Stutz Excavating, Inc. submitted 97 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 39 of them (40%). When it was not low, its total sat a median +11% above the low bid.

Owner
Illinois DOT
Low bid volume
$54,932,993
Latest bid
18 SEP 2026
Data through
18 SEP 2026
97Bids
39Low bids
40Win rate, percent
+11%Median gap to the low bid when not low, 58 bids

By year

YearBidsLow bidsWin rate
202123730%
2022900%
202316956%
202422836%
202517847%
202610770%
Stutz Excavating, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 08793342%
District 0614321%
District 073267%
District 0911100%
Stutz Excavating, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR4444 (100%)$15.00$15.00
TraineesZ0076600HR4242 (100%)$0.80$0.80
Inlet & pipe protect28000500EACH5029 (58%)$164.00$200.00
Bit matls tack CT40600290LB4825 (52%)$1.88$0.01
Earth excavation20200100CY5723 (40%)$42.35$48.00
Pavement rem44000100SY5022 (44%)$17.88$20.30
Aggregate-temp access40201000TON3822 (58%)$40.30$40.00
Detectable warnings42400800SF4518 (40%)$57.10$37.00
Short term pavt mking70300100LF3317 (52%)$2.05$1.01
Drive pavement rem44000200SY4716 (34%)$20.00$20.00
Temp eros contr seed28000250LB4515 (33%)$5.00$5.00
Comb curb gutter rem44000500LF4015 (38%)$15.00$11.61
Stutz Excavating, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Stutz Excavating, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202676V43District 08Section DIST1 of 4$2,175,825Low, 21% under the second
12 JUN 202676R32District 08Section 1-BR-11 of 2$4,611,184Low, 37% under the second
12 JUN 202676V06District 08Section DIST2 of 3$1,363,061+79%
12 JUN 202697884District 08Godfrey, section 23-00036-00-RS1 of 2$1,096,234Low, 23% under the second
12 JUN 202697896District 08Worden, section 24-00013-00-SW1 of 3$295,673Low, 11% under the second
24 APR 202676U75District 08Section 76I3 of 3$121,978+27%
27 FEB 202697882District 08Granite City, section 21-00189-01-RS1 of 2$2,795,529Low, 3.0% under the second
16 JAN 202697876District 08Collinsville, section 22-00098-02-SP2 of 3$856,243+8.0%
16 JAN 202697881District 08East Alton, section 22-00053-00-RS1 of 3$1,254,922Low, 2.0% under the second
16 JAN 202697883District 08Edwardsville, section 23-00111-05-BT1 of 3$1,135,167Low, 1.0% under the second
19 SEP 202576F84District 08Section 60R-21 of 3$10,524,883Low, 11% under the second
19 SEP 202597833District 08Collinsville, section 19-00095-01-PV2 of 2$2,235,097+1.0%
19 SEP 202597868District 08Granite City, section 22-00200-00-SW5 of 5$746,032+22%
19 SEP 202597869District 08City Of Madison, section 19-00064-00-RS1 of 4$3,789,307Low, 1.0% under the second
19 SEP 202597874District 08Project Number: 2S5Z-990 / /, section 23-00008-00-PV3 of 5$2,637,426+3.0%
01 AUG 202597826District 08Maryville, section 20-00018-02-RS1 of 2$829,420Low, 10% under the second
13 JUN 202593828District 06Project Number: U881-385 / /, section 21-00107-00-BR2 of 2$1,643,431+8.0%
13 JUN 202597834District 08Belleville, section 18-00213-01-RS1 of 2$531,515Low, 20% under the second
13 JUN 202597848District 08Shiloh, section 20-00021-00-PV1 of 3$1,468,668Low, 9.0% under the second
13 JUN 202597870District 08Troy, section 21-00036-00-BT1 of 2$683,304Low, 13% under the second
25 APR 202597839District 08Edwardsville, section 21-00115-00-RS2 of 2$624,695+2.0%
25 APR 202597852District 08Jerseyville, section 22-00040-01-PV3 of 3$2,272,532+10%
25 APR 202597862District 08Godfrey, section 19-00001-05-PV2 of 2$2,134,685+11%
17 JAN 202576P16District 08Section 1W-11 of 2$1,403,493Low, 18% under the second
17 JAN 202593803District 06Project Number: V2L4-333 / /, section 20-00145-00-PV2 of 2$535,296+4.0%
Stutz Excavating, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy