IDOT contract 97852 bid tabulation
Jerseyville, section 22-00040-01-PV. Let by Illinois DOT on April 25, 2025, Jersey, District 08. 3 bids received; low bid $2,063,878 by Baxmeyer Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 58
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Baxmeyer Construction, Inc. | $2,063,878 | Low |
| 2 | Keller Construction, Inc. | $2,081,088 | +1.0% |
| 3 | Stutz Excavating, Inc. | $2,272,532 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Baxmeyer Construction, Inc. | 2. Keller Construction, Inc. | 3. Stutz Excavating, Inc. |
|---|---|---|---|---|---|---|
| 1 | Seeding SPL (K1005421) | ACRE | 1.10 | $22,300 | $25,000 | $17,250 |
| 2 | Prec inlet SPL 4 open (XX009584) | EACH | 22 | $3,625.00 | $5,900.00 | $3,226.00 |
| 3 | Prec inlet SPL 8 open (XX009585) | EACH | 1 | $7,150.00 | $14,000 | $6,080.00 |
| 4 | Prec inlet SPL 5 open (XX009708) | EACH | 9 | $4,700.00 | $7,100.00 | $4,345.00 |
| 5 | Pro SS conn to EX SS (X0322916) | EACH | 3 | $1,585.00 | $2,240.00 | $1,400.00 |
| 6 | Relocate EX mailbox (X0327301) | EACH | 10 | $675.00 | $425.00 | $420.00 |
| 7 | Remove exist riprap (X2810844) | SY | 465 | $10.25 | $22.00 | $20.00 |
| 8 | Storm sew connection (X5510010) | EACH | 20 | $1,600.00 | $615.00 | $870.00 |
| 9 | Engr FLD off A SPL (X6700410) | CAL MO | 8 | $4,550.00 | $2,100.00 | $2,700.00 |
| 10 | Traf cont & prot SPL (X7010216) | LS | 1 | $23,500 | $57,000 | $21,500 |
| 11 | Construction layout (Z0013798) | LS | 1 | $16,500 | $23,970 | $28,885 |
| 12 | SS 2 wat MN 24 (Z0056672) | LF | 143 | $175.00 | $132.00 | $174.00 |
| 13 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 14 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 15 | Earth excavation (20200100) | CY | 4,002 | $39.00 | $30.00 | $44.85 |
| 16 | Trench backfill (20800150) | CY | 555 | $39.50 | $54.00 | $69.00 |
| 17 | Mulch method 2 (25100115) | ACRE | 2.20 | $3,700.00 | $1,500.00 | $3,380.00 |
| 18 | Temp eros contr seed (28000250) | LB | 220 | $5.50 | $3.00 | $5.00 |
| 19 | Perimeter eros bar (28000400) | LF | 2,795 | $8.00 | $3.90 | $5.25 |
| 20 | Inlet & pipe protect (28000500) | EACH | 29 | $220.00 | $90.00 | $250.00 |
| 21 | Stone riprap CL A3 (28100105) | SY | 200 | $62.00 | $37.00 | $38.50 |
| 22 | Stone riprap CL A4 (28100107) | SY | 96 | $97.00 | $65.00 | $61.00 |
| 23 | Filter fabric (28200200) | SY | 296 | $5.50 | $8.00 | $4.25 |
| 24 | Process mod soil 12 (30200650) | SY | 7,168 | $3.25 | $3.50 | $6.50 |
| 25 | Portland cement (30201700) | TON | 213 | $252.00 | $250.00 | $256.00 |
| 26 | Agg base cse A 4 (35100300) | SY | 11,463 | $11.15 | $9.50 | $7.95 |
| 27 | Agg base cse B 6 (35101800) | SY | 66 | $27.25 | $17.00 | $17.00 |
| 28 | Aggregate-temp access (40201000) | TON | 120 | $61.75 | $75.00 | $45.00 |
| 29 | HMA BC IL-19.0 N50 (40603080) | TON | 47 | $250.00 | $224.21 | $233.00 |
| 30 | HMA SC IL-9.5 D N50 (40604060) | TON | 16 | $375.00 | $338.87 | $345.00 |
| 31 | Bit matls PR CT (40800025) | LB | 35 | $0.01 | $0.01 | $10.00 |
| 32 | Bit matls tack CT (40800029) | LB | 7 | $3.75 | $3.17 | $35.00 |
| 33 | PCC PVT 8 (42000300) | SY | 7,218 | $65.25 | $72.50 | $74.75 |
| 34 | PCC driveway pavt 6 (42300200) | SY | 1,274 | $109.00 | $96.00 | $93.25 |
| 35 | PC conc sidewalk 4 (42400100) | SF | 11,112 | $6.25 | $8.25 | $7.40 |
| 36 | Detectable warnings (42400800) | SF | 77 | $40.00 | $53.50 | $54.00 |
| 37 | Pavement rem (44000100) | SY | 918 | $8.15 | $14.50 | $21.25 |
| 38 | Drive pavement rem (44000200) | SY | 520 | $16.50 | $28.00 | $22.50 |
| 39 | Sidewalk rem (44000600) | SF | 78 | $3.00 | $8.00 | $5.25 |
| 40 | Pipe culvert remov (50105220) | LF | 1,019 | $20.50 | $16.00 | $27.00 |
| 41 | Box cul end sec C1 (54001001) | EACH | 1 | $16,135 | $16,500 | $14,880 |
| 42 | PCBC 4X3 (54010403) | LF | 4 | $1,680.00 | $1,450.00 | $1,925.00 |
| 43 | Conc ES 542001 36 1:2 (54261236) | EACH | 1 | $7,885.00 | $9,100.00 | $7,150.00 |
| 44 | Conc ES 542011 36 1:2 (54263236) | EACH | 1 | $8,050.00 | $8,700.00 | $6,775.00 |
| 45 | Storm sew CL A 2 15 (550A0360) | LF | 1,222 | $73.00 | $60.00 | $94.75 |
| 46 | Storm sew CL A 2 18 (550A0380) | LF | 333 | $80.00 | $61.00 | $115.00 |
| 47 | Storm sew CL A 2 24 (550A0410) | LF | 391 | $107.25 | $85.00 | $148.00 |
| 48 | Storm sew CL A 2 30 (550A0430) | LF | 543 | $144.00 | $120.00 | $173.50 |
| 49 | Storm sew CL A 2 36 (550A0450) | LF | 79 | $179.00 | $145.00 | $214.00 |
| 50 | SS CL A 2 eqrs 36 (550A5300) | LF | 12 | $455.00 | $450.00 | $656.00 |
| 51 | Inlets TA T8G (60236200) | EACH | 2 | $1,875.00 | $3,150.00 | $1,542.00 |
| 52 | Remov inlets (60500060) | EACH | 2 | $525.00 | $375.00 | $450.00 |
| 53 | Comb CC&G TY B-6.24 (60605000) | LF | 4,797 | $40.00 | $17.50 | $39.00 |
| 54 | Mobilization (67100100) | LS | 1 | $45,920 | $142,031 | $143,300 |
| 55 | Reloc sin pan assy TA (72400500) | EACH | 3 | $255.00 | $250.00 | $630.00 |
| 56 | Mod ureth PM line 4 (78009004) | LF | 590 | $11.50 | $10.00 | $1.90 |
| 57 | Mod ureth PM line 12 (78009012) | LF | 246 | $34.75 | $30.50 | $6.90 |
| 58 | Mod ureth PM line 24 (78009024) | LF | 12 | $69.50 | $60.50 | $29.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.