IDOT contract 97858 bid tabulation
Greenville, section 24-00046-01-SW. Let by Illinois DOT on April 25, 2025, Bond, District 08. 1 bid received; low bid $449,364 by Keller Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 23
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keller Construction, Inc. | $449,364 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keller Construction, Inc. |
|---|---|---|---|---|
| 1 | Drainage structure SP (XX005472) | EACH | 7 | $6,520.00 |
| 2 | Earth exc soil MGMT (XX008958) | LS | 1 | $38,000 |
| 3 | San service cleanout (X1200036) | EACH | 1 | $1,250.00 |
| 4 | Seeding CL 1 SPL (X2500900) | ACRE | 0.75 | $24,622 |
| 5 | Rem & rel SN P&P assy (X2600012) | EACH | 3 | $325.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $4,500.00 |
| 7 | Rel EX LP W/luminaire (X8440110) | EACH | 2 | $11,088 |
| 8 | Tree remov 6-15 (20100110) | UNIT | 41 | $198.50 |
| 9 | Tree remov over 15 (20100210) | UNIT | 63 | $204.00 |
| 10 | Perimeter eros bar (28000400) | LF | 1,920 | $4.40 |
| 11 | PCC driveway pavt 6 (42300200) | SY | 120 | $161.70 |
| 12 | PC conc sidewalk 4 (42400100) | SF | 9,067 | $8.20 |
| 13 | PC conc sidewalk 6 (42400300) | SF | 1,141 | $11.40 |
| 14 | Detectable warnings (42400800) | SF | 90 | $65.25 |
| 15 | Drive pavement rem (44000200) | SY | 261 | $46.80 |
| 16 | Comb curb gutter rem (44000500) | LF | 527 | $28.50 |
| 17 | Sidewalk rem (44000600) | SF | 156 | $17.00 |
| 18 | Fire hydnt & val MVD (56400800) | EACH | 3 | $15,320 |
| 19 | Dom met VLTS adj (56500300) | EACH | 4 | $1,190.00 |
| 20 | Comb CC&G TM6.12 aep (60609300) | LF | 413 | $90.30 |
| 21 | Comb CC&G TM6.12 VWGF (60609700) | LF | 76 | $107.10 |
| 22 | Mobilization (67100100) | LS | 1 | $46,500 |
| 23 | Paint PVT MK line 6 (78001130) | LF | 237 | $15.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.