Qj-332 / /, section 23-00110-00-DR | 2 of 3 | $300,674 | +18% |
| 01 AUG 2025 | 99284 | District 09 | Herrin, section 06-00054-00-FP | 3 of 4 | $2,228,117 | +8.0% |
| 13 JUN 2025 | 78399 | District 09 | Section 1CR-1;103CR-1;103CR-2 | 2 of 2 | $855,256 | +7.0% |
| 13 JUN 2025 | 78A15 | District 09 | Section 12CR-1 | 1 of 2 | $793,569 | Low, 30% under the second |
| 13 JUN 2025 | 78A97 | District 09 | Section (1R)SLP-1 | 1 of 3 | $170,723 | Low, 3.0% under the second |
| 13 JUN 2025 | 78B21 | District 09 | Section D9 | 1 of 4 | $880,649 | Low, 64% under the second |
| 07 MAR 2025 | 78844 | District 09 | Section 3CR-1;4CR-1 | 1 of 3 | $897,358 | Low, 1.0% under the second |
| 07 MAR 2025 | 78A91 | District 09 | Section 12-1(SLP-2,SR-1,GR-1) | 1 of 3 | $359,872 | Low, 3.0% under the second |
| 14 JUN 2024 | 76H70 | District 08 | Section 27BR-1 | 7 of 8 | $195,334 | +352% |
| 14 JUN 2024 | 78376 | District 09 | Section 9(I-3) | 1 of 4 | $810,944 | Low, 7.0% under the second |
| 14 JUN 2024 | 99734 | District 09 | Project Number: Sm67-223 / /, section 20-01212-00-BR | 3 of 3 | $500,000 | +29% |
| 26 APR 2024 | 74A85 | District 07 | Section D7 | 2 of 4 | $804,849 | +2.0% |
| 26 APR 2024 | 78825 | District 09 | Section 12SLP-1 | 1 of 2 | $508,955 | Low, 34% under the second |
| 26 APR 2024 | 78999 | District 09 | Section 109CR-1;102CR-1 | 3 of 3 | $499,521 | +47% |
| 26 APR 2024 | 95931 | District 07 | Project Number: Xcnx-049 / /, section 20-00130-00-BR | 2 of 2 | $1,389,446 | +8.0% |
| 08 MAR 2024 | 78948 | District 09 | Section 110CR-1 | 1 of 3 | $544,736 | Low, 2.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.