IDOT contract 76F84 bid tabulation
Section 60R-2. Let by Illinois DOT on September 19, 2025, Madison, District 08. 3 bids received; low bid $10,524,883 by Stutz Excavating, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 190
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stutz Excavating, Inc. | $10,524,883 | Low |
| 2 | Keller Construction, Inc. | $11,697,744 | +11% |
| 3 | Baxmeyer Construction, Inc. | $11,876,478 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stutz Excavating, Inc. | 2. Keller Construction, Inc. | 3. Baxmeyer Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | S-buxus sempervirens 2 gal (C2C01026) | EACH | 172 | $57.60 | $90.00 | $135.00 |
| 2 | P PL ornament T gal P (K0012990) | UNIT | 10 | $2,035.00 | $6,800.00 | $4,620.00 |
| 3 | Mulch placement 3 (K0036118) | SY | 736 | $12.00 | $27.00 | $32.00 |
| 4 | Plant watering (K1004539) | UNIT | 14 | $1,040.00 | $1,400.00 | $1,635.00 |
| 5 | Weed barrier fabric (X0321501) | SY | 736 | $4.30 | $33.00 | $3.25 |
| 6 | Pavt color & texture SPL (X0327068) | SY | 1,483 | $25.00 | $44.43 | $225.00 |
| 7 | Relocate EX mailbox (X0327301) | EACH | 1 | $250.00 | $4,850.00 | $500.00 |
| 8 | Mailbox rem & repl (X0327902) | EACH | 11 | $350.00 | $760.00 | $650.00 |
| 9 | Inlet box adj SPL (X0931400) | EACH | 3 | $1,170.00 | $799.24 | $1,000.00 |
| 10 | Conn EX DRG structure (X1200160) | EACH | 2 | $1,875.00 | $1,826.93 | $2,375.00 |
| 11 | Grading & shaping SPL (X2020108) | SY | 47 | $50.00 | $23.00 | $50.00 |
| 12 | PLNTG soil mix F&P 12 (X2111212) | SY | 736 | $23.70 | $60.00 | $34.50 |
| 13 | Temp pavt removal (X4400110) | SY | 3,695 | $10.00 | $8.40 | $26.50 |
| 14 | HMA surf rem var DP (X4401198) | SY | 1,328 | $5.60 | $10.46 | $12.25 |
| 15 | Island removal (X4402805) | SF | 470 | $8.50 | $7.40 | $4.50 |
| 16 | Temp SS CL A 2 24 (X550A576) | LF | 444 | $130.00 | $187.50 | $129.50 |
| 17 | Connect EX manhole (X6020399) | EACH | 1 | $1,875.00 | $1,826.95 | $3,400.00 |
| 18 | Temp man TA 4D T1F OL (X6028104) | EACH | 2 | $3,004.00 | $4,565.16 | $4,225.00 |
| 19 | Comb CC&G transition (X6060034) | LF | 153 | $55.50 | $175.37 | $207.50 |
| 20 | Comb CC&G TM2.12 mod (X6060077) | LF | 203 | $53.65 | $130.12 | $147.00 |
| 21 | CH LK fence remov (X6640300) | LF | 329 | $16.00 | $20.52 | $8.00 |
| 22 | Row/property corners (X6660445) | EACH | 46 | $375.00 | $250.00 | $475.00 |
| 23 | Engr FLD off A SPL (X6700410) | CAL MO | 30 | $1,125.00 | $1,030.00 | $1,710.00 |
| 24 | Traf cont & prot SPL (X7010216) | LS | 1 | $35,900 | $62,450 | $61,500 |
| 25 | Rem EX sign compl (X7240207) | EACH | 2 | $1,800.00 | $3,650.00 | $1,025.00 |
| 26 | Sign removal (X7240300) | EACH | 49 | $100.00 | $180.00 | $125.00 |
| 27 | PT PVT MK- raised med (X7800100) | SF | 161 | $3.65 | $3.45 | $4.00 |
| 28 | Paint PVT mark curb (X7800200) | LF | 1,110 | $3.65 | $3.45 | $4.00 |
| 29 | BLDG remov no 1 (Z0007601) | LS | 1 | $32,375 | $43,800 | $21,500 |
| 30 | BLDG remov no 2 (Z0007602) | LS | 1 | $12,750 | $23,100 | $9,800.00 |
| 31 | Construction layout (Z0013798) | LS | 1 | $200,700 | $50,000 | $402,000 |
| 32 | Detour signing (Z0016702) | LS | 1 | $16,250 | $19,400 | $23,000 |
| 33 | R&D non-FR asb BLD 1 (Z0049901) | LS | 1 | $7,885.00 | $0.01 | $14,250 |
| 34 | R&D non-FR asb BLD 2 (Z0049902) | LS | 1 | $7,885.00 | $0.01 | $3,000.00 |
| 35 | SS 1 wat MN 24 (Z0056654) | LF | 127 | $195.00 | $238.93 | $159.00 |
| 36 | Temp pavement (Z0062456) | SY | 3,695 | $62.35 | $68.10 | $77.00 |
| 37 | Trainees (Z0076600) | HR | 3,000 | $0.80 | $0.80 | $0.80 |
| 38 | Trainees TPG (Z0076604) | HR | 3,000 | $15.00 | $15.00 | $15.00 |
| 39 | Tree remov 6-15 (20100110) | UNIT | 227 | $1.00 | $40.00 | $82.50 |
| 40 | Tree remov over 15 (20100210) | UNIT | 1,050 | $1.00 | $55.00 | $92.00 |
| 41 | Earth excavation (20200100) | CY | 24,210 | $21.50 | $26.00 | $28.75 |
| 42 | Trench backfill (20800150) | CY | 2,453 | $67.75 | $88.00 | $40.00 |
| 43 | Geotech fab F/GR stab (21001000) | SY | 3,443 | $2.25 | $2.00 | $4.75 |
| 44 | Topsoil F & P 4 (21101615) | SY | 1,002 | $17.00 | $10.00 | $21.00 |
| 45 | Seeding CL 1A (25000110) | ACRE | 0.21 | $12,800 | $7,100.00 | $3,650.00 |
| 46 | Seeding CL 2A (25000210) | ACRE | 5.75 | $2,900.00 | $4,465.00 | $4,200.00 |
| 47 | Nitrogen fert nutr (25000400) | LB | 509 | $2.50 | $6.90 | $4.50 |
| 48 | Phosphorus fert nutr (25000500) | LB | 509 | $2.50 | $6.90 | $4.50 |
| 49 | Potassium fert nutr (25000600) | LB | 509 | $2.50 | $6.90 | $4.50 |
| 50 | Agr ground limestone (25000700) | TON | 11.30 | $195.00 | $420.00 | $700.00 |
| 51 | Mulch method 2 (25100115) | ACRE | 5.75 | $3,185.00 | $5,850.00 | $4,800.00 |
| 52 | Erosion contr blanket (25100630) | SY | 1,065 | $3.00 | $3.55 | $6.50 |
| 53 | Sodding salt tolerant (25200110) | SY | 1,002 | $25.50 | $61.00 | $25.75 |
| 54 | Supple watering (25200200) | UNIT | 14 | $185.00 | $900.00 | $1,620.00 |
| 55 | Temp eros contr seed (28000250) | LB | 566 | $6.85 | $6.35 | $10.00 |
| 56 | Temp ditch checks (28000305) | LF | 494 | $14.00 | $15.45 | $30.00 |
| 57 | Perimeter eros bar (28000400) | LF | 1,942 | $2.70 | $7.00 | $8.50 |
| 58 | Inlet & pipe protect (28000500) | EACH | 90 | $300.00 | $360.85 | $0.01 |
| 59 | Temp eros contr blank (28001100) | SY | 1,065 | $3.00 | $8.30 | $6.50 |
| 60 | Stone riprap CL A4 (28100107) | SY | 783 | $76.00 | $42.00 | $71.00 |
| 61 | Filter fabric (28200200) | SY | 412 | $3.30 | $2.50 | $11.50 |
| 62 | Sub gran mat A (31100200) | CY | 1,530 | $51.25 | $59.55 | $62.75 |
| 63 | Sub gran mat A 12 (31100910) | SY | 27,577 | $18.95 | $21.00 | $20.00 |
| 64 | Stab subbase 4 (31200100) | SY | 29,782 | $34.60 | $37.20 | $39.00 |
| 65 | Agg surf cse B (40200900) | CY | 4 | $250.00 | $167.50 | $106.00 |
| 66 | Bit matls PR CT (40600275) | LB | 5,234 | $3.15 | $3.91 | $4.50 |
| 67 | Bit matls tack CT (40600290) | LB | 3,463 | $2.80 | $2.07 | $2.50 |
| 68 | Long joint sealant (40600370) | LF | 2,939 | $7.30 | $12.73 | $15.00 |
| 69 | HMA BC IL-19.0 N70 (40603085) | TON | 468 | $163.00 | $151.13 | $177.50 |
| 70 | HMA SC IL-9.5 D N70 (40604062) | TON | 416 | $168.00 | $180.71 | $212.00 |
| 71 | HMA pavt FD 8 1/4 (40701846) | SY | 1,232 | $59.40 | $91.95 | $108.00 |
| 72 | PCC PVT 7 1/4 (42000205) | SY | 805 | $102.50 | $209.05 | $130.00 |
| 73 | PCC PVT 7 3/4 (42000215) | SY | 5,279 | $92.45 | $106.70 | $86.00 |
| 74 | PCC PVT 8 (42000300) | SY | 12 | $276.00 | $691.00 | $435.00 |
| 75 | PCC PVT 9 jointed (42000401) | SY | 14,380 | $119.00 | $139.50 | $98.00 |
| 76 | PCC driveway pavt 6 (42300200) | SY | 449 | $123.00 | $137.60 | $154.00 |
| 77 | PCC driveway pavt 8 (42300400) | SY | 870 | $142.00 | $162.35 | $159.50 |
| 78 | PC conc sidewalk 4 (42400100) | SF | 20,833 | $9.90 | $8.95 | $8.00 |
| 79 | Detectable warnings (42400800) | SF | 580 | $31.00 | $71.00 | $38.00 |
| 80 | Pavement rem (44000100) | SY | 18,127 | $11.00 | $8.90 | $10.50 |
| 81 | HMA surf rem 4 1/4 (44000166) | SY | 2,387 | $9.30 | $11.24 | $13.00 |
| 82 | Drive pavement rem (44000200) | SY | 2,063 | $26.00 | $12.00 | $9.25 |
| 83 | Comb curb gutter rem (44000500) | LF | 5,257 | $6.00 | $2.90 | $9.00 |
| 84 | Sidewalk rem (44000600) | SF | 8,744 | $2.00 | $2.00 | $1.25 |
| 85 | Median removal (44003100) | SF | 1,717 | $3.25 | $7.00 | $2.50 |
| 86 | Paved SHLD removal (44004250) | SY | 1,317 | $7.00 | $12.50 | $22.00 |
| 87 | Aggregate SHLDS B 6 (48101500) | SY | 35 | $51.00 | $58.85 | $50.00 |
| 88 | HMA shoulders 8 (48203029) | SY | 369 | $102.50 | $120.65 | $142.00 |
| 89 | Conc headwall removal (50104400) | EACH | 1 | $450.00 | $475.00 | $750.00 |
| 90 | Pipe culvert remov (50105220) | LF | 479 | $10.00 | $28.00 | $23.00 |
| 91 | P cul CL A 1 12 (542A0217) | LF | 252 | $77.00 | $75.71 | $66.00 |
| 92 | P cul CL A 1 18 (542A0223) | LF | 124 | $108.00 | $109.84 | $81.50 |
| 93 | P cul CL A 1 24 (542A0229) | LF | 88 | $112.50 | $184.71 | $102.00 |
| 94 | PRC flar end sec 12 (54213657) | EACH | 12 | $1,323.00 | $1,703.62 | $1,575.00 |
| 95 | PRC flar end sec 15 (54213660) | EACH | 4 | $1,710.00 | $1,954.54 | $1,750.00 |
| 96 | PRC flar end sec 18 (54213663) | EACH | 7 | $2,125.00 | $2,203.92 | $2,000.00 |
| 97 | PRC flar end sec 24 (54213669) | EACH | 3 | $2,745.00 | $2,638.75 | $2,650.00 |
| 98 | Storm sew CL A 1 12 (550A0050) | LF | 593 | $129.50 | $76.25 | $74.50 |
| 99 | Storm sew CL A 1 15 (550A0070) | LF | 2,093 | $101.45 | $88.12 | $89.00 |
| 100 | Storm sew CL A 1 18 (550A0090) | LF | 698 | $106.00 | $104.75 | $83.75 |
| 101 | Storm sew CL A 1 24 (550A0120) | LF | 355 | $139.50 | $175.13 | $106.00 |
| 102 | Storm sew CL A 1 30 (550A0140) | LF | 85 | $250.00 | $175.81 | $140.00 |
| 103 | Storm sew CL A 2 12 (550A0340) | LF | 32 | $134.25 | $98.75 | $73.50 |
| 104 | Storm sew CL A 2 15 (550A0360) | LF | 127 | $108.50 | $107.60 | $86.50 |
| 105 | Storm sewer rem 6 (55100200) | LF | 10 | $20.00 | $41.00 | $29.00 |
| 106 | Storm sewer rem 12 (55100500) | LF | 1,063 | $35.00 | $12.39 | $23.00 |
| 107 | Storm sewer rem 15 (55100700) | LF | 540 | $31.50 | $11.71 | $23.50 |
| 108 | Storm sewer rem 18 (55100900) | LF | 40 | $53.00 | $9.75 | $29.00 |
| 109 | Storm sewer rem 24 (55101200) | LF | 96 | $55.00 | $20.97 | $24.00 |
| 110 | CB TB T7G (60206600) | EACH | 1 | $4,975.00 | $7,532.11 | $5,300.00 |
| 111 | Man TA 4 dia T3V F&G (60219570) | EACH | 21 | $2,912.00 | $4,322.22 | $3,900.00 |
| 112 | Man TA 4D M in 604101 (60220005) | EACH | 1 | $3,600.00 | $4,565.18 | $3,650.00 |
| 113 | Inlets TA T3F&G (60235700) | EACH | 2 | $1,892.00 | $3,796.02 | $2,525.00 |
| 114 | Inlets TA T3V F&G (60235705) | EACH | 22 | $1,872.00 | $3,796.03 | $2,525.00 |
| 115 | Inlets TA T8G (60236200) | EACH | 5 | $1,935.00 | $3,796.03 | $2,525.00 |
| 116 | Inlets TA T11V F&G (60236825) | EACH | 2 | $1,892.00 | $3,796.02 | $2,500.00 |
| 117 | Inlet TA M inl 604101 (60238305) | EACH | 4 | $2,445.00 | $3,796.04 | $2,525.00 |
| 118 | Inlets TB T3F&G (60240220) | EACH | 2 | $1,785.00 | $3,205.61 | $2,850.00 |
| 119 | Inlets TB T3V F&G (60240222) | EACH | 18 | $1,785.00 | $3,205.63 | $2,850.00 |
| 120 | Inlets TB T11V F&G (60240312) | EACH | 2 | $1,785.00 | $3,205.61 | $2,875.00 |
| 121 | Inlets TB T24F&G (60240328) | EACH | 1 | $1,785.00 | $3,205.63 | $2,850.00 |
| 122 | Inlet TB M inl 604101 (60240361) | EACH | 1 | $2,340.00 | $3,205.63 | $2,850.00 |
| 123 | Remov inlets (60500060) | EACH | 18 | $895.00 | $522.00 | $575.00 |
| 124 | Comb CC&G TB6.12 (60603800) | LF | 297 | $62.85 | $103.25 | $125.00 |
| 125 | Comb CC&G TB6.12 mod (60604100) | LF | 3,091 | $37.50 | $72.05 | $80.00 |
| 126 | Comb CC&G TY B-6.24 (60605000) | LF | 9,576 | $32.60 | $60.85 | $62.00 |
