Keller Construction, Inc.: IDOT bid record

Keller Construction, Inc. submitted 62 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 17 of them (27%). When it was not low, its total sat a median +13% above the low bid.

Owner
Illinois DOT
Low bid volume
$53,818,263
Latest bid
18 SEP 2026
Data through
18 SEP 2026
62Bids
17Low bids
27Win rate, percent
+13%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
202111436%
20227114%
202312325%
202411218%
202515640%
20266117%
Keller Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 08511529%
District 066117%
District 074125%
District 09100%
Keller Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR3636 (100%)$15.00$15.00
TraineesZ0076600HR3434 (100%)$0.80$0.80
Sign panel T172000100SF2617 (65%)$34.00$31.00
Bit matls tack CT40600290LB3312 (36%)$3.64$0.01
Mulch method 225100115ACRE2812 (43%)$4,455.00$2,805.00
Paint PVT MK line 478001110LF2012 (60%)$1.35$1.00
Earth excavation20200100CY4011 (28%)$36.52$48.00
Inlet & pipe protect28000500EACH2911 (38%)$175.00$200.00
Teles STL sin support72800100LF2211 (50%)$20.74$19.50
Comb CC&G TY B-6.2460605000LF2011 (55%)$41.45$58.00
Temp eros contr seed28000250LB2910 (34%)$6.35$5.00
Bit matls PR CT40600275LB2310 (43%)$1.28$0.01
Keller Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Keller Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202697894District 08Belleville, section 22-00176-06-RS5 of 5$5,253,087+27%
31 JUL 202646949District 08Section ELDON4 of 4$3,347,775+15%
12 JUN 202697896District 08Worden, section 24-00013-00-SW3 of 3$452,639+53%
16 JAN 202676A46District 08Section 51-1R1 of 2$17,570,642Low, 22% under the second
16 JAN 202697880District 08Columbia, section 23-00057-01-BT3 of 3$1,160,914+25%
16 JAN 202697883District 08Edwardsville, section 23-00111-05-BT3 of 3$1,169,206+3.0%
19 SEP 202576F84District 08Section 60R-22 of 3$11,697,744+11%
19 SEP 202597833District 08Collinsville, section 19-00095-01-PV1 of 2$2,218,364Low, 1.0% under the second
19 SEP 202597868District 08Granite City, section 22-00200-00-SW4 of 5$695,256+13%
19 SEP 202597869District 08City Of Madison, section 19-00064-00-RS3 of 4$4,051,000+7.0%
19 SEP 202597874District 08Project Number: 2S5Z-990 / /, section 23-00008-00-PV2 of 5$2,568,0060.0%
13 JUN 202597848District 08Shiloh, section 20-00021-00-PV3 of 3$1,771,884+21%
13 JUN 202597870District 08Troy, section 21-00036-00-BT2 of 2$770,728+13%
25 APR 202597852District 08Jerseyville, section 22-00040-01-PV2 of 3$2,081,088+1.0%
25 APR 202597858District 08Greenville, section 24-00046-01-SW1 of 1$449,364Low
25 APR 202597862District 08Godfrey, section 19-00001-05-PV1 of 2$1,917,545Low, 11% under the second
07 MAR 202595971District 07Vandalia, section 22-00072-00-PV2 of 7$816,800+18%
07 MAR 202597793District 08Glen Carbon, section 19-00025-01-PW1 of 1$1,439,471Low
07 MAR 202597856District 08Glen Carbon, section 23-00032-01-BT2 of 2$1,000,000+5.0%
17 JAN 202597843District 08Glen Carbon, section 21-00031-00-RS1 of 2$949,494Low, 4.0% under the second
17 JAN 202597853District 08Edwardsville, section 21-00111-02-BT1 of 4$531,755Low, 3.0% under the second
08 NOV 202497372District 08Project Number: Smtq-413 / /, section 95-00301-03-PV4 of 4$15,213,456+12%
08 NOV 202497846District 08Edwardsville, section 20-00109-01-BR1 of 1$3,435,037Low
02 AUG 202476818District 08Section 60-3K-12 of 2$31,253,052+24%
02 AUG 202497837District 08Lebanon, section 15-00023-00-PV4 of 4$1,028,602+18%
Keller Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy