IDOT contract 97868 bid tabulation
Granite City, section 22-00200-00-SW. Let by Illinois DOT on September 19, 2025, Madison, District 08. 5 bids received; low bid $612,809 by Kinney Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 66
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kinney Contractors, Inc. | $612,809 | Low |
| 2 | Baxmeyer Construction, Inc. | $684,638 | +12% |
| 3 | RCS Construction, Inc. | $691,552 | +13% |
| 4 | Keller Construction, Inc. | $695,256 | +13% |
| 5 | Stutz Excavating, Inc. | $746,032 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kinney Contractors, Inc. | 2. Baxmeyer Construction, Inc. | 3. RCS Construction, Inc. | 4. Keller Construction, Inc. | 5. Stutz Excavating, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Relocate EX mailbox (X0327301) | EACH | 1 | $300.00 | $495.00 | $300.00 | $635.00 | $500.00 |
| 2 | Retaining wall remov (X5220102) | LF | 16 | $50.00 | $9.30 | $15.00 | $35.00 | $24.00 |
| 3 | Inlets SPL N1 (X6024242) | EACH | 6 | $2,500.00 | $2,538.00 | $4,861.87 | $4,520.00 | $5,740.00 |
| 4 | Plug existing pipe (X6050170) | CY | 1 | $400.00 | $1,363.00 | $400.00 | $565.00 | $700.00 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $50,500 | $111,530 | $20,000 | $4,125.00 | $20,350 |
| 6 | Earth excavation (20200100) | CY | 133 | $58.00 | $353.00 | $66.13 | $228.50 | $50.00 |
| 7 | Furnished excavation (20400800) | CY | 372 | $50.00 | $0.01 | $60.94 | $43.00 | $58.00 |
| 8 | Trench backfill (20800150) | CY | 228 | $62.00 | $40.60 | $72.51 | $51.50 | $85.50 |
| 9 | Seeding CL 2A (25000210) | ACRE | 0.25 | $9,000.00 | $29,390 | $15,000 | $12,360 | $14,450 |
| 10 | Nitrogen fert nutr (25000400) | LB | 23 | $5.00 | $7.05 | $1.00 | $44.10 | $5.00 |
| 11 | Phosphorus fert nutr (25000500) | LB | 23 | $5.00 | $7.05 | $1.00 | $44.10 | $5.00 |
| 12 | Potassium fert nutr (25000600) | LB | 23 | $5.00 | $7.05 | $1.00 | $44.10 | $5.00 |
| 13 | Mulch method 2 (25100115) | ACRE | 0.50 | $5,000.00 | $0.01 | $0.01 | $18,685 | $14,300 |
| 14 | Erosion contr blanket (25100630) | SY | 1,230 | $3.00 | $4.25 | $1.50 | $4.20 | $4.25 |
| 15 | Temp eros contr seed (28000250) | LB | 25 | $8.00 | $8.70 | $1.50 | $9.00 | $5.00 |
| 16 | Temp ditch checks (28000305) | LF | 19 | $20.00 | $38.00 | $20.00 | $31.00 | $25.00 |
| 17 | Perimeter eros bar (28000400) | LF | 415 | $4.50 | $12.70 | $3.50 | $10.00 | $7.00 |
| 18 | Inlet & pipe protect (28000500) | EACH | 21 | $220.00 | $294.20 | $125.00 | $300.00 | $40.00 |
| 19 | Stone dump rip CL A4 (28100707) | SY | 19 | $120.00 | $101.00 | $77.50 | $189.00 | $150.00 |
| 20 | Filter fabric (28200200) | SY | 19 | $4.50 | $35.00 | $3.00 | $48.50 | $11.00 |
| 21 | Aggregate-temp access (40201000) | TON | 50 | $45.00 | $77.00 | $100.00 | $95.00 | $35.00 |
| 22 | PCC driveway pavt 8 (42300400) | SY | 614 | $120.00 | $143.00 | $87.00 | $149.10 | $150.00 |
| 23 | PC conc sidewalk 4 (42400100) | SF | 8,876 | $9.00 | $8.20 | $13.50 | $8.25 | $9.25 |
| 24 | Detectable warnings (42400800) | SF | 77 | $56.00 | $43.90 | $50.00 | $64.50 | $25.00 |
| 25 | Pavement rem (44000100) | SY | 89 | $35.00 | $30.45 | $21.19 | $41.75 | $17.00 |
| 26 | Drive pavement rem (44000200) | SY | 381 | $25.00 | $30.00 | $21.13 | $36.35 | $19.00 |
| 27 | Curb rem (44000300) | LF | 120 | $20.00 | $23.60 | $15.93 | $15.80 | $28.00 |
| 28 | Comb curb gutter rem (44000500) | LF | 40 | $20.00 | $32.60 | $17.49 | $23.70 | $28.00 |
| 29 | Sidewalk rem (44000600) | SF | 140 | $4.00 | $3.25 | $6.78 | $12.85 | $5.50 |
| 30 | Paved ditch removal (44004000) | LF | 4 | $28.00 | $56.00 | $155.14 | $185.00 | $47.00 |
| 31 | CL C patch T1 8 (44201325) | SY | 3 | $260.00 | $460.35 | $140.00 | $1,060.00 | $275.00 |
| 32 | CL C patch T2 8 (44201329) | SY | 5 | $220.00 | $315.00 | $140.00 | $635.00 | $267.00 |
| 33 | CL C patch T4 8 (44201335) | SY | 174 | $215.00 | $151.00 | $140.00 | $340.00 | $181.00 |
| 34 | Pipe culvert remov (50105220) | LF | 209 | $25.00 | $28.00 | $10.00 | $23.25 | $29.00 |
| 35 | P cul CL D 1 12 (542D0217) | LF | 109 | $64.00 | $58.00 | $66.62 | $85.60 | $78.75 |
| 36 | P cul CL D 1 15 (542D0220) | LF | 62 | $75.00 | $64.00 | $71.00 | $88.80 | $84.00 |
| 37 | PRC flar end sec 12 (54213657) | EACH | 1 | $1,430.00 | $1,278.00 | $1,832.65 | $2,235.00 | $2,165.00 |
| 38 | PRC flar end sec 15 (54213660) | EACH | 4 | $1,630.00 | $1,457.00 | $2,102.56 | $2,435.00 | $2,485.00 |
| 39 | Storm sew CL A 1 12 (550A0050) | LF | 6 | $100.00 | $101.00 | $158.73 | $254.25 | $187.50 |
| 40 | Storm sew CL A 1 15 (550A0070) | LF | 164 | $104.00 | $71.50 | $110.92 | $114.00 | $131.00 |
| 41 | Storm sew CL A 1 18 (550A0090) | LF | 438 | $106.00 | $60.00 | $115.85 | $95.35 | $137.00 |
| 42 | Storm sew CL B 1 10 (550B0040) | LF | 40 | $80.00 | $46.00 | $114.43 | $97.55 | $135.00 |
| 43 | Storm sewer rem 12 (55100500) | LF | 13 | $25.00 | $30.00 | $184.28 | $110.50 | $217.50 |
| 44 | Storm sewer rem 15 (55100700) | LF | 98 | $21.00 | $30.00 | $128.47 | $35.75 | $151.75 |
| 45 | Dom wat ser box adj (56500600) | EACH | 2 | $600.00 | $471.00 | $100.00 | $420.00 | $500.00 |
| 46 | Man TA 4 dia T1F CL (60218400) | EACH | 3 | $4,500.00 | $2,860.00 | $6,709.70 | $3,935.00 | $7,920.00 |
| 47 | Man TA 6 dia T24F&G (60224039) | EACH | 1 | $5,600.00 | $5,650.00 | $8,586.89 | $6,460.00 | $10,140 |
| 48 | Inlets TA T1F OL (60234200) | EACH | 2 | $1,740.00 | $1,680.00 | $5,590.35 | $3,800.00 | $6,600.00 |
| 49 | Inlets TA T8G (60236200) | EACH | 3 | $1,580.00 | $1,680.00 | $5,833.45 | $4,150.00 | $6,890.00 |
| 50 | Inlets TA T11F&G (60236800) | EACH | 2 | $2,000.00 | $1,700.00 | $5,833.45 | $3,800.00 | $6,890.00 |
| 51 | Inlets TB T24F&G (60240328) | EACH | 1 | $2,960.00 | $2,028.00 | $6,355.09 | $4,185.00 | $7,500.00 |
| 52 | FR & lids adjust (60300305) | EACH | 5 | $700.00 | $730.00 | $1,863.29 | $1,310.00 | $1,100.00 |
| 53 | Remov inlets (60500060) | EACH | 1 | $600.00 | $589.00 | $2,207.33 | $575.00 | $2,600.00 |
| 54 | Conc curb TB (60600605) | LF | 55 | $100.00 | $140.00 | $70.00 | $99.75 | $102.00 |
| 55 | Comb CC&G TB6.12 (60603800) | LF | 1,259 | $53.00 | $54.00 | $75.00 | $47.85 | $67.50 |
| 56 | Comb CC&G TY B-6.24 (60605000) | LF | 139 | $85.00 | $131.00 | $55.00 | $87.15 | $102.50 |
| 57 | Comb CC&G TB9.12 (60605900) | LF | 74 | $85.00 | $142.00 | $70.00 | $79.80 | $93.00 |
| 58 | Mobilization (67100100) | LS | 1 | $40,000 | $40,328 | $40,000 | $50,650 | $35,650 |
| 59 | Sign panel T1 (72000100) | SF | 18 | $33.00 | $33.50 | $30.00 | $31.50 | $33.25 |
| 60 | Reloc sin pan assy TA (72400500) | EACH | 8 | $330.00 | $420.00 | $250.00 | $345.00 | $277.00 |
| 61 | Reloc sin pan assy TB (72400600) | EACH | 1 | $650.00 | $700.00 | $500.00 | $855.00 | $555.00 |
| 62 | Teles STL sin support (72800100) | LF | 32 | $26.00 | $37.00 | $33.25 | $35.00 | $37.00 |
| 63 | Paint PVT MK line 6 (78001130) | LF | 184 | $2.30 | $8.60 | $7.75 | $8.15 | $8.60 |
| 64 | Paint PVT MK line 12 (78001150) | LF | 52 | $14.00 | $18.00 | $16.25 | $17.05 | $18.00 |
| 65 | Paint PVT MK line 24 (78001180) | LF | 40 | $18.00 | $32.00 | $28.50 | $30.00 | $31.50 |
| 66 | PVT MKG rem grinding (78300201) | SF | 82 | $3.00 | $12.00 | $10.50 | $11.00 | $11.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.