| 127 | Comb CC&G TB9.12 mod (60606200) | LF | 635 | $74.35 | $99.65 | $138.00 |
| 128 | Comb CC&G TM2.12 (60608300) | LF | 861 | $74.45 | $77.18 | $132.00 |
| 129 | Conc median surf 4 (60618300) | SF | 20,340 | $8.60 | $16.05 | $4.50 |
| 130 | SPBGR TY A 9FT posts (63000003) | LF | 75 | $47.45 | $45.00 | $52.00 |
| 131 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $3,815.00 | $3,800.00 | $4,200.00 |
| 132 | Non SPL waste disposl (66900200) | CY | 650 | $190.00 | $136.88 | $103.00 |
| 133 | Soil disposal analy (66900530) | EACH | 9 | $1,272.00 | $1,350.00 | $1,550.00 |
| 134 | Reg sub P-const plan (66901001) | LS | 1 | $3,180.00 | $2,200.00 | $3,500.00 |
| 135 | Reg sub F con report (66901003) | LS | 1 | $1,060.00 | $2,200.00 | $1,200.00 |
| 136 | Reg sub mon (66901006) | CAL DAY | 25 | $1,060.00 | $990.00 | $1,400.00 |
| 137 | Mobilization (67100100) | LS | 1 | $617,000 | $520,550 | $392,037 |
| 138 | TR cont & prot 701501 (70102620) | LS | 1 | $4,000.00 | $6,900.00 | $4,350.00 |
| 139 | TR cont & prot 701801 (70102640) | LS | 1 | $980.00 | $2,250.00 | $1,100.00 |
| 140 | TR cont surveillance (70103815) | CAL DAY | 900 | $360.00 | $0.01 | $467.00 |
| 141 | Changeable message SN (70107025) | CAL DAY | 224 | $68.00 | $100.00 | $75.00 |
| 142 | Short term pavt mking (70300100) | LF | 2,436 | $2.35 | $4.90 | $4.25 |
| 143 | SHRT TRM pavt MK rem (70300150) | SF | 812 | $3.25 | $10.28 | $3.00 |
| 144 | Temp PVT MK LTR & sym paint (70300211) | SF | 599 | $4.25 | $4.00 | $5.00 |
| 145 | Temp PVT MK line 4 - paint (70300221) | LF | 25,604 | $0.85 | $0.80 | $1.00 |
| 146 | Temp PVT MK line 8 - paint (70300251) | LF | 688 | $1.05 | $1.00 | $1.25 |
| 147 | Temp PVT MK line 12 - paint (70300261) | LF | 1,192 | $4.25 | $4.00 | $5.00 |
| 148 | Temp PVT MK line 24 - paint (70300281) | LF | 789 | $5.30 | $5.00 | $6.00 |
| 149 | Temp conc barrier (70400100) | LF | 925 | $53.00 | $43.45 | $58.00 |
| 150 | Rel temp conc barrier (70400200) | LF | 260 | $14.30 | $31.10 | $16.00 |
| 151 | Imp attn temp NRD TL3 (70600250) | EACH | 4 | $7,600.00 | $8,500.00 | $8,350.00 |
| 152 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $690.00 | $400.00 | $750.00 |
| 153 | Sign panel T1 (72000100) | SF | 585 | $22.25 | $21.00 | $25.00 |
| 154 | Sign panel T3 (72000300) | SF | 170 | $61.20 | $57.75 | $68.00 |
| 155 | Terminal marker - DA (72501000) | EACH | 2 | $44.50 | $50.00 | $49.00 |
| 156 | Tub STL SN support BA (72700200) | LB | 1,331 | $15.40 | $14.50 | $17.00 |
| 157 | Teles STL sin support (72800100) | LF | 1,188 | $15.40 | $14.50 | $17.00 |
| 158 | Base tel STL sin supp (73100100) | EACH | 14 | $341.00 | $321.75 | $375.00 |
| 159 | Conc foundation (73400100) | CY | 8.40 | $3,550.00 | $3,350.00 | $3,950.00 |
| 160 | THPL PVT MK LTR & sym (78000100) | SF | 160 | $12.75 | $12.00 | $14.00 |
| 161 | THPL PVT MK line 4 (78000200) | LF | 5,619 | $3.20 | $3.00 | $3.50 |
| 162 | THPL PVT MK line 12 (78000600) | LF | 142 | $8.50 | $8.00 | $9.50 |
| 163 | Mod ureth PM LTR-sym (78009000) | SF | 439 | $26.50 | $25.00 | $29.00 |
| 164 | Mod ureth PM line 4 (78009004) | LF | 19,645 | $2.10 | $2.00 | $2.25 |
| 165 | Mod ureth PM line 8 (78009008) | LF | 1,028 | $3.20 | $3.00 | $3.50 |
| 166 | Mod ureth PM line 12 (78009012) | LF | 857 | $10.60 | $10.00 | $11.75 |
| 167 | Mod ureth PM line 18 (78009018) | LF | 193 | $15.90 | $15.00 | $17.50 |
| 168 | Mod ureth PM line 24 (78009024) | LF | 789 | $26.50 | $25.00 | $29.00 |
| 169 | Raised refl pavt MKR (78100100) | EACH | 189 | $80.00 | $84.00 | $88.00 |
| 170 | Grdrail ref type A (78200005) | EACH | 4 | $12.75 | $10.00 | $14.00 |
| 171 | Curb reflectors (78200020) | EACH | 200 | $12.75 | $15.00 | $14.00 |
| 172 | Raised ref PVT MK rem (78300200) | EACH | 14 | $115.00 | $100.00 | $36.00 |
| 173 | PVT MKG rem WTR blast (78300202) | SF | 12,832 | $1.05 | $1.00 | $1.25 |
| 174 | Elect serv install (80400100) | EACH | 1 | $16,960 | $16,000 | $18,700 |
| 175 | Undrgrd C galvs 3 (81028220) | LF | 396 | $82.70 | $78.00 | $91.00 |
| 176 | Undrgrd C PVC 2 (81028350) | LF | 177 | $69.00 | $65.00 | $76.00 |
| 177 | UD2#6#8G xlpuse 1.25P (81603112) | LF | 5,819 | $20.85 | $19.65 | $23.00 |
| 178 | EC C XLP use 1C 8 (81702120) | LF | 40 | $15.90 | $15.00 | $17.50 |
| 179 | EC C XLP use 1C 6 (81702130) | LF | 70 | $18.00 | $17.00 | $20.00 |
| 180 | Lum LED rdwy H (82110008) | EACH | 40 | $901.00 | $850.00 | $995.00 |
| 181 | LT cont basem 240V100 (82500350) | EACH | 1 | $15,672 | $14,785 | $17,250 |
| 182 | LT P A 35MH 10MA (83007400) | EACH | 40 | $5,273.00 | $4,975.00 | $5,800.00 |
| 183 | Light pole FDN 24D (83600200) | LF | 220 | $525.00 | $495.00 | $575.00 |
| 184 | Bkwy dev cou alu SKRT ovr SSS (83800506) | EACH | 160 | $313.00 | $295.00 | $345.00 |
| 185 | Rem LT unit salv (84200500) | EACH | 1 | $1,569.00 | $1,480.00 | $1,725.00 |
| 186 | Rem pole FDN (84200804) | EACH | 1 | $795.00 | $750.00 | $875.00 |
| 187 | Remov EX TS equip (89502375) | EACH | 2 | $20,100 | $18,960 | $22,150 |
| 188 | Remov EX handhole (89502380) | EACH | 14 | $488.00 | $460.00 | $540.00 |
| 189 | Remov EX DBL handhole (89502382) | EACH | 1 | $795.00 | $750.00 | $875.00 |
| 190 | Remov EX conc FDN (89502385) | EACH | 13 | $980.00 | $925.00 | $1,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.