Baxmeyer Construction, Inc.: IDOT bid record

Baxmeyer Construction, Inc. submitted 61 bids on Illinois DOT contracts in the data, from 23 APR 2021 to 31 JUL 2026, and was the low bidder on 24 of them (39%). When it was not low, its total sat a median +10% above the low bid.

Owner
Illinois DOT
Low bid volume
$144,524,584
Latest bid
31 JUL 2026
Data through
18 SEP 2026
61Bids
24Low bids
39Win rate, percent
+10%Median gap to the low bid when not low, 37 bids

By year

YearBidsLow bidsWin rate
20216583%
20225360%
20236467%
202418633%
202514429%
202612217%
Baxmeyer Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 08522242%
District 09400%
District 073133%
District 062150%
Baxmeyer Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR4343 (100%)$15.00$15.00
TraineesZ0076600HR3939 (100%)$0.80$0.80
Trench backfill20800150CY4030 (75%)$39.50$55.00
Sidewalk rem44000600SF3625 (69%)$1.88$3.00
Comb curb gutter rem44000500LF3619 (53%)$12.25$11.61
Detectable warnings42400800SF3818 (47%)$45.35$37.00
Pavement rem44000100SY4515 (33%)$13.00$20.30
Mulch method 225100115ACRE3914 (36%)$3,700.00$2,805.00
Drive pavement rem44000200SY3314 (42%)$16.50$20.00
Aggregate-temp access40201000TON2914 (48%)$41.60$40.00
Storm sew CL A 1 12550A0050LF2214 (64%)$66.25$93.00
Pipe culvert remov50105220LF3413 (38%)$20.43$23.50
Baxmeyer Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Baxmeyer Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202646949District 08Section ELDON2 of 4$3,144,338+8.0%
31 JUL 202692621District 06Section (S,W)R-2,W-2,PB4 of 4$44,718,278+22%
31 JUL 202697866District 08Columbia, section 21-00053-01-PV4 of 4$1,235,468+15%
12 JUN 202695997District 07Vandalia, section 21-00070-00-SW4 of 5$1,996,040+21%
12 JUN 202697827District 08Project Number: K9Xl-969 / /, section 19-00276-07-PW2 of 3$910,220+40%
24 APR 202672N43District 06Section TIM1 of 3$13,405,307Low, 19% under the second
24 APR 202697865District 08Millstadt, section 21-00014-00-SW1 of 2$833,138Low, 29% under the second
24 APR 202697887District 08Mascoutah, section 24-00031-00-SW2 of 3$247,418+29%
27 FEB 202697872District 08Project Number: E181-096 / /, section 24-00301-26-PW2 of 3$4,700,3380.0%
27 FEB 202699757District 09Project Number: Mni4-133 / /, section 21-00164-00-PV3 of 3$2,004,777+17%
16 JAN 202674893District 07Section (25-1)R-BR4 of 4$35,774,168+9.0%
16 JAN 202697880District 08Columbia, section 23-00057-01-BT2 of 3$1,010,738+9.0%
19 SEP 202576F84District 08Section 60R-23 of 3$11,876,478+13%
19 SEP 202597868District 08Granite City, section 22-00200-00-SW2 of 5$684,638+12%
19 SEP 202597869District 08City Of Madison, section 19-00064-00-RS4 of 4$4,288,618+13%
19 SEP 202597874District 08Project Number: 2S5Z-990 / /, section 23-00008-00-PV4 of 5$2,807,718+9.0%
01 AUG 202597826District 08Maryville, section 20-00018-02-RS2 of 2$913,218+10%
01 AUG 202597863District 08Mascoutah, section 21-00028-00-BT1 of 2$1,251,808Low, 16% under the second
01 AUG 202599284District 09Herrin, section 06-00054-00-FP4 of 4$2,451,438+18%
13 JUN 202576K74District 08Section 82-7WRS-22 of 3$76,650,678+6.0%
13 JUN 202576U20District 08Section 1Q-12 of 2$119,448+12%
13 JUN 202576U39District 08Section (40,112)Q2 of 3$1,032,408+10%
25 APR 202597852District 08Jerseyville, section 22-00040-01-PV1 of 3$2,063,878Low, 1.0% under the second
07 MAR 202595971District 07Vandalia, section 22-00072-00-PV1 of 7$693,518Low, 18% under the second
07 MAR 202597856District 08Glen Carbon, section 23-00032-01-BT1 of 2$954,648Low, 5.0% under the second
Baxmeyer Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy