IDOT contract 78990 bid tabulation

Section 106CR-1. Let by Illinois DOT on September 18, 2026, Franklin, District 09. 2 bids received; low bid $539,518 by Samron Midwest Contracting, Inc..

Owner
Illinois DOT
Letting
18 SEP 2026
Pay items
49
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Samron Midwest Contracting, Inc.$539,518Low
2Sierra Bravo Contractors, LLC$556,487+3.0%
IDOT contract 78990: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Samron Midwest Contracting, Inc.2. Sierra Bravo Contractors, LLC
1Memb WTRPRF sys B STR (X5810103)SY107$35.00$49.50
2Traf cont-prot BLR 21 (X7011800)LS1$15,000$6,940.38
3Detour signing (X7200203)LS1$7,000.00$8,085.00
4Construction layout (Z0013798)LS1$7,500.00$10,500
5TS batt backup system (Z0033068)EACH1$0.01$0.01
6Rock fill - foundatn (Z0054517)TON135$55.00$50.42
7Tree remov 6-15 (20100110)UNIT58$55.00$101.26
8Tree remov over 15 (20100210)UNIT19$60.00$132.48
9Earth excavation (20200100)CY285$38.00$35.30
10Channel excavation (20300100)CY186$40.00$47.40
11Furnished excavation (20400800)CY231$40.00$79.44
12Porous gran embank (20700220)CY380$60.00$81.72
13Seeding CL 2 (25000200)ACRE0.16$18,500$22,969
14Seeding CL 7 (25000350)ACRE0.16$2,500.00$4,593.75
15Nitrogen fert nutr (25000400)LB30$2.00$5.25
16Phosphorus fert nutr (25000500)LB15$2.00$5.25
17Potassium fert nutr (25000600)LB15$2.00$5.25
18Agr ground limestone (25000700)TON0.30$400.00$525.00
19Erosion contr blanket (25100630)SY764$2.50$2.63
20Temp eros contr seed (28000250)LB16$2.00$9.92
21Perimeter eros bar (28000400)LF264$4.00$6.69
22Stone riprap CL A4 (28100107)SY59$100.00$81.99
23Stone riprap CL A5 (28100109)SY188$110.00$75.95
24Filter fabric (28200200)SY247$3.00$3.82
25Welded wire reinf (42000060)SY130$15.00$20.54
26PCC PVT 10 (42000500)SY130$200.00$249.91
27Pavement rem (44000100)SY130$15.00$46.51
28PCC shoulders 8 (48300300)SY30$200.00$537.69
29Rem exist struct N1 (50100300)EACH1$18,000$21,654
30Rem/disp uns matl-STR (50200450)CY90$24.00$37.43
31Reinf bars, epoxy CTD (50800205)LB3,740$2.50$3.25
32Conc box cul (54003000)CY38.40$2,200.00$3,077.41
33PCBC 12X8 (54011208)LF60$2,600.00$1,714.96
34Geocomposite wall DR (59100100)SY107$15.00$16.90
35Fur erect row markers (66600105)EACH10$250.00$457.45
36Engr field office A (67000400)CAL MO3$2,000.00$2,867.91
37Mobilization (67100100)LS1$32,000$33,286
38Traf cont-prot 701316 (70100100)EACH1$29,450$15,383
39Traf cont-prot 701201 (70100450)LS1$2,000.00$0.01
40TR cont surveillance (70103815)CAL DAY3$0.01$774.72
41Temp BR traf signals (70106500)EACH1$15,000$11,734
42Temp rumble strips (70106700)EACH6$1,350.00$761.25
43Changeable message SN (70107025)CAL DAY34$110.00$101.97
44Short term pavt mking (70300100)LF36$2.00$4.55
45SHRT TRM pavt MK rem (70300150)SF12$1.00$35.79
46Temp PVT MK line 4 - paint (70300221)LF774$0.01$4.83
47Paint PVT MK line 4 (78001110)LF774$5.00$4.83
48Raised ref PVT MK rem (78300200)EACH4$10.00$29.48
49PVT MKG rem grinding (78300201)SF258$0.01$14.70
IDOT contract 78990: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy